| Location: | Vermont |
|---|---|
| Posted: | Mar 3, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Rutland Keywords: Construction (Non Building), Culvert Replacement, Stream Restoration Bid Description: The project includes removal of the existing 45' long, 7.5’ corrugated metal pipe arch, 50' concrete headwall, 17' concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20' span, 10' tall, and 45' long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...), removal of the existing CMPs, and installation of an 18' x 6' ...
State Government of Vermont
Bid Due: 6/19/2026
...INCLUDES THE REMOVAL OF A CONCRETE BOX CULVERT, RELOCATION OF CHANNEL, AND INSTALLATION ...
State Government of Vermont
Bid Due: 6/29/2026
...of the Wheelock Town Office is 1192 VT-122, Lyndonville, VT 05851. The project ...
State Government of Vermont
Bid Due: 6/25/2026
...this project includes the removal of a concrete box culvert, relocation of channel, ...
State of Vermont - Agency of Transportation
Bid Due: 6/19/2026