| Location: | Vermont |
|---|---|
| Posted: | Mar 3, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Rutland Keywords: Construction (Non Building), Culvert Replacement, Stream Restoration Bid Description: The project includes removal of the existing 45' long, 7.5’ corrugated metal pipe arch, 50' concrete headwall, 17' concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20' span, 10' tall, and 45' long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...Baptist Street Culvert Replacement, Williamstown Request Date: 5/15/2026 5:06:58 PM Open Date... Keywords: ...
State Government of Vermont
Bid Due: 6/10/2026
...Moretown Mountain Rd Culvert #1.44 Request Date: 5/28/2026 8:35:25 AM Open Date: Closing ...
State Government of Vermont
Bid Due: 6/15/2026
...Design Engineering: Green Valley Rd Culvert Replacement Request Date: 5/11/2026 11:30:19 AM Open...: ...
State Government of Vermont
Bid Due: 6/22/2026
...Town of Middlesex - Norton Rd Culvert Replacement Request Date: 6/1/2026 9:53:10 AM ...
State Government of Vermont
Bid Due: 6/19/2026