| Location: | Vermont |
|---|---|
| Posted: | Mar 3, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Rutland Keywords: Construction (Non Building), Culvert Replacement, Stream Restoration Bid Description: The project includes removal of the existing 45' long, 7.5’ corrugated metal pipe arch, 50' concrete headwall, 17' concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20' span, 10' tall, and 45' long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...Design Engineering: East Hill Rd Culvert Replacement Request Date: 9/28/2026 6:45:07 AM Open ...
State Government of Vermont
Bid Due: 10/23/2026
...) Engineering Design Services - Grassy Brook Road Culvert 1. Introduction The Town ...
State Government of Vermont
Bid Due: 11/18/2026
...CONSTRUCTION: Work to be performed under this project includes the removal of a ...
State of Vermont - Agency of Transportation
Bid Due: 10/23/2026