| Location: | North Carolina |
|---|---|
| Posted: | Apr 21, 2026 |
| Due: | May 21, 2026 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-ES-FO-FY26-KeeterTrainingCenterWaterproofing |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-ES-FO-FY26-KeeterTrainingCenterWaterproofing |
| Project Title: | Keeter Training Center Waterproofing |
| Description: | Excavation and removal of the soil against the building elevation to waterproof the below grade structure, and to back fill with new soil. During the removal of soil, landscaping and utilities will need to be considered. An inspection of the building drainage system will reveal any roof leader or foundation drain damage or malfunction. The contractor is expected to repair and replace as needed. Additionally, the ramped walkway to the building’s entrance forms a border of the excavation area. This ramp will require temporary shoring to be provided by the contractor during the waterproofing excavation. |
| Opening Date: | 5/21/2026 2:00 PM |
| Posted Date: | 4/21/2026 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ES-FO-FY26-KeeterTrainingCenterWaterproofing
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2026-05-21T14:00:00.0000000
|
Posted Date
*
2026-04-21T12:48:39.0000000Z
|
Primary Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
2026-04-30T04:00:00.0000000Z
|
Special Instructions
Bid Agent: Steven.Chelini@raleighnc.gov
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Patrick Barbour
|
|||
|
Description
Excavation and removal of the soil against the building elevation to waterproof the below grade structure, and to back fill with new soil. During the removal of soil, landscaping and utilities will need to be considered. An inspection of the building drainage system will reveal any roof leader or foundation drain damage or malfunction. The contractor is expected to repair and replace as needed. Additionally, the ramped walkway to the building’s entrance forms a border of the excavation area. This ramp will require temporary shoring to be provided by the contractor during the waterproofing excavation.
|
|||

With GovernmentContracts, you can:
...RFQ Number 2716 Construction Material Testing Submissions Due: 6-23-2026 05:00 PM Submissions Type: ...
City of Concord
Bid Due: 6/23/2026
...Project: FY27 Water and Sewer Infrastructure Construction - Contract 1 Ref. #: FY27-ITBCON-04...
City of Charlotte
Bid Due: 7/15/2026
...Solicitation Number: Doc1653309857 Project Title: Prime Contractors for Residential Construction... Services Acquisition and ...
State Government of North Carolina
Bid Due: 7/20/2026
...Project: FY27 Water and Sewer Infrastructure Construction - Contract 1 Ref. #: FY27-ITBCON-04...
City of Charlotte
Bid Due: 7/15/2026