| Location: | North Carolina |
|---|---|
| Posted: | Apr 21, 2026 |
| Due: | May 21, 2026 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-ES-FO-FY26-KeeterTrainingCenterWaterproofing |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-ES-FO-FY26-KeeterTrainingCenterWaterproofing |
| Project Title: | Keeter Training Center Waterproofing |
| Description: | Excavation and removal of the soil against the building elevation to waterproof the below grade structure, and to back fill with new soil. During the removal of soil, landscaping and utilities will need to be considered. An inspection of the building drainage system will reveal any roof leader or foundation drain damage or malfunction. The contractor is expected to repair and replace as needed. Additionally, the ramped walkway to the building’s entrance forms a border of the excavation area. This ramp will require temporary shoring to be provided by the contractor during the waterproofing excavation. |
| Opening Date: | 5/21/2026 2:00 PM |
| Posted Date: | 4/21/2026 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ES-FO-FY26-KeeterTrainingCenterWaterproofing
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2026-05-21T14:00:00.0000000
|
Posted Date
*
2026-04-21T12:48:39.0000000Z
|
Primary Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
2026-04-30T04:00:00.0000000Z
|
Special Instructions
Bid Agent: Steven.Chelini@raleighnc.gov
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Patrick Barbour
|
|||
|
Description
Excavation and removal of the soil against the building elevation to waterproof the below grade structure, and to back fill with new soil. During the removal of soil, landscaping and utilities will need to be considered. An inspection of the building drainage system will reveal any roof leader or foundation drain damage or malfunction. The contractor is expected to repair and replace as needed. Additionally, the ramped walkway to the building’s entrance forms a border of the excavation area. This ramp will require temporary shoring to be provided by the contractor during the waterproofing excavation.
|
|||

With GovernmentContracts, you can:
...May 28, 2026 | Advertisements Request for General Contractor Prequalification Submittals- New Roof... ...
North Carolina State University
Bid Due: 6/26/2026
...of Work: Remove existing roof system down to the existing structural deck and ...
Union County
Bid Due: 7/09/2026
...in the plans down to the existing structural deck and existing metal wall ...
City of Charlotte
Bid Due: 6/30/2026
...in the plans down to the existing structural deck and existing metal wall ...
City of Charlotte
Bid Due: 6/23/2026