| Location: | Connecticut |
|---|---|
| Posted: | Jul 22, 2025 |
| Due: | Aug 20, 2025 |
| Agency: | City of New Haven |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Whitney Avenue Improvements Phase 1
Addenda: 0
Release Date: 7/22/2025
Due Date: 8/20/2025
Roadway construction and traffic signal installation along Whitney Avenue from Canner Street to Cliff Street. The project will install a new asphalt bike path along the east side of the road and revise traffic patterns and intersection designs to increase safety for all roadway users. Typical work includes demolition, curb installation, concrete sidewalk, concrete sidewalk ramps and driveways, raised asphalt crosswalks and intersections, storm drainage, milling and paving, pavement markings, traffic signs, and traffic signal equipment. One traffic signal is proposed to be fully removed and replaced and one will be modified and upgraded.
Phase 1 encompasses the northern half of Whitney Avenue, with the future Phase 2 extending from Canner Street to Trumbull Street. The project will change the existing 5-lane cross section of Whitney Avenue into a 3-lane cross section with a dedicated parking lane and two-way cycletrack. The roadway revisions combined with the traffic signal upgrades will facilitate multimodal movement along the corridor for all modes of transportation. This project is funded by the State of Connecticut LOTCIP program.

With GovernmentContracts, you can:
...Response Events RSVP No Bid33 days, 17 hours, 53 minutes Post Information Posted ...
City of New Haven
Bid Due: 6/24/2026
...Draft Response Events RSVP No Bid23 days, 18 hours, 41 minutes Post Information ...
City of New Haven
Bid Due: 6/17/2026
...Events RSVP No Bid23 days, 17 hours, 47 minutes Post Information Posted At:Sun, ...
City of New Haven
Bid Due: 6/10/2026
...All dates & times in Eastern Time Draft Response No Bid34 days, 12 ...
Town of Berlin
Bid Due: 7/13/2026