North Campus Lighting-Truck Driver Training Area and Driveway Entrance

Location: North Carolina
Posted: Oct 28, 2025
Due: Nov 24, 2025
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 89-20251028-CCC
Publication URL: To access bid details, please log in.
Solicitation Number: 89-20251028-CCC
Project Title: North Campus Lighting-Truck Driver Training Area and Driveway Entrance
Description: Outdoor lighting and controls for North Campus area.
Opening Date: 11/24/2025 2:00 PM
Posted Date: 10/29/2025
Status: Open
Department: CLEVELAND COMMUNITY COLLEGE
Solicitation Number
*
89-20251028-CCC
Department
CLEVELAND COMMUNITY COLLEGE
Status Reason
Open
Opening Date
2025-11-24T14:00:00.0000000
Posted Date
*
2025-10-28T15:05:36.0000000Z
Commodity Code
Construction Services
Mandatory Conference/Site Visit
2025-11-03T05:00:00.0000000Z
Special Instructions
Non-Mandatory Meeting November 3rd at 2:00 PM
Solicitation Type
*
Select RFP IFB RFI
Owner
Lance Ashley
Description
Outdoor lighting and controls for North Campus area.
Attachments

Attachment Preview

STATE OF NORTH CAROLINA
STANDARD FORM OF INFORMAL CONTRACT
AND GENERAL CONDITIONS
FOR
Cleveland Community College
137 South Post Rd.
North Campus Lighting-Truck Driver Training Area and Driveway Entrance
SCOPE OF WORK
This project is to include all material and labor for the installation of new lighting and controls.
The areas to be illuminated are the Truck Driver Training Area, Parking Areas, New Gravel Dive
into the rear of the property and the Main Entry to the property as shown on the contract
drawings. Electrical service for the lighting will be provided from an existing electrical panel
located in the newly constructed building adjacent to the Truck Driver Training area.
NOTICE TO BIDDERS
There will be a non-mandatory Pre-Bid Meeting on November 3rd at 2:00 PM in the Jack Hunt
Campus Center Boardroom, 137 South Post Road, Shelby NC 28152.
Bids for this work will be received by:
Mark Fox
Cleveland Community College
137 South Post Rd.
Shelby, NC 28152
Bids will be publicly open on November 24th at 2:00 pm in the Boardroom at the Jack Hunt
Campus Center, 137 South Post Rd, Shelby, NC 28152. Please return bids as soon as
possible. More information on this project is available from Mark Fox foxm@clevelandcc.edu.
Contractors are hereby notified that for construction projects costing over $40,000, they must have proper
license under the State laws governing their respective trades and that North Carolina General Statute 87
will be observed in receiving and awarding contracts. General Contractors must have general license
classification as defined by 21 NCAC 12A Section .0200.
No bid may be withdrawn after the opening of bids for a period of 30 days. The Owner reserves the right
to reject any or all bids and waive informalities. Bids shall be made only on the BID/ACEPTANCE form
provided herein with all blank spaces for bids properly filled in and all signatures properly executed.
Please note on the envelope Bid : Attn: Mark Fox
Company Name
(License Number)
BID/ACCEPTANCE FORM
for
North Campus Lighting-Truck Driver Training Area and Driveway Entrance
The undersigned, as bidder, proposes and agrees if this bid is accepted to contract with
the State of North Carolina through Cleveland Community College for the furnishing of all
materials, equipment, and labor necessary to complete the construction of the work described in
these documents in full and complete accordance with plans, specifications, and contract
documents, and to the full and entire satisfaction Cleveland Community College for the sum of:
BASE BID:
Dollars $
$
Alternate #
1
2
3
Add/Deduct Alternate bid price Accepted (OWNER INITIALS ON EACH LINE
INDICATES ACCEPTANCE OF ALTERNATE)
Respectively submitted this
day of _____ ______20
Company Name:
Federal ID#:
By:
Witness:
Title:
(Owner, partner, corp. Pres. Or Vice President)
Address:
(Proprietorship or Partnership)
Attest: (corporation)
Email Address:
(Corporate Seal)
By:
License #:
Title:
(Corporation, Secretary /Ass't Secretary.)
ACCEPTED by the STATE OF NORTH CAROLINA
through the
Total amount of accepted by the owner, included base bid and bid alternates: $
BY:
Cleveland Community College
TITLE:
GENERAL CONDITIONS
1.
GENERAL
It is understood and agreed that by submitting a bid that the Contractor has examined these contract
documents, drawings and specifications and has visited the site of the Work and has satisfied himself
relative to the Work to be performed.
2.
DEFINITIONS
Owner: "Owner" shall mean, The State of North Carolina through Cleveland Community College.
Contractor: "Contractor" shall mean the entity that will provide the services for the Owner.
Designer: The designer(s) are those referred to within this contract, or their authorized
representatives. The Designer(s), as referred to herein, shall mean architect and/or engineer responsible
for preparing the project plans and specifications. They will be referred to hereinafter as if each were of
the singular number, masculine gender.
Contract Documents: “Contract Documents” shall consist of the Notice to Bidders; General Conditions
of the Contract; special conditions if applicable; Supplementary General Conditions; the drawing and
specifications, including all bulletins, addenda or other modifications of the drawings and specifications
incorporated into the documents prior to their execution; the bid; the contract; the performance bond if
applicable; and insurance certificates. All of these items together form the contract.
INTENT AND EXECUTION OF DOCUMENTS
The drawings and specifications are complementary, one to the other. That which is shown on the
drawings or called for in the specifications shall be as binding as if it were both called for and shown. The
intent of the drawings and specifications is to establish the scope of all labor, materials, transportation,
equipment, and any and all other things necessary to provide a complete job. In case of discrepancy or
disagreement in the Contract Documents, the order of precedence shall be: Form of Contract,
specifications, large-scale detail drawings, small-scale drawings.
In such cases where the nature of the work requires clarification by the Designer/ Owner, the Designer/
Owner shall furnish such clarification. Clarifications and drawings shall be consistent with the intent of the
Contract Documents, and shall become a part thereof.
4.
AS-BUILT MARKED-UP CONSTRUCTION DOCUMENTS
Contractor shall provide one complete set of legible “as-built” marked-up construction drawings and
specifications recording any and all changes made to the original design during the course of
construction. In the event no changes occurred, submit construction drawings and specifications set
with notation “No Changes.” The Designer/Owner must receive “As-built” marked-up construction
drawings and specifications before the final pay request can be processed.
5.
SUBMITTAL DATA
The Contractor awarded the contract shall submit all specified submittals to the Owner/Designer. A
minimum number of copies as specified by the owner, of all required submittal data pertaining to
construction, performance and general dimensional criteria of the components listed in the technical
specifications shall be submitted. No material or equipment shall be ordered or installed prior to written
approval of the submittals by the Designer/Owner. Failure to provide submittal data for review on
equipment listed in the technical specifications will result in removal of equipment by the Contractor at his
expense if the equipment is not in compliance with the specifications.
6.
SUBSTITUTIONS
In accordance with the provisions of G.S. 133-3, material, product, or equipment substitutions proposed
by the bidders to those specified herein can only be considered during the bidding phase until five (5)
days prior to the receipt of bids or by the date specified in the pre bid conference, when submitted to the
Designer with sufficient data to confirm material, product, or equipment equality. Proposed substitutions
submitted after this time will be considered only as potential change order.
Submittals for proposed substitutions shall include the following information:
a.
Name, address, and telephone number of manufacturer and supplier as
appropriate.
b.
Trade name, model or catalog designation.
c.
Product data including performance and test data, reference standards, and
technical descriptions of material, product, or equipment. Include color samples and
samples of available finishes as appropriate.
d.
Detailed comparison with specified products including performance capabilities,
warranties, and test results.
e.
Other pertinent data including data requested by the Designer to confirm product
equality.
If a proposed material, product, or equipment substitution is deemed equal by the Designer to those
specified, all bidders of record will be notified by Addendum.
7.
WORKING DRAWINGS AND SPECIFICATIONS AT THE JOB SITE
The contractor shall maintain, in readable condition at his job site one complete set of working drawings
and specifications for his work including all shop drawings. Such drawings and specifications shall be
available for use by the owner, designer or his authorized representative.
The contractor shall maintain at the job site, a day to day record of work in place that is at variance with
the contract documents. Such variations shall be fully noted on project drawings by the contractor and
submitted to the designer upon project completion and no later than 30 days after acceptance of the
project.
8.
MATERIALS, EQUIPMENT, EMPLOYEES
a.
The contractor shall, unless otherwise specified, supply and pay for all labor,
transportation, materials, tools, apparatus, lights, power, fuel, heat, sanitary facilities,
water, scaffolding and incidentals necessary for the completion of his work, and shall
install, maintain and remove all equipment of the construction, other utensils or things,
and be responsible for the safe, proper and lawful construction, maintenance and use of
same, and shall construct in the best and most workmanlike manner, a complete job and
everything incidental thereto, as shown on the plans, stated in the specifications, or
reasonably implied therefrom, all in accordance with the contract documents.
b. All materials shall be new and of quality specified, except where reclaimed material is
authorized herein and approved for use. Workmanship shall at all times be of a grade
accepted as the best practice of the particular trade involved, and as stipulated in written
standards of recognized organizations or institutes of the respective trades except as
exceeded or qualified by the specifications.
c.
Upon notice, the contractor shall furnish evidence as to quality of materials.
d.
Products are generally specified by ASTM or other reference standard and/or by
manufacturer's name and model number or trade name. When specified only by
reference standard, the Contractor may select any product meeting this standard, by any
manufacturer. When several products or manufacturers are specified as being equally
acceptable, the Contractor has the option of using any product and manufacturer
combination listed. However, the contractor shall be aware that the cited examples are
used only to denote the quality standard of product desired and that they do not restrict
bidders to a specific brand, make, manufacturer or specific name; that they are used only
to set forth and convey to bidders the general style, type, character and quality of product
desired; and that equivalent products will be acceptable. Request for substitution of
materials, items, or equipment shall be submitted to the designer for approval or
disapproval; the designer prior to the opening of bids shall make such approval or
disapproval. Alternate materials may be requested after the award if it can clearly be
demonstrated that it is an added benefit to the owner and the designer and owner
approves.
e.
The designer is the judge of equality for proposed substitution of products,
materials or equipment.
f.
If at any time during the construction and completion of the work covered by these
contract documents, the language, conduct, or attire of any workman of the various crafts
be adjudged a nuisance to the owner or designer, or if any workman be considered
detrimental to the work, the contractor shall order such parties removed immediately from
grounds.
g.
The Contractor shall cooperate with the designer and the owner in coordinating
construction activities.
h.
The Contractor shall maintain qualified personnel and effective supervision at the
site at all times during the project, and exercise the appropriate quality control program to
ensure compliance with the project drawings and specifications. The designer is
responsible for determining compliance with the drawings and specifications.
9.
CODES, PERMITS AND INSPECTIONS
The Contractor shall obtain the required permits, if required, give all notices, and comply with all laws,
ordinances, codes, rules and regulations bearing on the conduct of the work under this contract. If the
Contractor observes that the drawings and specifications are at variance therewith, he shall promptly
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...: Construction of a parking lot including permeable pavers and drainage system, earthwork, ...

State Government of North Carolina

Bid Due: 7/21/2026

...Solicitation Number: 820820052226HPRD Project Title: REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION... and construction administration ...

State Government of North Carolina

Bid Due: 6/19/2026

.../2026 Status: Open Department: STATE OF NC - CONSTRUCTION OFFICE Solicitation Number * ...

State Government of North Carolina

Bid Due: 6/11/2026

...- Rigging, Orchestra Shell and Lighting - BP116143 & 116144 - Theater Drapery ...

North Carolina State University

Bid Due: 6/12/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.