Preliminary and Final Design for State Project (SP) 5904-27

Location: Minnesota
Posted: Mar 3, 2026
Due: Mar 20, 2026
Agency: State Government of Minnesota
Type of Government: State & Local
Category:
  • 28 - Engines, Turbines, and Components
  • C - Architect and Engineering Services - Construction
Publication URL: To access bid details, please log in.
Preliminary and Final Design for State Project (SP) 5904-27

Brief Description: MnDOT requests letters of interest for preliminary and final design services for SP 5904-27. SP 5904-27 is a medium mill and overlay along Trunk Highway (TH) 30 from TH 75 in the City of Pipestone to 60th Avenue in the City of Lake Wilson. There will be ADA improvements and some storm sewer work within the City of Lake Wilson. This project also includes 5 bridge box culvert replacements (nos. 4566, 4468, 8173, 8716, 8172) and an additional 10 centerline culvert replacements (9 box culverts). The goal of this project is to assist MnDOT with project development and deliverables needed to bring SP 5904-27 to letting on schedule.

Date posted: 03/03/2026
Due date: 03/20/2026

Attachment Preview

1.0 Preliminary Design
1.12 Environmental Documentation – Class II Actions
1.13 Environmental Documentation – Class III Actions
1.21 Geometric Layouts – Level 1
1.22 Geometric Layouts – Level 2
2.0 Highway Design
2.11 Highway Design – Level 1
2.12 Highway Design – Level 2
2.13 Highway Design – Level 3
3.0 Bridge Design
3.11 Bridge and Structure Design – Level 1
3.12 Bridge and Structure Design – Level 2
3.13 Bridge and Structure Design – Level 3
3.14 Bridge and Structure Design – Level 4
4.0 Bridge Inspection
4.1 Structural Metals Inspection
4.4 High Mast Light Tower Weld Inspection
5.0 Environmental Studies
5.2 Air Quality Analysis
5.3 Noise Analysis & Abatement Design
5.4 Contaminated Property Investigation – Level I
5.51 Wetland Services – Level 1
5.52 Wetland Services – Level 2
5.53 Wetland Services – Level 3
6.0 Materials Testing
6.1 Geotechnical Studies
6.2 Highway Materials Testing
6.31 Geotechnical Laboratory Testing – Level 1
6.32 Geotechnical Laboratory Testing – Level 2
6.4 Vibration Analysis & Monitoring
6.5 Pile Load Testing
6.6 Standard Penetration & Rock Coring
6.7 Cone Penetration Test
6.8 Solid Stem Auger Drilling
6.9 Soils Analysis & Recommendations
6.10 Ground Penetration Radar Survey
6.11 Geotechnical Instrumentation
7.0 Transportation Planning
7.11 Planning – Class I
7.12 Planning – Class II
7.13 Planning – Class III
8.0 Right of Way Assistance
8.1 Direct Purchase
8.2 Relocation Assistance – Level 1
8.3 Field Title Investigation
8.4 Title Services
8.51 R/W Appraisals – Level 1
8.52 R/W Appraisals – Level 2
9.0 Land Surveys
9.11 Geodetic Control Surveying – Level 1
9.12 Geodetic Control Surveying – Level 2
9.13 Geodetic Control Surveying – Level 3
9.14 Geodetic Control Surveying – Level 4
9.2 Legal Description Preparation
9.3 Production of Right of Way Acquisition Plats
9.4 Design/Location Surveys
9.5 Right-of-Way Surveys
9.6 Land Surveys
10.0 Photogrammetric Mapping and Aerial Imagery
10.1 Photogrammetric Mapping
10.2 Aerial Imagery and Remote Sensing
11.0 Construction Inspection / Contract Administration
11.1 Construction Inspection Grading and Base, Bituminous and
Concrete
11.2 Construction Inspection Bridge Construction
11.3 Construction Surveying
11.4 Materials Sampling & Testing- Field Sampling and Testing
11.5 Materials Sampling & Testing- Plant Inspection/Bituminous
11.6 Materials Sampling and Testing- Plant Inspection/Concrete
11.7 Construction Contract Administration & Management
11.8 ADA Construction Inspection
12.0 Cultural Resources
12.11 Archaeological Work
12.12 Historic Archaeological Work
12.3 Geomorphology Studies
12.41 Architectural/History Studies (Identification/Evaluation Survey)
12.42 Architectural/History Studies (Historic Property Reg/Document)
12.5 Historic Architect Services
13.0 Hydraulic Structure Inspection, Location and Repair
13.1 Detailed Inspection/Location of Stormwater System Features
13.2 Video Inspection of Stormwater System Features
13.3 Cleaning of Stormwater System Features
14.0 Traffic Engineering
14.1 Traffic Signal Design
14.2 Traffic Signal Operations
14.3 Roadway Lighting Design
14.41 Temporary Traffic Control Plan Design & Special Provisions – Level 1
14.42 Temporary Traffic Control Plan Design & Special Provisions – Level 2
14.43 Temporary Traffic Control Plan Design & Special Provisions – Level 3
14.61 Signing Plan Design & Special Provisions – Level 1
14.62 Signing Plan Design & Special Provisions – Level 2
14.63 Signing Plan Design & Special Provisions – Level 3
14.7 Traffic Engineering Special Studies
14.81 Freeway Modeling – Level 1
14.82 Freeway Modeling – Level 2
14.83 Freeway Modeling – Level 3
15.0 Subsurface Utility Engineering
15.1 Subsurface Utility Engineering
16.0 Value Engineering
16.1 Value Engineering Study/Workshop
17.0 Roundabouts
17.1 Roundabout Design
18.0 Transportation Landscape Architecture
18.1 Transportation Landscape Architecture
19.0 Asbestos and Regulated Waste
19.1 Asbestos Regulated Material Assessment & Removal Oversight
19.2 Asbestos Abatement and Peeling Lead Paint Encapsulation
19.3 Regulated Waste Removal
19.4 Asbestos Containing Waste Material Management Oversight
19.5 Asbestos Containing Waste Material Abatement and Mgmt.
20.0 Project Management
20.11 Preconstruction – Level 1
20.12 Construction – Level 2
20.13 Contract Time Determination – Level 3
21.0 Public Engagement and Communications
21.1 Communications and Public Engagement Project Mgmt.
21.3 Marketing and Advertising Services
21.4 Digital Multimedia Production
21.5 Graphic Design
22.0 Transportation Research & Innovation Assistance (TRIA)
22.1 TRIA: Technology Transfer Activities
22.2 TRIA: Program Support
22.3 TRIA: Data Analysis and Implementation
22.4 Library Support Services
23.0 Document Review
23.11 Document Review Services – Level 1
23.12 Document Review Services – Level 2
23.21 Document Scanning and Data Processing Services – Level 1
23.22 Document Scanning and Data Processing Services – Level 2
23.31 Data Input Services – Level 1
23.32 Data Input Services – Level 2
23.4 Hosted Document Review Services
24.0 Building Services
24.1 Building Planning and Scoping
24.21 Architectural Design
24.22 Civil Engineering
24.23 Electrical Engineering
24.24 Mechanical Engineering
24.25 Structural Engineering
24.31 Heating, Ventilation, and Air Conditioning (HVAC) Commissioning
24.32 HVAC Test and Balance (TAB) Services
24.33 Building Automation Systems (BAS) Commissioning and Technical Service
24.4 Building Geotechnical Studies and Material Testing and Special Inspection
24.51 Water, Wastewater and Subsurface Sewage Treatment System Services – Level 1
24.52 Water, Wastewater and Subsurface Sewage Treatment System Services – Level 2
24.53 Water, Wastewater and Subsurface Sewage Treatment System Services – Level 3
24.6 Owners Representative and Construction Contract Administration
PRE-QUALIFICATION ANNOUNCEMENT
Minnesota Department of Transportation (MnDOT)
Preliminary and Final Design for State Project (SP) 5904-27
MnDOT Contract No. 1059618
Minnesota’s Commitment to Diversity and Inclusion
The State of Minnesota is committed to diversity and inclusion in its public procurement process. The goal is to
ensure that those providing goods and services to the state are representative of Minnesota’s communities and
include businesses owned by minorities, women, veterans and those with substantial physical disabilities. Creating
broader opportunities for historically under-represented groups provides for additional options and greater
competition in the marketplace, creates stronger relationships and engagement within the state’s communities and
fosters economic development and equality.
To further this commitment, the Minnesota Department of Administration operates a program for Minnesota-
based small businesses owned by minorities, women, veterans and those with substantial physical disabilities. For
additional information on this program, or to determine eligibility, please call 651-296-2600 or go to
www.mmd.admin.state.mn.us/mn02001.html.
This document is available in alternative formats for persons with disabilities by calling Gretchen Warner-Rhubee at 320-
214-6355 or for persons who are hearing, or speech impaired by calling the Minnesota Relay Service at 1-800-627-3529. For
other information on disability rights and protections, contact MnDOT’s Americans with Disabilities Act (ADA) Coordinator.
This request for letters of interest does not obligate MnDOT to award a contract or complete the project, and MnDOT
reserves the right to cancel the Announcement if it is considered to be in its best interest.
As of July 1, 2025, certain terms are unenforceable in state contracts. See Minnesota Statutes §16C.05 subdivision 8.
PROJECT SPECIFIC INFORMATION
Project Overview
MnDOT requests letters of interest for preliminary and final design services for SP 5904-27. SP 5904-27 is a medium mill
and overlay along Trunk Highway (TH) 30 from TH 75 in the City of Pipestone to 60th Avenue in the City of Lake Wilson.
There will be ADA improvements and some storm sewer work within the City of Lake Wilson. This project also includes 5
bridge box culvert replacements (nos. 4566, 4468, 8173, 8716, 8172) and an additional 10 centerline culvert replacements
(9 box culverts).
Project Goal
The goal of this project is to assist MnDOT with project development and deliverables needed to bring SP 5904-27 to letting
on schedule.
Scope of Work and Deliverables
The products and services needed for this project include but are not limited to; project management, public and agency
involvement, environmental work, supplemental surveying, geometric layout, construction limit roll plot, traffic
engineering, hydraulic design, environmental permitting, detailed design, utility coordination, and post-letting construction
design support. State’s Bridge Office will be designing the bridge box culvert plans.
See Exhibit A, posted separately from this Announcement, for the full scope of work.
(CSS/CM Last Updated 01/20/2026)
2
Quality Management Plan (QMP) and Quality Assurance and Quality Control (QA/QC) Procedures.
The successful responder will develop a project specific QMP that specifies how Contractor will perform QA/QC activities
throughout the duration of the project to ensure delivery of a quality product in a timely manner that conforms to
established contract requirements. The successful responder will be required to submit the project specific QMP to State’s
Project Manager for approval within five business days of Notice to Proceed.
Responder Requirements
In order to be eligible as a responder to submit a letter of interest to this project, the prime consultant must 1) be pre-
qualified in at least of one work type identified on the project, 2) be pre-qualified at the time the project is posted, 3) add
value to the project, and 4) appear on the Official List posted with the project. The "Official List," identifies the consultants
who are eligible to submit for this specific project.
If the responder meets the eligibility requirements above but is not pre-qualified for the remaining work types deemed
necessary for project, they must make arrangements to subcontract with firms that are pre-qualified in those work types.
When applicable, the consultant must identify in the letter of interest their sub-consultant(s), and which work type(s) the
sub-consultant(s) will be completing. If there are not firms currently listed on the "Official List" for an identified work
type(s), the consultant may provide the work themselves or they may subcontract with any firm.
QUESTIONS
Prospective, pre-qualified responders who have any questions regarding this Announcement must submit questions, by e-
mail, to the Contract Administrator:
Gretchen Warner-Rhubee
Gretchen.Warner-Rhubee@state.mn.us
IMPORTANT: Include the MnDOT Contract Number and Solicitation Title in the subject line of the email.
All questions and answers will be posted, verbatim, on MnDOT’s Consultant Services Web Page, at:
http://www.dot.state.mn.us/consult/notices.html. Potential pre-qualified responders are responsible for checking the web
page for any addendums to this announcement and any questions that have been answered.
Questions regarding this Announcement must be received, via e-mail, by the Contact Administrator identified above no
later than 2:00PM Central Time on 03/10/2026.
MnDOT anticipates posting answers to all questions received by 2:00PM Central Time on 03/13/2026.
No other MnDOT personnel are allowed to discuss this Announcement before the letter of interest submission deadline.
Contact regarding this announcement with any personnel not listed above could result in disqualification.
LETTER OF INTEREST CONTENT AND FORMAT
The letter of interest must adhere to the following format.
1. Contact Information
The purpose of this section is for the responders to identify their contact information. Responder’s must list the company’s
full legal name, business address, contact person’s name and title, telephone number, fax number and e-mail address (as
available).
2. Eligibility
The purpose of this section is for responders to confirm that they, and (if applicable) their subcontractor(s) are pre-qualified
in the required work type(s).
3. Project Understanding
The purpose of this section is for the responders to demonstrate their understanding of the project. Responders must
clearly state their understanding of the project objectives, goals, and tasks to show or demonstrate their view of the nature
3
of the project. Responders should demonstrate their understanding by using their own words rather than simply repeating
what is listed in the announcement.
4. Responder Experience & Qualifications (Company & Key Personnel)
The purpose of this section is for responders to provide information detailing the background and experience of the
company, and the project personnel. Responders must:
a. Provide an outline of their background and experience, addressing any minimum requirements (if applicable) with
examples of similar work done.
b. List the personnel who will be working on this project, specifically detailing their training and work experience.
If subconsultants are to be used on this project, responders must also outline their background and experience, including
examples of similar work done by each subconsultant. Responders must also provide a list of the subconsultants’ personnel
who will perform work on the project, detailing their training and work experience.
Note that no change in personnel assigned to the project will be permitted without the written approval of MnDOT’s
Project Manager.
Qualification and experience of the “firm” should be demonstrated by the experience of the personnel proposed.
5. Work Plan – Project Approach
The purpose of this section is for responders to present their work plan. Responders must provide a detailed work plan,
which must identify the major tasks to be accomplished. Responders must be sure to not only describe what will be done
but explain how each task will be accomplished. These tasks will be used as a scheduling and management tool, as well as
the basis for invoicing. The detailed work plan must present:
a. The Overall Project Approach
b. A Breakdown of the Project Tasks, detailing the tasks, and how they will be completed
c. Deliverable Due Dates and an Overall Project Schedule
d. A List of Personnel Working on the Project, including details of each person’s role, by task
6. Deliverables
Responders must provide a clear and detailed description, format, and schedule of the deliverables to be provided in order
to meet the needs of the project.
7. Forms, Documents and Certifications
Responders must complete and submit all required forms, documents, and certifications, required under any other section
of this Announcement. These forms, documents and certifications will NOT be included in any page limit set for this
Announcement, as applicable.
7.1. Required Forms and Documents
Responders must complete and submit the forms and documents required under any other section of this
Announcement.
Forms/Documents on File with MnDOT Consultant Services:
If applicable, check the forms/documents that are on file with MnDOT Consultant Services:
Workforce and Equal Pay Declaration Page Resident Vendor Form
If these forms/documents are on file with MnDOT Consultant Services, then no need to resubmit the
documents until the form/document end date. All other forms and documents required MUST be attached to
response.
7.2. Solicitation of Targeted Group Business (TGB) Firms Statement: Responders must provide the following
statement and signature:
I hereby recognize that an 8.2% TGB goal has been established for this Announcement in accordance with the
Special Provisions posted with the Announcement. I understand that MnDOT’s Office of Civil Rights is required
4
to clear the successful responder’s attainment of the goal, or Good Faith Efforts made to attain the goal, before
a contract can be awarded. I understand that failure to meet the goal or show a Good Faith Efforts to meet the
goal, will deem the successful responder as non-responsive, resulting in rejection of the letter of interest.
Signature
Print Name
Date
7.3. Solicitation of Veteran-Owned Small Businesses Statement: Responders must provide the following statement
and signature:
I hereby recognize that a 0.0% Veteran goal has been established for this Announcement in accordance with
the Special Provisions posted with the Announcement. I understand that MnDOT’s Office of Civil Rights is
required to clear the successful responder’s attainment of the goal, or Good Faith Efforts made to attain the
goal, before a contract can be awarded. I understand that failure to meet the goal or show a Good Faith Efforts
to meet the goal, will deem the successful responder as non-responsive, resulting in rejection of the letter of
interest.
Signature
Print Name
Date
PAGE LIMITS
The responder’s submittal must adhere to the page limitations identified in the following table. If any of the responder’s
documents exceed the page limits identified, the excess pages will not be reviewed, regardless of content.
Document
Maximum Number of Requirements
Pages
Requirement for all N/A
1. Responders MUST use Calibri font in their response
pages
2. No smaller than 11-point font and single line, 0-point spacing
3. The font may not have condensed, narrow, or compressed in the
font name
Letter of Interest
7 pages
1. Single-sided pages, no larger than 8.5”x11”
2. As noted above, Item’s 1 through 6 of the Letter of Interest
Content and Format section must fall within these page limits
Letter of Interest
2 additional pages
1. Single-sided pages, no larger than 11”x17”
2. These 2 pages are designated for schedules and/or maps only. If
used for any content other than schedules and/or maps, the
pages will not be reviewed.
Note: Cover letter and required forms and certifications are NOT included as part of the page limit.
RESPONSE SUBMITTAL INSTRUCTIONS
IMPORTANT NOTE TO RESPONDERS: You should receive a confirmation email from MnDOT. If you do not, please reach
out to the Contract Administrator to ensure the response was received.
All responses must be electronically submitted, via e-mail, to the attention of:
Gretchen Warner-Rhubee, Contract Administrator
Gretchen.Warner-Rhubee@state.mn.us
Copy Consultant Services Forms Inbox: ProfessionalTechnicalContractForms.dot@state.mn.us
IMPORTANT: Include the MnDOT Contract Number and Solicitation Title in the subject line of the email.
All responses must be received by MnDOT no later 2:00PM Central Time on 03/20/2026.
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...,Excavation,Manhole Rehabilitation,Pipe Lining,Removal and Replacement of pipe,Sewer Lateral T-lining... Utility Cleaning, Sewer Lateral ...

WSB

Bid Due: 6/23/2026

...Rehabilitation, Sewer Utility Cleaning, Sewer Lateral T-lining, Construction, Televising Sewers, Pipe Lining..., Removal ...

WSB

Bid Due: 6/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.