Oberly and Washington Terrace Improvements (Project No. 26005-130)

Location: Florida
Posted: Jan 13, 2026
Due: Feb 19, 2026
Agency: City of St. Petersburg
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: Oberly and Washington Terrace Improvements (Project No. 26005-130)

Addenda: 0

Release Date: 1/13/2026

Due Date: 2/19/2026

Follow
Oberly and Washington Terrace Improvements (Project No. 26005-130)
Request For Qualification
Engineering
92597
Project ID: RFQ- 26 - 037
Release Date: Tuesday, January 13, 2026
· Due Date: Thursday, February 19, 2026 12:00am
Posted Tuesday, January 13, 2026 3:00pm
All dates & times in Eastern Time
Draft Response Events RSVP No Bid36 days, 3 hours, 26 minutes


Post Information

Posted At:Tue, Jan 13, 2026 3:00 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The City of St. Petersburg, Florida (“City”) is seeking the services of a qualified Architectural/Engineering (“A/E”) firms to provide engineering design services for the Oberly and Washington Terrace Improvements project, located in the City of St. Petersburg.



Background

The City of St. Petersburg’s primary drinking water source is served by the Cosme Water Treatment Plant in Northern Hillsborough County. The water is transmitted to St. Petersburg through two larger diameter transmission mains (one 48-inch-diameter and one 36-inch-diameter), a booster pump station [Gulf-to-Bay (GTB)], and two pump stations: Oberly and Washington Terrace. The Oberly (OBE) and Washington Terrace (WAS) pump stations serve as the high-pressure pump stations delivering potable water to the City’s service area.

The 48-inch transmission main delivers water to OBE, which has a firm pumping capacity of 64 million gallons per day (MGD), while the 36-inch transmission main directs water to WAS, with a firm pumping capacity of 30 MGD. Additionally, GTB is available to boost pressure in the 36-inch main, when necessary, though its use is limited to specific, infrequent conditions. The pump stations have above ground storage and chemical treatment.

In 2025, HDR Engineering, Inc. completed a “Treated Water Transmission, Storage, and Pumping Facilities Plan” (Facility Plan) for the City of St. Petersburg. The plan outlined a strategic roadmap for the rehabilitation and sustainability of water services for the City. The Facility Plan identified and prioritized capital improvement projects to allow the City to mitigate risks, enhance operational efficiency, and meet future demands.

The Oberly and Washington Improvements includes the following capital projects that were included in the Facility Plan:

OBE-1 Oberly Storage Tanks

OBE-2 Oberly Pumps

OBE-5 Oberly Valves and Yard Piping

WAS-1 Washington Terrace Storage Tanks

WAS-2 Washington Terrace Pumps

WAS-5 Washington Terrace Valves and Yard Piping

Although no additional projects are planned to be included at this time, the scope of the Oberly and Washington Terrace Improvements project may be added to or subtracted from depending on various factors including funding, schedule, and other constraints and opportunities.

The project is planned to be completed by a Construction Manager at Risk.



Timeline

Solicitation Published:
January 13, 2026
Deadline for Questions:
February 3, 2026, 12:00pm
Deadline for Question Response:
February 10, 2026, 12:00am
Deadline for Submittals:
February 19, 2026, 12:00am
Evaluation/Shortlisting (Non-Mandatory):
March 3, 2026, 1:00pm
One 4th St. N
St. Petersburg, FL
Conference Room 800
Interviews/Selections:
March 31, 2026
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Engineering Services for the Cherry Hill Direct Potable Reuse Water Treatment Facility Contract...

Polk County

Bid Due: 6/24/2026

...Project ID: Title: Construction of 16''- Potable Water Main Extension (Bartow Rd. - ...

City of Lakeland

Bid Due: 6/11/2026

...sodium chloride (NaCl) for use in ion exchange resin regeneration at Toho Water ...

Toho Water Authority

Bid Due: 6/04/2026

...Master Meter Octave Series Water Meters to accurately measure and record reclaimed water ...

Collier County

Bid Due: 6/12/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.