| Location: | Washington |
|---|---|
| Posted: | Aug 26, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | EW-C6620 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes the removal of existing railroad ties, and the construction and installation of new precast concrete deck panels and steel railing on top of the existing steel trestles near Rock Lake along the Palouse to Cascades State Park Trail. This includes but is not limited to the following:
1) TEMPORARY EROSION & SEDIMENT CONTROLS
2) GRADING AND SURFACING
3) TRESTLE EE-128 REPAIRS
4) TRESTLE EE-130 REPAIRS
5) TRESTLE EE-130 ROCK WALL REPAIRS
6) CONTAINMENT AND FALSEWORK

With GovernmentContracts, you can:
...,Construction,Culverts, Waterways, Stormwater Channels,Curbs,Cutting/Recycling (Concrete or Asphalt... Marking, Utility Street Construction and Excavation, ...
City of Wenatchee
Bid Due: 9/16/2026
...stabilization. I. Construction of outlet works piping including grout encasement and concrete encasement... ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/30/2026
...Concrete Coring 150-07-Boxes, Shoring (For Construction Worker Protection) 959-26-Breakwater Construction... Structure 940-29-Construction, Elevated ...
State Government of Washington
Bid Due: 11/20/2026