| Location: | Washington |
|---|---|
| Posted: | Aug 26, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | EW-C6620 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes the removal of existing railroad ties, and the construction and installation of new precast concrete deck panels and steel railing on top of the existing steel trestles near Rock Lake along the Palouse to Cascades State Park Trail. This includes but is not limited to the following:
1) TEMPORARY EROSION & SEDIMENT CONTROLS
2) GRADING AND SURFACING
3) TRESTLE EE-128 REPAIRS
4) TRESTLE EE-130 REPAIRS
5) TRESTLE EE-130 ROCK WALL REPAIRS
6) CONTAINMENT AND FALSEWORK

With GovernmentContracts, you can:
...curbs and gutters, drainage pond and ditches, erosion control, illumination system, permanent signing..., ...
State Government of Washington
Bid Due: 10/21/2026
..., ESC lead, erosion control and water pollution prevention, bark or wood chip ...
State Government of Washington
Bid Due: 9/23/2026
..., ESC lead, erosion control and water pollution prevention, bark or wood chip ...
State Government of Washington
Bid Due: 9/30/2026
...and restoration of a portion of Clear Creek, as well as a temporary ...
State Government of Washington
Bid Due: 11/04/2026