| Location: | Washington |
|---|---|
| Posted: | Aug 26, 2026 |
| Due: | Sep 3, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | EW-C6620 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes the removal of existing railroad ties, and the construction and installation of new precast concrete deck panels and steel railing on top of the existing steel trestles near Rock Lake along the Palouse to Cascades State Park Trail. This includes but is not limited to the following:
1) TEMPORARY EROSION & SEDIMENT CONTROLS
2) GRADING AND SURFACING
3) TRESTLE EE-128 REPAIRS
4) TRESTLE EE-130 REPAIRS
5) TRESTLE EE-130 ROCK WALL REPAIRS
6) CONTAINMENT AND FALSEWORK

With GovernmentContracts, you can:
...and install three galvanized steel piles with fiberglass bird caps, as well as ...
State Government of Washington
Bid Due: 9/29/2026
...Solicitation Information Title Portable Construction Equipment and Accessories Attachments- SW... Portable Construction Equipment ...
State Government of Washington
Bid Due: 10/08/2026
.... The reservoir is a ground-level, welded steel storage tank that was constructed ...
City of Dupont
Bid Due: 9/25/2026
...support upcoming military construction and modern industrial facility realignments, PSNS&IMF...-gauge steel storage cabinets, ...
DEPT OF DEFENSE
Bid Due: 10/16/2026