| Location: | Arizona |
|---|---|
| Posted: | Oct 15, 2026 |
| Due: | Oct 29, 2026 |
| Agency: | City of Tucson |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 270112 |
| Publication URL: | To access bid details, please log in. |
Project ID: 270112
Title: Sahuara and Copper/Flower Bicycle Boulevards - FHWA
Addenda: 1
Release Date: 9/24/2026
Due Date: 10/29/2026
The Sahuara Bicycle Boulevard and the Copper/Flower Bicycle Boulevard proposed work is located within the City of Tucson in Pima County, Arizona. This project provides roadway improvements consisting of traffic calming, BikeHAWK signals, signing, pavement markings and landscaping. The work also includes, but is not limited to, construction of speed humps, traffic circles, chicanes, concrete curb, concrete sidewalk, curb access ramps, concrete driveway aprons, traffic signals and traffic signal modifications, pavement markings and signing, landscaping and other related incidental work as shown on City of Tucson Plan No. U-2025-048.
This project is utilizing funds provided by the Federal Highway Administration (FHWA). Any resulting contract will contain the FHWA required terms and conditions contained herein.

With GovernmentContracts, you can:
...Authority (NTUA) is hereby contacting qualified contractors to provide construction services...) and is ...
Navajo Tribal Utility Authority
Bid Due: 11/24/2026
...: Total Small Business Set-Aside (FAR 19.5) Product Service Code: Y1LB - CONSTRUCTION ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026
...19.5) Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 2/13/2028
...: Total Small Business Set-Aside (FAR 19.5) Product Service Code: Y1LB - CONSTRUCTION ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026