| Location: | Illinois |
|---|---|
| Posted: | Sep 6, 2026 |
| Due: | Oct 22, 2026 |
| Agency: | Metra Rail |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 206297 |
| Publication URL: | To access bid details, please log in. |
Project Description: The purpose of this project is for construction services for a new bridge on the north side of the existing bridge to support the second track on the Milwaukee District North Line in Rondout, IL. The construction of MDN Bridge A318 Main 2 requires the following: installation of deep foundations, abutments, steel superstructure; installation of a walkway, railing, and conduits on one side of the bridge; installation of retaining wall with railings; placement of riprap; and grading and earthwork.

With GovernmentContracts, you can:
..., and conduits on one side of the bridge; installation of retaining wall ...
Metra Rail
Bid Due: 11/05/2026
...control measures and maintenance, earthwork, asphalt paving, parking lot striping, concrete curbs...
City of Lake Forest
Bid Due: 11/18/2026