| Location: | North Carolina |
|---|---|
| Posted: | May 18, 2026 |
| Due: | Jul 9, 2026 |
| Agency: | Lenoir County Public Schools |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Location
Northwest Elementary School
1701 Old Well Rd
Kinston, NC 28504
1. PURPOSE
Lenoir County Public Schools is soliciting quotations from qualified HVAC contractors
for the replacement of the existing HVAC system serving Northwest Elementary School
Auditorium. The project includes installation of a new rooftop heat pump unit, installation
of a DuctSox air distribution system, removal of existing Bard wall-mounted HVAC units,
and patching/restoration of associated wall openings.
The contractor shall provide a complete turnkey installation including all labor, materials,
equipment, permits, supervision, startup, testing, balancing, and disposal required for a
fully operational system.
The full RFQ can be found
HERE.
A pre-bid site visit is: Mandatory
Date:May 27, 2026
Time: 10:00 am
7. SUBMISSION INSTRUCTIONS
Submit quotations electronically or in sealed envelope to:
Patrick Phillippe
Director of Facilities
pphillippe@lenoir.k12.nc.us
(252)-527-1407
Subject Line:
“Northwest Elementary Auditorium HVAC RFQ”

With GovernmentContracts, you can:
...manhole pump station, including installation of one manhole, pumps, piping, and valves... at ...
City of Charlotte
Bid Due: 8/04/2026
...manhole pump station, including installation of one manhole, pumps, piping, and valves... at ...
City of Charlotte
Bid Due: 8/04/2026
...the existing UV disinfection equipment and non-potable water pumps. The project also includes ...
City of Charlotte
Bid Due: 8/19/2026
...the existing UV disinfection equipment and non-potable water pumps. The project also includes ...
City of Charlotte
Bid Due: 8/19/2026