| Location: | Missouri |
|---|---|
| Posted: | Jun 2, 2025 |
| Due: | Jun 17, 2025 |
| Agency: | Farmington city |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
2025 Plumbing Install External Sewer Grinder Pumps or External Groundwater Sump Pumps at Selected Residences
The City of Farmington is accepting bids for “2025 Plumbing Install External Sewer Grinder Pumps or External Groundwater Sump Pumps at Selected Residences”. The project shall be defined as providing supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and ... [more] |
Status: Open
Closes: 6/17/2025 10:00:00 AM |

With GovernmentContracts, you can:
...Bid Title: Water and Sewer Service Line Replacements Category: Construction Services Bid List... ...
City of Osage Beach
Bid Due: 12/09/2026
..., Storm Sewer Extensions, 2 RRFB Sign Assemblies OBTAINING THE BIDDING DOCUMENTS Information...
Drexel Technologies
Bid Due: 12/08/2026
...sewers, sidewalk, street lighting, signing, and striping. Publication Date/Time: 10/29/2026 8:30 AM...
City of St. Peters
Bid Due: 11/20/2026
...drainage design, water main/distribution design, sanitary sewer design, traffic engineering services...
Drexel Technologies
Bid Due: 11/24/2026