| Location: | North Carolina |
|---|---|
| Posted: | Aug 14, 2025 |
| Due: | Aug 29, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 274-ES-FO-FY26-DixParkWindowBoarding |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 274-ES-FO-FY26-DixParkWindowBoarding |
| Project Title: | Dix Park Stabilization – Window Boarding |
| Description: | All windows, glass doors, and glass present in a metal or wood door, including all windows on the first level of buildings and windows/doors within 8 feet of ground level, will be covered with minimum ¾ inch Severe Weather CCX grade plywood. This is to also include anything below the ground level that may be accessible or accessible from a horizontal reach from the ground or platform area within 4 feet. Plywood should be secured into the framing around the windows and doors. All doors should remain operable (screws into the metal part of the door are acceptable). Windows and doors of buildings that have current cages/bars are to be covered with plywood as well. Any foundation penetrations that would lead to access to the building basements for crawl space will be covered with same plywood material. |
| Opening Date: | 8/29/2025 2:00 PM |
| Posted Date: | 8/15/2025 |
| Status: | Open |
| Department: | CITY OF RALEIGH |
|
Solicitation Number
*
274-ES-FO-FY26-DixParkWindowBoarding
|
Department
CITY OF RALEIGH
|
Status Reason
Open
|
|
|
Opening Date
2025-08-29T14:00:00.0000000
|
Posted Date
*
2025-08-14T19:52:50.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
Project Manager Contact: Tommy Mangum e-mail: Tommy.Mangum@raleighnc.gov
|
||
|
Description
All windows, glass doors, and glass present in a metal or wood door, including all windows on the first level of buildings and windows/doors within 8 feet of ground level, will be covered with minimum ¾ inch Severe Weather CCX grade plywood. This is to also include anything below the ground level that may be accessible or accessible from a horizontal reach from the ground or platform area within 4 feet. Plywood should be secured into the framing around the windows and doors. All doors should remain operable (screws into the metal part of the door are acceptable). Windows and doors of buildings that have current cages/bars are to be covered with plywood as well. Any foundation penetrations that would lead to access to the building basements for crawl space will be covered with same plywood material.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...Follow Electric 5k-6k Draw Bar Pull (DBP) Burden Carrier Tractor Active Contract Opportunity... ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 7/07/2026
...* 2026-05-20T14:08:33.0000000Z Primary Commodity Code Plants and ornamental trees Mandatory Conference... be viewed ...
State Government of North Carolina
Bid Due: 6/30/2026
...-22T14:00:00.0000000 Posted Date * 2026-05-19T16:53:05.0000000Z Primary Commodity Code Recycling... at www.meckprocure.com. The blue ...
State Government of North Carolina
Bid Due: 7/22/2026
...Commodity Code Project management Mandatory Conference/Site Visit 2026-06-18T04:00:00.0000000Z Special... carefully. The full solicitation ...
State Government of North Carolina
Bid Due: 7/08/2026