Dix Park Stabilization – Window Boarding

Location: North Carolina
Posted: Aug 14, 2025
Due: Aug 29, 2025
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 274-ES-FO-FY26-DixParkWindowBoarding
Publication URL: To access bid details, please log in.
Solicitation Number: 274-ES-FO-FY26-DixParkWindowBoarding
Project Title: Dix Park Stabilization – Window Boarding
Description: All windows, glass doors, and glass present in a metal or wood door, including all windows on the first level of buildings and windows/doors within 8 feet of ground level, will be covered with minimum ¾ inch Severe Weather CCX grade plywood. This is to also include anything below the ground level that may be accessible or accessible from a horizontal reach from the ground or platform area within 4 feet. Plywood should be secured into the framing around the windows and doors. All doors should remain operable (screws into the metal part of the door are acceptable). Windows and doors of buildings that have current cages/bars are to be covered with plywood as well. Any foundation penetrations that would lead to access to the building basements for crawl space will be covered with same plywood material.
Opening Date: 8/29/2025 2:00 PM
Posted Date: 8/15/2025
Status: Open
Department: CITY OF RALEIGH
Solicitation Number
*
274-ES-FO-FY26-DixParkWindowBoarding
Department
CITY OF RALEIGH
Status Reason
Open
Opening Date
2025-08-29T14:00:00.0000000
Posted Date
*
2025-08-14T19:52:50.0000000Z
Commodity Code
Construction Services
Mandatory Conference/Site Visit
Special Instructions
Project Manager Contact: Tommy Mangum e-mail: Tommy.Mangum@raleighnc.gov
Description
All windows, glass doors, and glass present in a metal or wood door, including all windows on the first level of buildings and windows/doors within 8 feet of ground level, will be covered with minimum ¾ inch Severe Weather CCX grade plywood. This is to also include anything below the ground level that may be accessible or accessible from a horizontal reach from the ground or platform area within 4 feet. Plywood should be secured into the framing around the windows and doors. All doors should remain operable (screws into the metal part of the door are acceptable). Windows and doors of buildings that have current cages/bars are to be covered with plywood as well. Any foundation penetrations that would lead to access to the building basements for crawl space will be covered with same plywood material.
Attachments
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Type: Rehab Street Name: 1009 Rosada Dr Bid walk time: 6/11/2026 9:30 AM ...

City of Charlotte

Bid Due: 6/18/2026

...Wall Panels WC-20A: Doors, Frames, Hardware WC-21: Drywall, Framing, EIFS, Acoustical Ceilings, Wall...

North Carolina State University

Bid Due: 7/09/2026

..., Frames, Hardware WC21: Drywall, Framing, EIFS, Acoustical Ceilings, Wall Panels, & Foam...

North Carolina State University

Bid Due: 6/18/2026

...05A - Structural Steel and Misc. Metals 06A - Finish Carpentry and Casework ...

State Government of North Carolina

Bid Due: 6/12/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.