| Location: | Illinois |
|---|---|
| Posted: | Jul 31, 2026 |
| Due: | Aug 7, 2026 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6-S176-Q-00378-00 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
EVALUATION IS BASED ON LOWEST PRICE, TECHNICALLY ACCEPTABLE CRITERIA
Argonne National Laboratory is seeking a Femtosecond Laser System, including installation and on-site operator training, for use at Argonne National Laboratory (ANL).
Please review the Request for Quotation ANL-70 dated July 31, 2026, and all attached technical requirements for the complete required system capabilities, and provide documentation and evidence to support the offeror’s adherence to the requirements no later than 12:00 PM CDT on August 7, 2026.
We will need a response to the following documentation and considerations:
Completed and signed ANL-70 Request for Quotation
List of capabilities aligned with the Technical Requirements, including evidence demonstrating compliance with the required specifications for the fully integrated femtosecond laser system, installation, and on-site operator training
Country of Origin*
Lead time from Purchase Order to final delivery to Argonne, FOB Destination / DAP Lemont, IL 60439, including proposed schedule for delivery, installation, and on-site operator training
Completed and signed ANL-70B Reps and Certs
Please send any questions to the Contracting Officer, Molly Hunter, at mollyhunter@anl.gov. We are looking forward to reviewing your offer.
* Country of Origin should be consistent with the definition stated in FAR 52.225-1, Buy American—Supplies, in which “the cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind as those that the agency determines are not mined, produced, or manufactured in sufficient and reasonably available commercial quantities of a satisfactory quality are treated as domestic. Components of unknown origin are treated as foreign.”

With GovernmentContracts, you can:
Follow 88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS-
DEPT OF DEFENSE
Bid Due: 9/16/2026
DEPARTMENT OF WATER MANAGEMENT Construction 76305 1334862 1334862: Block Level Lead Service Line
City of Chicago
Bid Due: 10/01/2026
Project: C26FI103384111 - Request for Proposals (RFP) for Construction Services for the Red
Chicago Transit Authority
Bid Due: 10/07/2026
Project: Mechanical Engineering Design Services Ref. #: 214619 Department: Purchasing Type: Other Status:
Metra Rail
Bid Due: 9/25/2026