| Location: | North Carolina |
|---|---|
| Posted: | Aug 14, 2025 |
| Due: | Aug 19, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 8062025HubSoft |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 8062025HubSoft |
| Project Title: | Hubert Water Treatment Plant Softener Tanks 1 & 2 Rehabilitation Project |
| Description: | The successful proposer (Contractor) shall furnish all permits, materials, equipment, and labor necessary to perform all tasks described in the Scope of Work, including: removing and disposing of existing media; performing a visual inspection of the tank, and repairing defective areas (including spot and patch welding) as needed; preparing and painting interior and exterior surfaces; pressure testing; replacement of brine inlet valve and electronic actuator; and, installing new gravel and media in a total of two (2) steel tank softener vessel. Work will be performed at ONWASA’s Hubert Water Treatment Plant, 374 Hubert Blvd, Hubert, NC 28539. Work is to begin within seven (7) calendar days from receipt of a Notice to Proceed, and all work on the project shall be completed, with the tank ready for service, within 30 calendar days from that date. |
| Opening Date: | 8/19/2025 2:00 PM |
| Posted Date: | 8/14/2025 |
| Status: | Open |
| Department: | ONSLOW WATER & SEWER AUTHORITY |
|
Solicitation Number
*
8062025HubSoft
|
Department
ONSLOW WATER & SEWER AUTHORITY
|
Status Reason
Open
|
|
|
Opening Date
2025-08-19T14:00:00.0000000
|
Posted Date
*
2025-08-14T13:47:48.0000000Z
|
Commodity Code
Water and sewer utilities
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
The successful proposer (Contractor) shall furnish all permits, materials, equipment, and labor necessary to perform all tasks described in the Scope of Work, including: removing and disposing of existing media; performing a visual inspection of the tank, and repairing defective areas (including spot and patch welding) as needed; preparing and painting interior and exterior surfaces; pressure testing; replacement of brine inlet valve and electronic actuator; and, installing new gravel and media in a total of two (2) steel tank softener vessel. Work will be performed at ONWASA’s Hubert Water Treatment Plant, 374 Hubert Blvd, Hubert, NC 28539. Work is to begin within seven (7) calendar days from receipt of a Notice to Proceed, and all work on the project shall be completed, with the tank ready for service, within 30 calendar days from that date.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...WINTERVILLE FIRE- RESCUE-EMS designated training ground) * Exterior painting with two coats of ...
Winterville town
Bid Due: 6/22/2026
...exterior light fixtures Exterior and interior painting Demolition, disposal, and site restoration The... ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...Protection Specialties WC25D: Interior and Exterior Signage WC25N: Rigging, Drapery, & Equipment WC26... ...
North Carolina State University
Bid Due: 6/18/2026
...areas do not require strip or painting by the contractor. The aircrafts' exterior ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 10/09/2026