| Location: | Alaska |
|---|---|
| Posted: | May 9, 2025 |
| Due: | May 30, 2025 |
| Agency: | State Government of Alaska |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CFAPT01278 |
| Publication URL: | To access bid details, please log in. |
This federally funded project at Ted Stevens Anchorage International Airport will install a double cantilever box frame sliding gate across Taxilane V to replace the existing gate. This work will include removal of pavement, trenching for installation of new conduit and conductors; installation of a new electrical/control panel; installation of the new gate, access controls, and bollards; installation of site lighting and a camera; relocation of the existing fence outside the taxilane object free area; and installation of new fencing.
more >
With GovernmentContracts, you can:
...square feet. The building program, structural system, mechanical systems, electrical systems, access... control ...
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Bid Due: 6/29/2026
..., excavation and backfill, temporary power gate operators, temporary access controls, curb and ...
State Government of Alaska
Bid Due: 6/10/2026