| Location: | California |
|---|---|
| Posted: | Jun 27, 2025 |
| Due: | Jul 1, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 31100PR250000048 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Install and test of new Automatic Transfer Switch (ATS) connected to building's emergency generator.
The emergency generator is a Cummins Onan model OT225. The current ATS is Cummins Onan OT 225, rated at 225 Amps and 480 Volts. The replacement ATS shall be capable of monitoring both power sources, signals generator set startup, automatically transfer power, and returns the load to the primary power source once stable utility power is available.
UPDATE:
We are amending the solicitation IAW with the Scope of Work. We believe there may have been confusion among all vendors.
“Install new (up to date) like in kind ATS capable of meeting or exceeding rated amperage and voltage of the installed emergency generator”.
The ATS must meet the following requirements:
1. Made in America.
2. A modern version of the existing ATS that is compatible with the system.
3. Meets or exceeds all the specification of the current ATS.
It does not have to be the same that is currently installed.
Any prior offerors, if you would like to resubmit your proposal, please do so by the close of business on 1 July 2025.
Delivery and specifications are the most important evaluation factorw now.
-------------------------------------------------------------------------------------------------------------------------
Must include a 12 month warranty and dispoal plan for old equipment.
Past Performance and certified statement of lead time is required in addition to a pricing schedule sheet.
Please contact the COR: Mr. Ruijin Garcia (ruijin.g.garcia@uscg.mil) and EMC Ashley Cruz (Base Electrician): ashley.j.cruz@uscg.mil
| May 12, 2025 | [Solicitation (Original)] Replacement of Automatic Transfer Switch (ATS) to Emergency Generator |
| May 13, 2025 | [Solicitation (Updated)] Replacement of Automatic Transfer Switch (ATS) to Emergency Generator |
| May 27, 2025 | [Solicitation (Updated)] Replacement of Automatic Transfer Switch (ATS) to Emergency Generator |
| Jun 30, 2025 | [Solicitation (Updated)] Replacement of Automatic Transfer Switch (ATS) to Emergency Generator |

With GovernmentContracts, you can:
...a Government Furnished 200kW Generator with an automatic transfer switch. Project will require ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/16/2026