| Location: | Texas |
|---|---|
| Posted: | Jul 21, 2025 |
| Due: | Sep 16, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB2025-055 |
| Publication URL: | To access bid details, please log in. |
RFB2025-055
Posted
Melanie Wade
(254) 750-8098
melaniew@wacotx.gov
9/16/2025
2:00 PM
M1612
21+ Days for Solicitation Notice
7/21/2025
7/21/2025 2:07 am
91063-Public Utilities: Water, Sewer And Gas Maintenance And Repair;
91242-Drilling and Boring Services, Horizontal Directional (HDD and HDB);
91345-Construction, Sewer And Storm Drain;
91356-Construction, Utility/Underground Projects;
91360-Construction, Water System/Plants, Main And Service Line;
91381-Maintenance And Repair, Sewer And Storm Drain (Including Removal);
91392-Maintenance And Repair, Water System, Main And Service Line;
96185-Utility Services, Water;
The City of Waco has issued this solicitation for the Speegleville Road Utility Improvements Project. The project shall generally consist of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 1,950 linear feet of 24-inch PVC C900 waterline, an approximately 1,275 linear feet horizontal directional drilling crossing of the Middle Bosque River utilizing 42-Inch HDPE casing piping and 30-Inch HDPE waterline piping, approximately 1,530 linear feet of 18-inch PVC gravity wastewater line, manholes, approximately 1,600 linear feet horizontal directional drilling crossing of the Middle Bosque River utilizing 16-Inch HDPE force main, temporary by-pass system, abandonment of existing waterlines/wastewater lines, surface replacement, road repair and all necessary components as shown on the project drawings and as specified herein.
This RFB requires prequalification of General Contractors and Horizontal Directional Drilling subcontractors. General Contractors are required to submit the questionnaire and other required information along with the prequalification application of any Horizontal Directional Drilling Subcontractor(s) the General Contractor would like the City to consider, which will then be reviewed by the City and/or its agents. Based on the criteria set out in this solicitation, bids will only be accepted from a General Contractor if said bid involves a prequalified Horizontal Directional Drilling Subcontractor. Any bid which fails to include a prequalified Horizontal Directional Drilling Subcontractor will be returned as non-responsive.

With GovernmentContracts, you can:
...Project: Annual Requirements Contract for Temporary General and Heavy Labor Services Ref. #: ...
Richardson city
Bid Due: 6/25/2026
...temporary employment agencies to provide support staff (administrative, clerical, labor, etc.) based... 6100019521 ...
City of San Antonio
Bid Due: 6/15/2026
...Contractor shall be required to furnish all material, labor, tools, supplies, permits, equipment..., ...
Houston Community College
Bid Due: 6/17/2026
...services, photography, staffing and temporary labor services, maintenance and operations, nor any...
Frisco Independent School District
Bid Due: 7/09/2026