Project Description: Faulconbridge Rd 5749 will include the lining 556 LF of 42 inch CMP and 227 LF of 15 inch RCP with CIPP. Eight existing drainage structures will be removed and replaced and two additional structures will be added. 125 LF of 15" RCP will be removed and replaced. Chemical grouting joint repair will also be installed at approximately 20 locations throughout the 42" CMP. The estimated cost of the project is $941,629.20.

With GovernmentContracts, you can:
...Project: Bonlyn Storm Drainage Improvement Project Ref. #: FY27-ITBCON-05 Department: Charlotte...: Jun 16th ...
City of Charlotte
Bid Due: 6/16/2026
...Project: Bonlyn Storm Drainage Improvement Project Ref. #: FY27-ITBCON-05 Department: Charlotte...: Jun 16th ...
City of Charlotte
Bid Due: 6/16/2026
...Project: 3144 Freedom Drive Storm Drainage Improvement Project Ref. #: FY27-ITBCon-03 Department... Close ...
City of Charlotte
Bid Due: 6/09/2026
...Project: 3144 Freedom Drive Storm Drainage Improvement Project Ref. #: FY27-ITBCon-03 Department... Close ...
City of Charlotte
Bid Due: 6/09/2026