| Location: | Pennsylvania |
|---|---|
| Posted: | Jun 2, 2025 |
| Due: | Jun 5, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BOROUGH OF CHAMBERSBURG, FRANKLIN COUNTY |
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes all material, labor, and equipment necessary to replace approximately 1425 lineal feet of existing cast-in-place reinforced concrete box culvert and open channel storm sewer with a new 2’x6’ precast concrete box culvert, replacement inlets, replace existing storm sewer piping, replace ADA ramps, replace concrete curb and sidewalk, trench paving and street overlay, lawn restoration as shown on Contract Documents prepared by GHD. The project is located in Chambersburg Borough, Franklin County, Pennsylvania.

With GovernmentContracts, you can:
...piping and supports. * Installation of concrete slabs and pads, pre-cast concrete walls, ...
PennBid
Bid Due: 6/19/2026
...includes the construction of 871 linear feet of concrete sidewalk, 4 ADA curb ...
PennBid
Bid Due: 7/07/2026
...curb ramps, concrete driveway aprons, pavement mill and overlay resurfacing, asphalt pavement base... ...
PennBid
Bid Due: 6/12/2026
...for replacement of existing CMP with SLCPP, associated pavement, concrete curb and sidewalk ...
PennBid
Bid Due: 7/09/2026