| Location: | Connecticut |
|---|---|
| Posted: | Mar 27, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB No. 2026-014 |
| Publication URL: | To access bid details, please log in. |
Fuel Tank & Oil/Water Separator Improvements - GON
The project consists of: the removal & disposal of one (1) 4,000-gallon single wall fiberglass reinforced concrete underground fuel oil tank in front of the airport terminal building including the installation of a temporary 2,000-gallon rectangular aboveground fuel oil tank with connections to the terminal buildings existing boiler system. The project also includes the removal, disposal and replacement of a 1,000-gallon oil/water separator at the airport's maintenance facility. The contract time for completion of all work is within one hundred (100) calendar days from the date specified in the "Notice to Proceed".
Kevin Lynch Connecticut Airport Authority Windsor Locks CT, 06096 United States Tel: Fax: procure@ctairports.org

With GovernmentContracts, you can:
...of bituminous pavement, installation of new concrete curbing, driveway ramps, integral concrete sidewalks... ...
Town of Beacon Falls
Bid Due: 7/02/2026
..., replacement of the existing parking lot, installation of a new drainage system, ...
Bloomfield town
Bid Due: 12/26/2026
...and Nicoll St. Work will include demolition, construction of a raised asphalt intersection, ...
City of New Haven
Bid Due: 6/17/2026
...The project is a renovation and addition of an existing animal shelter. The ...
City of New Haven
Bid Due: 6/24/2026