| Location: | Washington |
|---|---|
| Posted: | Jun 25, 2025 |
| Due: | Jul 9, 2025 |
| Agency: | City of Sumner |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
CITY OF SUMNER REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE WASTEWATER TREATMENT FACILITY BIOSOLIDS EQUIPMENT MODERNIZATION PROJECT
The City of Sumner solicits interest from consulting firms with expertise in construction of
wastewater facility projects. This request is for Construction Management services for the
construction of the Wastewater Treatment Facility Biosolids Equipment Modernization. This
agreement will be for approximately 24 months in duration with the option for the City of Sumner
to extend it for additional time and money if necessary. Consultants will be considered for the
following project.
The City of Sumner reserves the right to amend terms of this “Request for Qualifications” (RFQ)
to circulate various addenda, or to reject all responses and withdraw the RFQ at any time,
regardless of how much time and effort consultants have spent on their responses. Sumner may
waive informalities in the process of evaluating responses. If not rejected, the City may require the
correction of any deficiency in a response and accept the corrected response. This solicitation does
not obligate Sumner to accept or contact for any services. Any resulting contract is subject to
approval and may be rejected if it fails to confirm to City contracting specifications and guidelines.
Project Description
The work to be performed by the consultant consists of Construction Management Services for the
aforementioned project, in which the scope will include but is not limited to construction
management services, construction inspection services, construction testing services,
commissioning agent, and construction administration/document control services.
This project will construct upgrades to the solids handling and solids treatment processes at the
existing City of Sumner Wastewater Treatment Plant. These improvements will include
construction of an expansion to the existing Solids Handling Building, to include the installation
of the new indirect biosolids dryer, thermal fluid heaters, and all associated equipment
encompassed in the biosolids dryer scope of supply. The project will also include construction of
a temporary haul truck loading bay to facilitate demolition of existing facilities. Modifications to
existing treatment systems, structures and processes will include: replacement of the existing
thickened primary sludge pumps in the existing Scum Pump Building, demolition of the existing
dissolved air floatation thickener and associated equipment in Equipment Building 2 and the
installation of a new rotary drum thickener and associated thickened waste activated sludge pumps,
replacement of the existing digested sludge pumps, replacement of the existing thickening and
dewatering polymer systems and replacement of the existing air gap system in the existing Solids
Handling Building. The existing dewatered sludge conveyance system will also be reconfigured
including rehabilitation of the existing dewatered sludge storage hopper, modifications to existing
conveyors (both temporary and permanent) and installation of new conveyors. Other project
elements include the demolition of the existing waste gas burner and the installation of a new
digester gas treatment system to include a hydrogen sulfide and moisture removal and digester gas
compression, as well as the installation of a new enclosed waste gas flare. In addition, the existing
submersible pumps in Plant Drain Pump Station No. 1 will be replaced and the walls of the existing
centrate storage tank will be raised six feet. The project will also include installation of new and
modifications to existing electrical power distribution and control equipment to support the new
improvements, including the installation of a new standby generator with subbase fuel tank in a
sound attenuating enclosure. Finally, the project will include construction of a new hammerhead
on State Street just outside the entrance to the plant and new security fencing and access gates.
Draft construction plans and specifications are available at the City’s website
https://connects.sumnerwa.gov/wwtf-biosolids-modernization
.
Expected Tasks
The City is seeking a full suite of Construction Management, Construction Inspection, and
Construction Administration/Document Control services. The following tasks are examples of
some that are expected of the consultant:

With GovernmentContracts, you can:
...engineering services for building renovations, new construction, and demolition. Consultants will provide... to: ...
State Government of Washington
Bid Due: 6/04/2026
...renovations, new construction, and demolition. Consultants will provide estimates, schedules, plans..., Structural, Cost ...
Seattle Housing Authority (SHA)
Bid Due: 6/04/2026
...renovations, new construction, and demolition. Consultants will provide estimates, schedules, plans..., Structural, Cost ...
Seattle Housing Authority
Bid Due: 6/11/2026
...renovations, new construction, and demolition. Consultants will provide estimates, schedules, plans..., Structural, Cost ...
Seattle Housing Authority (SHA)
Bid Due: 6/11/2026