Regent St Reconstruction

Location: Wisconsin
Posted: Jun 10, 2026
Due: Nov 5, 2026
Agency: City of Madison
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
PROJECTS
Helpful Hint: You can use the arrows to sort the projects by values in each column. Use to sort ascending order. Use to sort descending order.
Due Date
Contract #
Project #
Project


Future Project

9794 14812 Evergreen Ave, Ohio Ave, Center Ave, & Willard Ave Reconstruction

07/09/26
9792 16063 2026 Sports Courts Resurfacing


Future Project

9791 16290 S Franklin Ave, Ridge St, Sylvan Ave Reconstruction

07/09/26
9790 15525 Glenway Backyard Pipe Burst

05/14/26
9788 16257 CIPP 2026 Woodvale Drive

06/11/26
9787 15624 Newville (Kenneth) Park Redevelopment

08/27/26
9782 13016 Far West Public Works Operations Building

04/23/26
9780 15513 CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026

05/21/26
9776 16122 Overture Center Garage


Future Project

9775 15233 Regent St Reconstruction

04/23/26
9766 14880 Metro Transit Kennedy Road On-Route Bus Charger


Future Project

9764 15956 Normal Hall at Olin Park Rehabilitation


Future Project

9758 16158 Milwaukee Street & Sprecher Road Traffic Signal


Future Project

9757 17085 Imagination Center at Reindahl Park

04/23/26
9756 16157 Sherman Shabazz Public Improvements


Future Project

9753 15987 Carver St, Martin St, Field St, & Floyd Pl Recon

04/02/26
9751 16144 2026 Parking Garage Maintenance


Future Project

9745 15642 Madison Municipal Building Flagpole Installation

03/26/26
9740 10452 Unit Well 12 Upgrade


Future Project

9738 13599 Utility Materials Handling Site A/E


Future Project

9734 15961 Valley Ridge Greenway Repair

08/27/26
9733 15960 Willows Biobasin Repair


Future Project

9732 15959 Wexford Greenway Dredging

07/09/26
9731 15958 Memorial High School Greenway / Faircrest Cunnette Repair

03/19/26
9730 15957 Manitou Box Culvert Replacement - Phase 2


Future Project

9729 15986 Carver St, Martin St, Catlin Pl, Frazer Pl, & Dunn Pl Recon


Future Project

9728 15985 Carver St, Martin St, Dickson Pl, Irwin Pl, & Dodge St Recon

02/26/26
9726 15078 Country Grove Singletrack Trail Improvements 2025

02/26/26
9718 15134 Hoyt Park Lot Reconstruction


Future Project

9715 14626 Lake Forest Lift Station

03/19/26
9712 15452 Yahara Hills Golf Course Well Transfer Pipe

05/21/26
9709 15614 Yahara Hills Golf Cart Paths

10/30/25
9697 12730B Monona Terrace Tunnel Lighting

12/18/25
9694 15049 Warner Park Pickleball Courts and Worthington Park Futsal Court


Future Project

9691 00100001 First record-do not delete

09/18/25
9687 15078 Country Grove Singletrack Trail Improvements 2025


Future Project

9682 12730 Monona Terrace Tunnel Fan Replacement

09/18/25
9681 67001 Dairy Dr Campground Demo and Site Restoration

09/18/25
9679 14601 Olin Park Pedestrian Bridge Replacement


Future Project

9674 14940 346 E Lakeside


Future Project

9671 17044 South District Police Station and Property & Evidence Storage Facility

08/21/25
9670 15642 Madison Municipal Building Flagpole Installation


Future Project

9668 14627 Mayflower Lift Station


Future Project

9666 15703 Breese Stevens Field - Athletic Field Replacement

09/04/25
9659 14122 Engineering Services Bldg Locker Rm Remodel

09/04/25
9657 15697 Stricker Pond Forebay Dredging


Future Project

9656 17040 Fire Station 06 Remodel

06/05/25
9655 15434 Fire Station 8 Lighting Retrofit

06/20/25
9654 15699 CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025

07/24/25
9653 15623 Playground Improvements for Kennedy, Ontario and Portland Parks

07/24/25
9653 15635 Playground Improvements for Kennedy, Ontario and Portland Parks

07/24/25
9653 15636 Playground Improvements for Kennedy, Ontario and Portland Parks

05/22/25
9651 10069 Madison Public Market

04/17/25
9648 8214556X 2020 Parking Garage Maintenance


Future Project

9647 14625 Badger Lane Lift Station Replacement

04/17/25
9646 15055 2025 Sport Court Resurfacings

04/17/25
9642 14015 RENNEBOHM PARK EAST TENNIS COURTS 2025

07/24/25
9638 15078 Country Grove Singletrack Trail Improvements 2025

04/03/25
9633 15612 CIPP 2025 Churchill Dr

03/27/25
9627 14431 South Madison Demolitions and Site Restorations

03/27/25
9627 15223 South Madison Demolitions and Site Restorations

06/20/25
9626 15387 Mid Town Hydraulic Improvements

02/13/25
9621 45300 Semi Permanent Epoxy Pavement Marking

03/27/25
9617 15527 Solar PV - Water Utility Olin Ave

01/30/25
9616 14624 Truax Apartments PV - Roofing Alterations

03/19/26
9613 15513 CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026

06/20/25
9612 15512 CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025

04/03/25
9610 17085 Imagination Center at Reindahl Park

05/21/26
9606 11230 Metro Transit Phase 3

11/14/24
9605 14915 Prairie Hills Detention Basin Improvements

04/02/26
9593 15165 Pressure Zone 4 Interstate Crossing

05/22/25
9591 15271 Capital City Trail Storm Sewer


Future Project

9590 14717 Warner Lagoon Dredging


Future Project

9589 15427 Northeast Regional Pond Repair

07/09/26
9588 15426 West Badger Mill Creek Greenway Improvements

08/27/26
9587 15425 Attic Angels Greenway Repairs

12/17/26
9585 13863 Castle Creek Channel Improvements at Warner Park


Future Project

9584 15356 MMSD Drying Beds

01/16/25
9583 14514 CCB Remodel - DCR 104&108A

10/17/24
9582 13065 LED Street Light - Federally Funded

11/07/24
9572 15429 N Lake Street Boat Ramp

08/29/24
9561 15332 Paterson Street Sanitary Sewer Assessment District - 2024

02/13/25
9551 15145 Rennebohm Park Sprayground

01/16/25
9550 15148 Yahara Hills Golf Course Pump House and Irrigation Improvement


Future Project

9549 15342 Bikeways 2025

01/30/25
9547 15327 East Madison Bikeways: Safe St

07/11/24
9546 15215 MWU Olin Ave. Admin Bldg Roof Replacement

08/29/24
9536 15295 CIPP Lining Rehabilitation - Blair Street Sanitary Sewer Siphon

11/21/24
9535 15294 CIPP UV Lining Ph2 2024

12/18/25
9532 13160 Library Service + Support - Siding Replacement

02/13/25
9529 14598 2024 Park Sun Shelter Installation

06/13/24
9527 15215 MWU Olin Ave. Admin Bldg Roof Replacement

04/25/24
9526 14015A 2024 Rennebohm Park East Tennis Courts

04/25/24
9525 15055 2025 Sport Court Resurfacings

06/13/24
9522 13573 20 is Plenty

06/27/24
9521 15109 2024 Playground Improvements

11/14/24
9517 14370 Pheasant Branch Greenway Enhancement


Future Project

9510 14074 BPS 213 Booster Upgrade

04/04/24
9509 15055 2025 Sport Court Resurfacings

04/04/24
9508 15102 CIPP 2024 Water Main Rehabilitation

04/04/24
9506 14595 Warner Park Dog Park Lot Resurfacing

02/08/24
9503 14933 Sycamore Singletrack Trail Improvements 2024

06/27/24
9502 17196 Warner Park Community & Recreation Center Expansion

04/04/24
9501 15045 Lake Street Sanitary Sewer Replacement - 2024

04/04/24
9500 14015A 2024 Rennebohm Park East Tennis Courts

04/25/24
9497 14121A Streets West Facility HVAC and Lighting Upgrade

02/08/24
9495 45300 Semi Permanent Epoxy Pavement Marking

03/21/24
9493 82145D Parking Garage Maintenance

04/23/26
9490 14922 Fordem Avenue - First Street Relief Sanitary Sewer

07/18/24
9489 14920 3400 BLK E Washington Sewer Repl

05/09/24
9487 14923 CIPP UV LINING REHABILITATION OF SEWERS PHASE 1 – 2024

08/29/24
9486 14921 Commercial Avenue Sanitary Sewer Reconstruction

03/07/24
9485 14525 Rennebohm Park Shelter Restroom Renovation

08/05/21
9478 13724 Westview Hills Channel

03/04/21
9446 54250 2021 Tennis and Basketball Court

03/04/21
9440 13363 CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021

06/08/23
9439 12882 Mendota Grassman Greenway


Future Project

9438 12568 Old Sauk Trails Business Park - Phase 1

01/26/23
9437 11066 East Towne Pond


Future Project

9436 11737 Old Sauk Trails Business Park - Ph 2


Future Project

9435 12146 Mendota-Spring Harbor Greenway

08/25/22
9433 12916 Spring Harbor Dredging

10/20/22
9432 11704 Hawks Landing Flood Mitigation North

01/06/22
9430 12960 Sprecher Road Greenway Improvements

02/18/21
9429 13371 Mall/Concourse Maintenance Protective Flooring Replacement

03/05/20
9428 12774 Warner Lagoon Pier and Ice Access

11/07/19
9426 12710 CIPP Rehab of Sanitary and Storm Sewer Mains - 2019

06/20/19
9415 19033 2019 Glacier Hill Park Sun Shelter Installation

04/25/19
9414 17525 2019 Playground Replacements

04/25/19
9412 11842 West Elderberry Sanitary Sewer Interceptor - 2019

05/23/19
9411 12011 McKenna Boulevard Flood Mitigation


Future Project

9410 16122 Overture Center Garage

05/16/19
9404 17390 Reindahl Park Barn Improvements

05/09/19
9403 19021 Park Paving 2019

05/09/19
9400 17451 Fire Station 14 (2018) & Fire Station 14 Training Tower (2019)

05/23/19
9398 17526 2019 Playground Replacements - Group 2

07/25/19
9397 11021 Truck Scales Project

12/21/23
9390 14980 Lower Badger Mill Creek Pond Restoration

01/11/24
9389 14933 Sycamore Singletrack Trail Improvements 2024

11/09/23
9377 11168 University Avenue Reconstruction


Future Project

9374 14917 West Badger Mill Creek - Elver Park Greenway


Future Project

9373 14914 Stormwater Quality Screen Structures

09/21/23
9365 14369 Railroad Arch Culvert Repair at Southwest Path

03/21/24
9362 13810 Ohmeda Drive Assessment District - 2022

11/09/23
9361 14145 State Street Campus Garage Replacement

03/21/24
9359 13937 Country Grove Park Shelter

05/23/24
9358 13346 Bartillon Homeless Shelter

09/07/23
9357 14156 IT Fiber Install 2023

08/10/23
9346 8214556C 2023 Parking Garage Maintenance

02/08/24
9342 14092 Well 15 PFAS Treatment Facility

09/21/23
9336 14413 229 Felland Road Booster Pump Install

08/10/23
9335 14487 CIPP UV Lining Phase 2

11/09/23
9334 14412 B Robin Greenway Restoration

07/13/23
9333 14412 A Robin Greenway Storm and Grading

01/11/24
9329 14203 Fire Station #14 Training Site Phase 1

06/08/23
9327 13930 Penn Park Courts Reconstruction

06/22/23
9326 14334 Door Creek Park Shelter

08/24/23
9322 14530 Fire Station 2 Lighting Retrofit

05/04/23
9320 14245 Fire Station 4 Lighting Retrofit

05/25/23
9319 14643 CIPP Water Main Rehab 2023 - Fish Hatchery Road

05/25/23
9319 14659 CIPP Water Main Rehab 2023 - Lake Mendota Drive

03/13/25
9318 14023 Waste Drop Off Site at Streets Transfer Station

05/25/23
9317 8214556C 2023 Parking Garage Maintenance


Future Project

9314 14121 Streets East Wash Bay Steel Column and Panel Repairs

04/20/23
9313 12728 Madison Senior Center Courtyard

04/20/23
9312 12457 Truax Lift Station Replacement - 2021

04/20/23
9306 13930 Penn Park Courts Reconstruction

11/09/23
9304 14439 Northport Drive & School Road

03/09/23
9299 45300 Semi Permanent Epoxy Pavement Marking

05/04/23
9298 14537 2023 West Parks Playground Replacements

07/06/23
9297 12410 Madison Public Library Lighting (various locations)

12/14/23
9289 10448 Unit Well 19 Treatment System Addition

03/09/23
9286 14486 CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023

03/09/23
9285 14485 CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023

02/09/23
9280 14246 Fire Station 10 Lighting Retrofit

02/23/23
9279 13934 2023 Inclusive Playgrounds

02/23/23
9270 13930 Penn Park Courts Reconstruction

02/09/23
9269 13432 2023 Sport Court Resurfacings

12/22/22
9262 14320 CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021 (Rebid)

03/09/23
9249 12728 Madison Senior Center Courtyard

09/24/26
9246 13860 West Towne Pond Improvements

04/20/23
9245 14334 Door Creek Park Shelter

12/01/22
9244 16122 Overture Center Garage

01/26/23
9243 45300 Semi Permanent Epoxy Pavement Marking

04/06/23
9240 14245 Fire Station 4 Lighting Retrofit

08/15/24
9238 14374 Burr Jones Shoreline Repair

09/07/23
9235 14369 Railroad Arch Culvert Repair at Southwest Path

08/15/24
9234 14368 Schroeder Rd Flood Mitigation


Future Project

9233 14367 Westside Impact Fee District

12/01/22
9230 14246 Fire Station 10 Lighting Retrofit

09/29/22
9228 14027 Replacement of booster pumps and associated piping/appurtenances at Unit Wells 12 & 26

04/06/23
9226 12393 Phase 2 of CCB City Office Remodels, First and Fifth Floors

08/04/22
9210 14296 Mineral Point Landfill 2022 Gas Construction

08/25/22
9209 14320 CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021 (Rebid)

08/25/22
9201 13710 O.B. Sherry Park - 3457/3461/3465 Milwaukee St. Demolition and Site Restoration

08/25/22
9200 13939 Replacement of booster pumps and associated piping/appurtenances at Unit Wells 12 & 26

08/25/22
9200 14027 Replacement of booster pumps and associated piping/appurtenances at Unit Wells 12 & 26


Future Project

9198 14273 Solar PV – Fire Station 01


Future Project

9197 14274 Solar PV – Fire Station 08


Future Project

9196 14275 Solar PV – Streets South Point Warm Storage

08/25/22
9195 13716 Bridge Repairs 2022/2023-Painting Alicia Ashman Ped Bridge

06/09/22
9188 13935 2022 Warner Park Inclusive Playground

07/07/22
9179 14015 RENNEBOHM PARK EAST TENNIS COURTS 2025

04/28/22
9178 13836B Solar PV – Fire Station 02

08/04/22
9176 16122 Overture Center Garage

08/15/24
9174 10525 McPike Park (formerly Central Park)

05/26/22
9173 14093 2022 CIPP Water Main Rehab Lake Mendota Dr

04/14/22
9172 13934 2023 Inclusive Playgrounds

05/12/22
9169 14073 Median Conversion - Concrete 2022

04/28/22
9168 8214556B 2022 Parking Garage Maintenance

09/29/22
9162 13836C Solar PV – Water Utility Paterson Vehicle Storage

04/07/22
9161 13836B Solar PV – Fire Station 02

08/04/22
9160 14270 Solar PV - Streets Waste Transfer Station

03/24/22
9159 13369 Senior Center Lighting Replacement

04/14/22
9151 13931 Cannonball Single Track Trail Improvements 2022


Future Project

9149 13862 Atwood Avenue Flood Mitigation


Future Project

9147 13879 Regent and Kenosha Culvert Replacement

03/03/22
9146 13836 Green Power 2022-Solar Installations

03/24/22
9138 13934 2023 Inclusive Playgrounds

01/20/22
9136 10950 Metro Transit Hanson Rd Satellite Bus Facility Remodel


Future Project

9135 11078 Fairchild Building HVAC Upgrade and Structural Repair

01/20/22
9131 16126 State Street Capitol Garage Relighting and Electrical Controls and Upgrade

02/03/22
9127 13357 Tenney Park East Johnson St. Pedestrian Bridge Wing Walls

04/28/22
9125 14099 MPD East Fence

02/03/22
9118 13895 2022 Sport Court Resurfacings


Future Project

9115 11596 NE NEIGHBORHOOD SANITARY IMPACT FEE

10/05/23
9108 13872 Parkside Drive Sanitary Sewer Replacement

08/04/22
9107 13871 CIPP Sewer Lining 2022


Future Project

9106 13870 Capitol City Trail Bike Roundabout


Future Project

9105 13867 Pumpkin Hollow Sanitary Sewer Impact Fee District


Future Project

9104 11942 Arbor Hill Greenway Screen Structure

05/12/22
9103 13800 Worthington Avenue Sanitary Replacement

05/12/22
9102 11850 1622 Fordem Avenue Sanitary Sewer Replacement

12/16/21
9087 10950 Metro Transit Hanson Rd Satellite Bus Facility Remodel

10/26/23
9086 10950 Metro Transit Hanson Rd Satellite Bus Facility Remodel

10/07/21
9079 12410 F Madison Public Library Lighting - Sequoya

09/23/21
9063 11672 Thurber Lift Station Replacement

08/05/21
9057 13566 CIPP 2021 - E. Johnson St

08/05/21
9056 13565 CIPP 2021 - Pontiac Trl, Nokomis Ct, Rosewood Cir

08/05/21
9055 13474 Summit Maintenance Facility Improvements 2021

09/09/21
9050 12856 Olin Park Facility Improvements

06/24/21
9042 13132 Madison Fire Station 05 Wall Removal & Improvements

06/03/21
9039 13453 Park Paving 2021

07/08/21
9035 13491 Greentree Hills Landfill West Header Replacement

06/03/21
9026 13451 2021 Playground Improvements

03/18/21
9014 13265 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2021

01/21/21
9007 12410 Madison Public Library Lighting (various locations)

01/21/21
9006 13217 Well 18 Treatment

05/20/21
9004 13279 Fire Station 10 - Retaining Wall

12/17/20
8997 13217 Well 18 Treatment

12/17/20
8996 13307 Heim Building HVAC Replacement

04/15/21
8992 13267 Sidewalk, Curb&Gutter, Citywide Installation and Repair 2021

03/11/21
8991 13265 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2021

02/18/21
8990 13253 Resurfacing 2021

02/18/21
8989 13253 Resurfacing 2021

02/25/21
8988 13253 Resurfacing 2021

03/11/21
8987 13221 Sidewalk Program 2021, Ald. District 14

03/18/21
8986 13220 Sidewalk Program 2021, Ald. District 13

11/19/20
8985 12675 Street End Repairs - (FEMA 81336)

02/18/21
8984 11229 Metro Transit E. Wash Upgrades

05/27/21
8981 11230 Metro Transit Phase 3

12/17/20
8961 12410 Madison Public Library Lighting (various locations)

03/04/21
8960 12410 B Madison Public Library Lighting - Alicia Ashman

06/25/20
8930 12371 Traffic Median Revegetation Trial Project

07/23/20
8922 10525 McPike Park (formerly Central Park)

06/25/20
8920 12999 Allis/Spaanem/Shaffer Water Main

09/24/20
8916 12890 Gates of Heaven Exterior Restoration

05/28/20
8913 12371 Traffic Median Revegetation Trial Project

05/07/20
8907 12315 Orchard Street Sanitary Sewer Repair

07/02/20
8904 12679 2020 Playground Improvements - Group 3

04/30/20
8901 12687 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2020

11/05/20
8899 12851 2020 Galaxy Park Sun Shelter Installation

06/25/20
8898 12661 UW 26 Booster Pump Upgrade

05/21/20
8893 17473 Gates of Heaven

06/25/20
8891 11021 Truck Scales Project

04/23/20
8885 8214556X 2020 Parking Garage Maintenance

04/09/20
8882 12881 Olbrich Roof Replacements

08/06/20
8879 12857 Tenney Park Pavilion Acoustic Plaster Ceiling

06/10/21
8878 11672 Thurber Lift Station Replacement

04/09/20
8877 12315 Orchard Street Sanitary Sewer Repair

07/13/23
8876 12750 Wexford Pond Dredging

03/09/23
8875 11063 Lower Badger Mill Creek Pond

09/08/22
8873 12457 Truax Lift Station Replacement - 2021

01/28/27
8872 11730 SAUK CREEK GREENWAY

08/20/20
8871 10956 MPD Central Property/GR 10 Carpet Replacement

09/24/20
8870 12755 CIPP Rehab 2020

09/23/21
8868 12456 Harper Lift Station Replacement


Future Project

8866 12749 Yahara River Parkway Screen Structure

05/28/20
8864 12989 E. Gorham Street Resurfacing: Utilities


Future Project

8863 11596 NE NEIGHBORHOOD SANITARY IMPACT FEE

09/03/20
8861 13195 GLENWOOD CHILDRENS PARK STORM 2020

04/07/22
8860 12869 FEMA Shoreline Repairs - 2022


Future Project

8859 12154 Spring Harbor Outfall Repair

05/21/20
8858 12327 Felland Road Water Main Extension Phase 1

04/09/20
8853 12827 Park Paving 2020

07/09/20
8850 11971 WARNER PARK BEACH SHELTER

04/23/20
8849 12676 2020 Playgrounds - Group 1

03/19/26
8845 14490 Campus Drive at Bacock Drive Railroad Crossing Improvements

06/25/26
8844 15752 2026 Safe Streets


Future Project

8842 15723 West Washington Path Crossing

11/20/25
8841 15905 114 E Wilson Site Restoration

05/07/26
8838 15929 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor

05/07/26
8837 15929 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor

05/07/26
8836 15929 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor

05/07/26
8835 15929 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor

05/21/26
8834 15930 2026 Resurfacing


Future Project

8833 15930 2026 Resurfacing

05/07/26
8832 15930 2026 Resurfacing

05/21/26
8830 15791 Bridge Repairs - 2026

06/11/26
8829 15928 Citywide SW

04/23/26
8828 15927 Sawcutting Dist 2 & 6

04/23/26
8827 15927 Sawcutting Dist 2 & 6

04/23/26
8826 15926 Sidewalk Dist 6

04/23/26
8825 15925 Sidewalk Dist 2

04/23/26
8825 15926 Sidewalk Dist 6

10/08/26
8824 15675 Bikeways 2026

09/10/26
8823 15825 Parman Ter Constr.

10/08/26
8822 15821 Dondee Rd


Future Project

8821 15824 Norman Way, Wood Cir Recon


Future Project

8820 15121 Euclid Ave, Birch Ave Recon

11/05/26
8819 15823 Milwaukee St Recon


Future Project

8818 15854 Capital Ave Recon

11/05/26
8817 15119 Birge Ter Recon

07/30/26
8816 11191 Sherman Ave & McGuire St Recon

04/30/26
8815 15827 Virgina Ter, Norwood Pl Construction

04/23/26
8813 15820 Elmside Blvd, Sommers Ave, & Center Ave Recon

03/13/25
8811 15234 Bridge Repair 2025

03/19/26
8810 15516 Midvale Blvd Resurf

02/12/26
8809 15486 South Charter St Alley Recon


Future Project

8808 15416 2025 Resurfacing

05/08/25
8807 15416 2025 Resurfacing

08/07/25
8806 15123 Buffalo Trail, Barron Court, Green Lake Pass Resurfacing w/Utilities

09/18/25
8801 14782 Troy Drive/Green Ave Resurfacing

03/20/25
8800 15200 2025 Safe Streets

06/25/26
8799 15417 Sugar Maple Ln Recon

05/08/25
8798 15416 2025 Resurfacing

03/20/25
8797 15415 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor

03/20/25
8796 15415 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor

03/27/25
8795 15415 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor

03/27/25
8794 15415 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor

05/08/25
8792 15379 Citywide SW

02/27/25
8791 15378 Sawcutting Dist 10 & 20

02/13/25
8790 15378 Sawcutting Dist 10 & 20

02/13/25
8789 15377 Sidewalk Dist 20

02/27/25
8788 15376 Sidewalk Dist 10

11/05/26
8787 14987 W Mifflin St Plaza Recon

03/19/26
8786 15120 MacArthur Rd, MacArthur Ct, Larson Ct, Sycamore Ave Recon

07/03/25
8785 15219 Meyer Ave Recon

06/25/25
8784 15125 E Main St, Hancock St Resurf

04/17/25
8783 11822 Shawnee Pass Recon, Nakoma Rd Sidewalk

06/11/26
8782 14481 Davidson St, Park Ct, Maher Ave, Gary St Recon

03/27/25
8781 11825 Evergreen Ave, Ohio Ave, Sommers Ave Recon

09/26/24
8770 10169 West Towne Path Ph 2a

01/30/25
8769 15104 North Shore Dr Path

08/29/24
8767 14334 Door Creek Park Shelter

02/13/25
8766 15113 Franklin St Resurfacing w/Utilities

07/03/25
8763 14143 Badger Rusk Shared-Use Path

11/30/23
8762 13924 Hammersley Road Resurfacing w/Utilities Phase 2


Future Project

8761 11168 University Avenue Reconstruction

11/21/24
8759 14780 Starker Ave Resurfacing w/Utilities

04/04/24
8758 14817 Sidewalk, Curb & Gutter, Citywide Installation & Repair 2024

03/27/25
8757 14890 Bartillon Path

02/22/24
8756 14818 2024 Sidewalk Sawcutting

02/08/24
8755 14818 2024 Sidewalk Sawcutting

02/08/24
8754 14816 Sidewalk Ordered 2024 Ald Dist 19

03/21/24
8753 14815 Sidewalk Ordered 2024 Ald Dist 11

04/04/24
8752 14814 Pavement Crack Repair & Chip Seal 2024

04/04/24
8751 14814 Pavement Crack Repair & Chip Seal 2024

04/04/24
8750 14814 Pavement Crack Repair & Chip Seal 2024


Future Project

8749 14814 Pavement Crack Repair & Chip Seal 2024


Future Project

8748 14813 Bridge Repair 2024

05/21/26
8747 14781 Pflaum Rd Resurfacing w/Utilities

03/28/24
8746 14389 W. Washington Ave & S. Henry Resurfacing w/utilities

05/23/24
8745 14764 Stevens St Resurfacing w/ Utilities

06/27/24
8744 14763 Atticus Way

02/22/24
8743 14083 Lake Mendota Dr and Norman Way Reconstruction

07/18/24
8742 14076 Rutledge Street Reconstruction


Future Project

8741 14812 Evergreen Ave, Ohio Ave, Center Ave, & Willard Ave Reconstruction

05/09/24
8740 14762 Hermina St/Union St Reconstruction

07/24/25
8739 14761 Tancho Dr Bike Path

07/24/25
8739 15427 Northeast Regional Pond Repair

03/07/24
8738 14896 2024 Resurfacing

03/07/24
8737 14896 2024 Resurfacing

03/07/24
8736 14896 2024 Resurfacing

04/04/24
8735 11543 E. Wilson/E. Doty Street Reconstruction

12/18/25
8733 14636 Hawthorne Court Reconstruction

12/18/25
8733 15938 North Lake Street/West Dayton Street Resurfacing

06/08/23
8732 14346 Pavement Crack Repair and Chip Seal 2023

06/08/23
8731 14346 Pavement Crack Repair and Chip Seal 2023

06/22/23
8728 14156 IT Fiber Install 2023

03/09/23
8727 13716 Bridge Repairs 2022/2023-Painting Alicia Ashman Ped Bridge

04/20/23
8721 13015 W. Main Street Bike Boulevard Improvements

12/01/22
8720 12434 Senior Center First Floor Folding Partition Installation


Future Project

8719 14388 New Sidewalk/Path Installation 2023

02/08/24
8717 12777B Mineral Point Road Widen Sidewalk (for East-West Bus Rapid Transit)

12/15/22
8716 13925 East-West Bus Rapid Transit Improvements

02/23/23
8715 14082 Lake Mendota Drive Reconstruction

03/09/23
8713 14337 Sidewalk sawcutting 2023

03/28/24
8712 14078 Lowell Street Reconstruction

11/30/23
8711 14081 Harvey St & Schmitt Pl Reconstruction

09/21/23
8710 14080 S. Owen Drive Reconstruction

05/23/24
8709 14079 Doncaster Dr, Beverly Rd, Danbury St Reconstruction

06/25/26
8708 13664 Hermina St: Ped Bike Bridge over Starkweather Creek

06/08/23
8707 11860 a John Nolen Bridge Repairs - 2023

02/23/23
8706 14349 Sidewalk Ordered 2023 AD 18

03/09/23
8705 14348 Sidewalk Ordered 2023 AD 12

02/23/23
8704 14347 Resurfacing 2023

02/23/23
8703 14347 Resurfacing 2023

02/23/23
8702 14347 Resurfacing 2023

03/09/23
8701 14346 Pavement Crack Repair and Chip Seal 2023

03/09/23
8700 14346 Pavement Crack Repair and Chip Seal 2023

03/09/23
8699 14346 Pavement Crack Repair and Chip Seal 2023

03/09/23
8698 14346 Pavement Crack Repair and Chip Seal 2023

02/23/23
8697 14337 Sidewalk sawcutting 2023

02/08/24
8696 14336 Bikeways 2023

04/11/24
8695 14199 Safe Streets Madison 2024

12/01/22
8694 14216 S. Pinckney Street Resurfacing w/Storm

12/14/23
8693 14215 Sheboygan Ave & N. Segoe Rd Resurfacing w/Utilities

01/26/23
8692 14335 Felland Road Reconstruction

09/15/22
8691 12777A East-West Bus Rapid Transit Early Works Improvements

05/12/22
8690 13716 Bridge Repairs 2022/2023-Painting Alicia Ashman Ped Bridge

04/07/22
8689 13719 Pavement Crack Repair and Chip Seal 2022

04/07/22
8688 13719 Pavement Crack Repair and Chip Seal 2022

04/07/22
8687 13719 Pavement Crack Repair and Chip Seal 2022

07/13/23
8659 14075 Willard/Sommers/Center/Hudson/Miller Reconstruction

08/04/22
8658 13715 Bikeways 2022(2023 construction)

07/07/22
8657 13923 Safe Streets Madison 2022

07/07/22
8655 13480 W. Washington Ave & Henry St Intersection Improvement

08/25/22
8654 44001 West Badger Rd. Salt Barn

10/20/22
8653 13617 Olin Avenue Waste Transfer Station Concrete floor replacement


Future Project

8651 13923 Safe Streets Madison 2022

03/17/22
8650 13175 Old Middleton Rd & Craig Ave Resurfacing w/Utilties


Future Project

8648 14023 Waste Drop Off Site at Streets Transfer Station

06/09/22
8647 13480 W. Washington Ave & Henry St Intersection Improvement

07/07/22
8644 13715 Bikeways 2022(2023 construction)

06/23/22
8643 13923 Safe Streets Madison 2022

04/06/23
8642 13014 West Towne Path - Phase 3

01/26/23
8641 13169 Braxton Pl Resurfacing & La Mariposa Lane(new street)


Future Project

8640 11959 Old Middleton Road Underpass of WSOR Railroad

04/07/22
8636 13719 Pavement Crack Repair and Chip Seal 2022

06/13/24
8635 13812 Knutson Drive Reconstruction

04/07/22
8634 13721 Sidewalk, Curb&Gutter, Citywide Installation and Repair 2022

03/03/22
8633 13717 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2022

03/03/22
8632 13720 Sidewalk Program 2022, Ald. District 5

07/11/24
8626 13713 Olin-Turville Ct and E. Lakeside St Resurfacing w/Utilities

07/11/24
8626 15269 OLIN-TURVILLE RECONSTRUCT

07/07/22
8625 13709 Lake Mendota Dr & Capital Ave Reconstruction

05/12/22
8624 13708 Russell Street Reconstruction

06/09/22
8623 13707 Tokay Boulevard Resurfacing w/Utilities

03/24/22
8622 13706 S. Owen, Caromar, Keating Resurfacing w/Utilities

09/08/22
8621 13705 Hammersley Road Resurfacing w/Utilities Phase 1


Future Project

8620 13704 Anderson Street Resurfacing w/Utilities

03/03/22
8619 13703 Resurfacing 2022

03/03/22
8618 13703 Resurfacing 2022

03/03/22
8617 13703 Resurfacing 2022

02/17/22
8616 12907 St. Paul, Ohio, Talmadge,Jackson and LaFollette Reconstruction

08/05/21
8615 13418 Aberg Avenue & NB Packers Avenue Ramp traffic signal

07/08/21
8614 13264 Local Road Traffic Calming & Arterial Ped Enhancements 2021

05/20/21
8613 11021 A Sycamore Park Parking Lot Repavement

09/09/21
8609 13342 Madison Police Training Center Office Roof Replacement

12/16/21
8606 12444 South Point Rd. Truck Scale and Fuel Point

06/09/22
8605 44001 West Badger Rd. Salt Barn

06/03/21
8604 12410 F Madison Public Library Lighting - Sequoya


Future Project

8603 12410 E Madison Public Library Lighting - Goodman South Madison


Future Project

8602 13370 Streets West Badger Lighting

02/17/22
8601 13369 Senior Center Lighting Replacement

05/20/21
8600 12410 D Madison Public Library Lighting - Meadowridge

04/08/21
8599 12410 C Madison Public Library Lighting - Lakeview

05/12/22
8598 17040 Fire Station 06 Remodel

09/14/23
8595 10069 Madison Public Market

02/17/22
8592 13258 Engineering Operations Facility - Canopy Replacment/Expansion

04/08/21
8591 8214556A 2021 Parking Garage Maintenance


Future Project

8590 12437 Waste Transfer Paving Extension


Future Project

8589 13160 Library Service + Support - Siding Replacement


Future Project

8588 13345 Overnight Men's Shelter

07/13/23
8587 13343 Tenney Park Beach Shelter

07/14/22
8586 12789 Reindahl Restroom Remodel

06/03/21
8585 13282 Dearholt Rd Resurfacing w/Utilities

05/27/21
8584 13324 N. Park Street Paver Repair & State Street Sidewalk Joint Repair

02/09/23
8583 13011 Halo Lane and Twilight Trail Reconstruction

04/08/21
8582 13266 Pavement Crack Repair and Chip Seal 2021

04/08/21
8581 13266 Pavement Crack Repair and Chip Seal 2021

04/08/21
8580 13266 Pavement Crack Repair and Chip Seal 2021

04/08/21
8579 13266 Pavement Crack Repair and Chip Seal 2021

02/18/21
8578 11132 Park St Pavement Joint Repair (2019 inbound:2021 outbound)

06/24/21
8577 13271 Forster Drive Resurfacing w/Utilities

04/29/21
8576 13180 N. Brooks St, Fahrenbrook Ct, College Ct Resurfacing w/Utilites

05/06/21
8575 13141 Bridge Repairs 2021

05/20/21
8574 13173 W. Washington Avenue Resurfacing s/Utilities

10/21/21
8573 13179 Kronke Dr, Tanager Trl & Lanett Cir

02/25/21
8572 10160 Garver Path

02/25/21
8572 12952 Starkweather Drive Reconstruction

06/24/21
8570 13264 Local Road Traffic Calming & Arterial Ped Enhancements 2021

06/10/21
8569 11189 Helena St/Russell St/Jenifer St Reconstruction

03/03/22
8568 13175 Old Middleton Rd & Craig Ave Resurfacing w/Utilties

06/24/21
8567 13177 Melvin Ct & Ridgeway Ave Resurfacing w/Utilities

05/11/23
8566 13170 Davies St & Dempsey Rd Reconstruction

06/10/21
8565 13176 Hooker Ave, Sheridan Dr, Steensland Dr Resurfacing w/Utilities

05/27/21
8564 13270 Felland Rd & Tranquility Trl Roundabout

06/24/21
8563 13097 Bikeways 2021

04/23/26
8562 13171 Pontiac Trl, Boston Ct, Nokomis Ct, Rosewood Ct Recon

04/22/21
8561 12195 Hillcrest Dr, Alden Dr, Standish Ct Reconstruction

06/25/20
8560 85100X West Transfer Point Concrete Joint Repair 2020

04/09/20
8558 12690 Pavement Crack Repair and Chip Seal 2020

04/09/20
8557 12687 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2020

04/23/20
8555 12487 Prairie Road/Raymond Road Intersection Improvement

05/21/20
8554 12950 Highland Avenue Sidewalk and Lighting Improvements

02/20/20
8543 11446 RIMROCK INTRCPTR-INDUSTRIAL DR EXT

02/06/20
8542 11399 Spring Harbor Greenway at Masthead (Nautilus Pond Reconstruction)

05/21/20
8538 12678 2020 Playgrounds - Group 2

05/21/20
8538 12681 2020 Playgrounds - Group 2

04/09/20
8536 12746 McKenna Blvd Flood Mitigation - Phase 2 (Greentree Pond to N Struck St)

02/06/20
8535 11229 Metro Transit E. Wash Upgrades

02/20/20
8534 12780 2020 Tennis and Basketball Court Resurfacings

12/19/19
8532 12698 UV CIPP Rehab of Sanitary Sewers - 2019

01/16/20
8526 51004 Reynolds Park - Water Utility Rooftop Lighting

09/09/21
8525 12154 Spring Harbor Outfall Repair

12/05/19
8521 12675 Street End Repairs - (FEMA 81336)

02/20/20
8516 12695 Livingston Street Reconstruction

06/04/20
8515 12688 Local Road Traffic Calming & Arterial Ped Enhancements 2020

05/21/20
8514 12717 Julia Street & Julia Court Resurfacing

05/28/20
8513 12693 Rethke Avenue Reconstruction

04/28/22
8512 14056 New Sidewalk Installation 2022

04/09/20
8511 12686 Bridge Repairs 2020: Sycamore Ave over Starkweather Creek

03/19/20
8510 12690 Pavement Crack Repair and Chip Seal 2020

03/19/20
8509 12690 Pavement Crack Repair and Chip Seal 2020

03/19/20
8508 12690 Pavement Crack Repair and Chip Seal 2020

03/19/20
8507 12690 Pavement Crack Repair and Chip Seal 2020

04/30/20
8506 10225 Anderson Street Resurfacing

01/20/22
8505 11202 Cedar Street Reconstruction

01/20/22
8505 13062 Cedar Street (relocate Appleton Rd)

01/21/21
8504 11866 Cedar Street (new street)

01/21/21
8504 12956 South Street, W. Wingra Drive & High Street(recon) Resurfacing w/Utilities

12/03/20
8503 11190 Dunning St, Jackson St & LaFollette Ave Reconstruction

03/19/20
8502 12564 Packers Avenue Resurfacing w/Utilities

03/05/20
8501 11188 Gregory/Cross/Copeland/Western Reconstruction

02/20/20
8500 11164 Martin Luther King Jr. Blvd Sidewalk Replacement

03/05/20
8499 12365 Bikeways 2020

12/03/20
8498 12694 Rockstream Drive (new street)

04/09/20
8497 12692 Sidewalk, Curb&Gutter, Citywide Installation and Repair 2020

03/19/20
8495 12687 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2020

03/19/20
8493 12612 Sidewalk Program 2020, Ald. District 4

03/19/20
8493 12613 Sidewalk Program 2020, Ald. District 8

02/20/20
8492 12691 Resurfacing 2020

02/20/20
8491 12691 Resurfacing 2020

02/20/20
8490 12691 Resurfacing 2020

12/05/19
8484 45300 Semi Permanent Epoxy Pavement Marking

11/07/19
8483 12698 UV CIPP Rehab of Sanitary Sewers - 2019

11/19/20
8480 19050 Tenney Park Lagoon Biostabilization

11/07/19
8479 17390 Reindahl Park Barn Improvements


Future Project

8473 12154 Spring Harbor Outfall Repair

08/22/19
8468 11845 Storm Structural Repairs 2019

09/05/19
8466 12481 Southwest Bikepath Culvert Replacement at Waite Circle - 2019

08/22/19
8465 11021 Truck Scales Project

08/08/19
8461 11989 CIPP Rehab of Sanitary and Storm Sewers - 2019

08/08/19
8460 10985 Sauk Creek Greenway - Tree Lane to High Point

09/05/19
8459 10955 MPD Central Painting & Carpet Replacment

07/11/19
8456 19391 Summit West Maintenance Facility Improvements 2019

07/25/19
8455 19021 Park Paving 2019

07/11/19
8453 19033 2019 Glacier Hill Park Sun Shelter Installation

09/19/19
8441 17365 North Star Dog Park

09/19/19
8430 11471 Judge Doyle Garage(20017) Government East Ramp Demolition(2019)

06/06/19
8427 17451 Fire Station 14 (2018) & Fire Station 14 Training Tower (2019)

06/06/19
8425 19021 Park Paving 2019

07/25/19
8423 17421 2019 Northland Manor Tennis Courts

05/23/19
8422 11845 Storm Structural Repairs 2019

06/20/19
8421 11857 Hawk's Landing Flood Mitigation - Southwest

06/06/19
8420 11774 GLENWOOD CHILDRENS PARK STORM IMPRV

04/11/19
8396 8214556 2019 Parking Garage Maintenance

04/04/19
8391 17525 2019 Playground Replacements

02/28/19
8390 12264 CIPP Wet Lining Rehab of Sanitary Sewers - 2019

02/21/19
8386 19014 Forest Hill Cemtery Improvements 2019

03/21/19
8381 11227

02/07/19
8379 11808 Warning Sirens - 2019

12/20/18
8374 11446 RIMROCK INTRCPTR-INDUSTRIAL DR EXT

03/07/19
8370 11876 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2019

02/21/19
8369 11876 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2019

04/04/19
8368 11881 Sidewalk, Curb & Gutter, Citywide Installation and Repair 2019

02/21/19
8367 11880 Sidewalk Program 2019, Ald. District 9

03/07/19
8366 11879 Sidewalk Program 2019, Ald. District 1 & 7

10/24/19
8365 11166 Capitol Square Café Areas

06/20/19
8359 17395 Burr Jones Park - Site Improvements

07/02/20
8349 11739 E. Dayton Street Resurfacing w/Utilities

01/31/19
8348 19006 2019 Door Creek Park Tennis Courts Phase II

06/06/19
8328 11330 Olbrich Park Improvements

12/06/18
8327 11808 Warning Sirens - 2019

02/07/19
8325 11399 Spring Harbor Greenway at Masthead (Nautilus Pond Reconstruction)

02/28/19
8320 11856 Resurfacing 2019

02/28/19
8319 11856 Resurfacing 2019

02/28/19
8318 11856 Resurfacing 2019

04/25/24
8317 13893 Blue Harvest Lane, Feather Edge Drive, & Soaring Sky Run Assessment District – 2023

04/23/20
8316 10902 Vilas Ave and Campbell St Reconstruction

06/20/19
8315 11877 Local Road Traffic Calming & Arterial Ped Enhancements 2019

05/09/19
8314 11875 Bridge Repairs 2019

03/26/20
8313 11958 City View Drive (new street)

06/06/19
8312 11871 South Point Road Reconstruction

04/11/19
8311 11878 Pavement Crack Repair and Chip Seal 2019

04/11/19
8310 11878 Pavement Crack Repair and Chip Seal 2019

04/11/19
8309 11878 Pavement Crack Repair and Chip Seal 2019

04/11/19
8308 11878 Pavement Crack Repair and Chip Seal 2019

04/25/19
8307 11132 Park St Pavement Joint Repair (2019 inbound:2021 outbound)

03/19/20
8306 11744 Toepfer, Holly, Euclid and St. Clair Resurfacing w/Utilities

06/06/19
8305 11890 Davidson/Drexel/Lake Edge

03/26/20
8304 11889 E. Washington Avenue Permanent Pavement Marking Replacement-2020


Future Project

8303 11873 Belin Street and Park Way Reconstruction

05/23/19
8302 10900 Oak Street Reconstruction

02/28/19
8301 11963 Reetz Road & Altem Cir Storm w/Resurfacing

04/20/23
8300 11986 W. Wilson St, S. Broom St. & S. Henry St Resurfacing w/Utilities

06/20/19
8299 11987 N. Bassett Street Resurfacing w/Utilities

03/07/19
8298 11872 Groveland Terrace Reconstruction

02/07/19
8297 11452 Haywood Drive Reconstruction

02/07/19
8296 11944 E. Wilson, Williamson and S. Blount Street Reconstruction

10/24/19
8295 11182 Elizabeth St and N. Ingersoll St Reconstruction

03/05/20
8294 11865 Dairy Drive (new street)

06/20/19
8293 11985 New Sidewalk Installation 2019

01/10/19
8292 11753 Hammersley Avenue Reconstruction

10/11/18
8291 11982 Fainchild Building - Roof Replacement

01/24/19
8290 13115 Judge Doyle Podium

09/27/18
8289 11982 Fainchild Building - Roof Replacement

02/21/19
8288 10543 Parks Improvements

03/05/20
8287 12881 Olbrich Roof Replacements

04/25/19
8277 53W0896 Buckeye Road Reconstruction

04/25/19
8276 11761 DARBO DR CANOE LAUNCH 2019

09/20/18
8275 17133 Olbrich Park Maintenance Shed

09/20/18
8273 10524 McPike Park - Skatepark Seating Area

09/20/18
8268 10314 Jacobson-Furey Pond

10/25/18
8267 17384 Brittingham Dog Park Improvements

09/20/18
8258 11774 GLENWOOD CHILDRENS PARK STORM IMPRV

09/06/18
8255 11827 Sanitary Sewer Access Structure Lining - 2018

08/23/18
8250 10426 Sycamore Sanitary Sewer Interceptor Maintenance Access - Phase 1

09/20/18
8245 10954 Madison Police North District Flooring Replacement

10/25/18
8244 80007 Monona Terrace Airwall Replacement

09/09/21
8243 13278 Fire Station 10 - Roof Replacement

08/23/18
8240 10287 Demolition - Unit Well 3, 212 N First St

02/28/19
8238 11227

02/28/19
8238 11228 Metro 1101 Phase 1 Wash Bay

07/12/18
8232 11761 DARBO DR CANOE LAUNCH 2019

06/28/18
8229 11864 E. Washington Avenue Permanent Pavement Marking Replacement-2018

06/28/18
8228 17366 2018 Elver Park Inclusive Playground

06/28/18
8227 11867 CIPP Rehab of Sanitary Sewers - 2018

08/02/18
8225 17133 Olbrich Park Maintenance Shed

08/02/18
8224 10524 McPike Park - Skatepark Seating Area

08/02/18
8222 17158 Breese Stevens Field-Concession and Restroom Building

07/12/18
8221 20166 Monona Terrace

08/09/18
8220 17381

07/12/18
8216 45865 American Parkway-American Family Drive Traffic Signal

07/19/18
8213 10066 Neighborhood Centers

06/07/18
8212 11864 E. Washington Avenue Permanent Pavement Marking Replacement-2018

05/24/18
8194 17398 2018 Tennis and Basketball Court Resurfacings

05/24/18
8191 11743 Blackhawk/Heather Crest/Bruce Ct Resurfacing w/Utilities

05/03/18
8190 821455 2018 Parking Garage Maintenance

06/07/18
8186 10445 Old Sauk Road Water Pipeline (2018)

06/28/18
8184 11767 Westview Hills Sewer and Water Assessment District 2018

06/28/18
8182 17047 Public Health Office Remodel

08/02/18
8177 11330 Olbrich Park Improvements

04/12/18
8174 17304 2018 Parks Division Fencing and Backstops

05/24/18
8172 17370 2018 Park Playground Improvements - Group 2

05/24/18
8171 17158 Breese Stevens Field-Concession and Restroom Building

04/12/18
8164 17495 Park Paving 2018

07/12/18
8162 17193 Olbrich Botanical Expansion Ph 1

06/07/18
8161 11897 CIPP Rehabilitation of Water Mains - 2018

05/03/18
8160 17473 Gates of Heaven

04/12/18
8158 17502 Meadowood Park Sun Shelter Installation

04/05/18
8156 16124 2018 State Street Campus-Frances Parking Garage Electrical Modifications and Upgrade

03/15/18
8155 17398 2018 Tennis and Basketball Court Resurfacings

03/15/18
8154 17376 2018 Playground Replacements - Group 1

04/05/18
8153 821455 2018 Parking Garage Maintenance

02/22/18
8152 11653 Summit Maintenance Facility - Building Improvements

05/24/18
8151 17366 2018 Elver Park Inclusive Playground

01/25/18
8144 11562 WINGRA PARK SHORELINE

04/04/19
8143 12594 Madison Water Utility Olin Ave Vehicle Storage Roof Replacement

03/15/18
8128 45852 Maple Terrace/ University Ave Traffic Signal

06/28/18
8127 11754 Bikeways 2018

05/24/18
8126 11587 Local Road Traffic Calming & Arterial Ped Enhancements 2018

06/28/18
8125 11750 2018-New Sidewalk Installation

12/20/18
8124 11746 Darwin Rd Resurfacing w/Utilities

05/03/18
8123 11650 Glenview Dr and Joylynne Dr Reconstruction

05/24/18
8122 11181 Prospect(N) Avenue Reconstruction

03/05/20
8121 11677 Alleys: 1800&1900 Adams&Jefferson: 1800 Adams&Vilas: 1200&1300 Chandler&Vilas

05/24/18
8120 11783 Bridge Repairs 2018

02/28/19
8119 11185 S. Bryan/James/Thorp Reconstruction

02/28/19
8119 11749 STARKWEATHER SHORE REPAIR - DALEY DRIVE

04/19/18
8118 53W0752 W. Washington Avenue Pavement Replacement

04/12/18
8116 10901 Pine Street Reconstruction

04/12/18
8116 11180 Gilson Street Reconstruction

05/03/18
8114 11722 Frey St and Sawyer Ter Resurfacing w/Utilities

04/05/18
8111 11654 Utilities with Resurfacing 2018

03/21/19
8110 11676 Koster Street and Rusk Avenue

05/03/18
8109 11655 Davidson/Hegg/Major/Drexal/Lake Edge Reconstruction

03/22/18
8108 11745 Schenk St and Richard St Resurfacing w/Utilities

03/15/18
8107 11183 Emerson Street and Lowell Street Reconstruction

09/20/18
8106 11186 Winnebago St and Linden Ave Reconstruction

04/05/18
8105 11743 Blackhawk/Heather Crest/Bruce Ct Resurfacing w/Utilities

11/01/18
8104 11742 Shepard/Chamberlain/Van Hise/Mason Resurfacing w/Utilities

03/08/18
8103 11599 S. Livingston Street Reconstruction

02/08/18
8101 11294 Wingra Creek Pedestrian Bridge Replacement

02/22/18
8100 11674 Resurfacing 2018

02/22/18
8099 11674 Resurfacing 2018

02/22/18
8098 11674 Resurfacing 2018

06/28/18
8097 10185 Waste Oil Collection Sites

04/12/18
8095 11784 Pavement Crack Repair and Chip Seal 2018

04/12/18
8094 11784 Pavement Crack Repair and Chip Seal 2018

04/12/18
8093 11784 Pavement Crack Repair and Chip Seal 2018

04/12/18
8092 11784 Pavement Crack Repair and Chip Seal 2018

01/25/18
8088 10011 Monona Terrace Olin Terrace Rehabilitation

12/15/17
8085 17186 Olin Turville Park Boat Launch Improvements

04/05/18
8082 10452 Unit Well 12 Upgrade

03/15/18
8077 11772 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2018

04/05/18
8076 11772 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2018

04/12/18
8075 11771 Sidewalk, Curb & Gutter, Citywide Installation and Repair 2018

03/15/18
8074 11770 Sidewalk Program 2018, Ald. District 16

04/05/18
8073 11769 Sidewalk Program 2018, Ald. District 3

01/25/18
8072 11578 Fire Station 10 Bathroom Remodel

10/20/17
8065 53W1464 Madison Municipal Building (MMB)

12/15/17
8064 11226 Madison Metro Bus Garage- Roof Replacement

11/03/17
8063 17169 Garver Feed Mill Material Hauling

11/17/17
8062 17185 Vilas Park - Lagoon Bridge Replacements

11/03/17
8061 11591 Fire Station 10 Storefront Replacement

01/04/18
8058 11675 Westmorland Blvd Utilities w/Resurfacing

10/06/17
8053 10066 Neighborhood Centers

09/22/17
8047 53W1464 Madison Municipal Building (MMB)

09/08/17
8041 11728 CIPP Rehab of Large Diameter Storm Sewer

08/18/17
8035 11667 PARK EDGE DRIVE FLOOD MITIGATION

08/25/17
8033 11591 Fire Station 10 Storefront Replacement

08/18/17
8032 53W1787 OLIN TRANSFER STATION STORMWATER IMPROVEMENT

08/11/17
8030 20166 Monona Terrace

12/15/17
8027 17451 Fire Station 14 (2018) & Fire Station 14 Training Tower (2019)

07/07/17
8017 86001 Sheboygan Ave Water Main Replacement

07/07/17
8016 84024 Traffic Signal at Mineral Point and Yellowstone

06/16/17
8008 84024 Traffic Signal at Mineral Point and Yellowstone

08/25/17
8003 10524 McPike Park - Skatepark Seating Area

06/16/17
8002 17167 Forest Hill Cemetery Improvements 2017

09/22/17
8000 11649 E. Gilman St, N. Pinckney St and N. Bultler St Resurfacing w/Utilities

10/06/17
7999 11469 N. Hancock Street Reconstruction

07/21/17
7998 11591 Fire Station 10 Storefront Replacement

06/16/17
7980 10986 Corporate Drive Greenway

07/21/17
7979 10991 Monona Bay Shoreline Repairs

07/21/17
7978 20166 Monona Terrace

10/20/17
7976 11470 N. Blair Street Resurfacing wth Utlities

12/21/17
7974 53W1720 Monroe Street Reconstruction

07/07/17
7973 45826 Colony Dr & Gammon Rd

07/07/17
7970 17437 2017 Demetral Park Adult Fitness

06/16/17
7965 86003 CIPP Rehabilitation of Water Mains - 2017

06/16/17
7964 86001 Sheboygan Ave Water Main Replacement

07/11/19
7963 10435 Cannonball Water Main

06/16/17
7959 17317 Park Paving 2017

05/05/17
7957 11598 Blount Street Resurfacing

04/21/17
7956 11434 Resurfacing with Utilities 2017

08/04/17
7952 11471 Judge Doyle Garage(20017) Government East Ramp Demolition(2019)

08/11/17
7951 01627 Capitol East District Parking Structure

09/08/17
7950 11653 Summit Maintenance Facility - Building Improvements

04/21/17
7949 17434 Goodman Park Ice Rink Improvements

05/05/17
7948 17167 Forest Hill Cemetery Improvements 2017

04/12/17
7946 53W1464 Madison Municipal Building (MMB)

04/21/17
7945 17417 Monona Terrace Ped/Bike Path

04/26/17
7939 53W1464 Madison Municipal Building (MMB)

04/21/17
7936 10442
110 S. Paterson Street

04/07/17
7935 11590 Woods Road Resurfacing

03/15/17
7934 53W1464 Madison Municipal Building (MMB)

05/19/17
7933 17137 PENN PARK RESTROOM BUILDING

05/05/17
7930 10543 Parks Improvements

05/19/17
7929 17347 2017 Park Playground Improvements - Group 3

04/07/17
7928 17555 2017 Parking Garage Maintenance

04/07/17
7927 17440 2017 Brittingham Park Accessible Playground

04/07/17
7925 17343 2017 Park Plaground Improvements

03/24/17
7922 17434 Goodman Park Ice Rink Improvements

04/07/17
7917 17137 PENN PARK RESTROOM BUILDING

02/24/17
7913 10457 West Transfer Station - Pole Shed

02/24/17
7912 10457 West Transfer Station - Pole Shed

02/24/17
7911 10457 West Transfer Station - Pole Shed

03/24/17
7910 16126 State Street Capitol Garage Relighting and Electrical Controls and Upgrade

03/15/17
7906 11467 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2017

03/29/17
7905 11467 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2017

03/29/17
7904 11466 Sidewalk Program 2017, Ald. District 15

03/15/17
7903 11465 Sidewalk Program 2017, Ald. District 17

04/07/17
7902 11464 Sidewalk, Curb & Gutter, Citywide Installation and Repair 2017

07/08/21
7901 11515 Demetral Park Path Phase 2

03/29/17
7900 11463 Pavement Crack Repair and Chip Seal 2017

03/29/17
7899 11463 Pavement Crack Repair and Chip Seal 2017

03/29/17
7898 11463 Pavement Crack Repair and Chip Seal 2017

03/29/17
7897 11463 Pavement Crack Repair and Chip Seal 2017

08/11/17
7896 11571 2017-New Sidewalk Installation

05/05/17
7895 11491 Villager Mall Alley and Storm Relief

02/24/17
7889 10403 Overture Center Garage Elevator Modernization

02/10/17
7887 17315 2017 Parks Division Landscaping

02/10/17
7884 17075 Alicia Ashman Library

02/24/17
7880 10439 Lakeview Reservoir Landscaping

02/10/17
7879 17315 2017 Parks Division Landscaping

01/27/17
7877 10990 Warner Boat Launch Breakwater Reconstruction

11/18/16
7872 45300 Semi Permanent Epoxy Pavement Marking

02/10/17
7869 10001 Library Maintenance & Support Center Remodel

01/27/17
7866 17472 2017 Tennis and Basketball Court Resurfacing

12/16/16
7854 17434 Goodman Park Ice Rink Improvements

05/19/17
7852 11005 Streets East Paving

11/04/16
7851 11473 CIPP Rehab of Sanitary and Storm Sewers - 2016

04/21/17
7850 11435 Yuma Drive Resurfacing with Utilities

06/16/17
7849 11462 Local Road Traffic Calming & Arterial Ped Enhancements 2017

07/07/17
7848 11459 Wilson Street and Henry St Resurfacing with Utilities

05/19/17
7847 11430 N. Bassett, Conklin/Univ Alley & Henry/Broom Alley Reconstruction

02/17/17
7846 11438 Watts Road and Harvest Moon Lane

05/05/17
7845 11437 S. Stoughton Rd Service Rd,Remington Rd & Blossom Ln

02/08/18
7843 11461 Ronald Reagan Ave, John Wall Dr and Merchant St

01/27/17
7842 10898 Grand Ave, Van Hise, Park Pl and Mason St Reconstruction

04/29/21
7838 11432 Dean Ave, Allis Ave, Tyler Cir & Seth Cir

02/24/17
7837 11103 Langdon Street Resurfacing and Streetscape

04/21/17
7836 11433 Douglas, Lamont, Acacia, Louden, Kvamme

02/10/17
7835 10899 Gregory/Knickerbocker/Sprague/Sheldon Reconstruction

10/21/16
7834 10800 CIPP Wet Lining Rehab of Sanitary Sewer - 2016

11/18/16
7823 10442
110 S. Paterson Street

01/27/17
7821 10445 Old Sauk Road Water Pipeline (2018)

11/04/16
7820 11489 Citywide Median Planting 2017

11/04/16
7819 10250 Cottage Grove Road Median Planting 2017

11/04/16
7818 11488 Traffic Calming Medians Landscaping 2017

10/07/16
7816 10461 Demolition - 217 N. First St.

11/04/16
7815 10848 Wheeler at Bonner - Cherokee Pond

03/24/17
7813 11431 Sunset Courts (East, West, North & South)

10/07/16
7806 17140 Esther Beach Park Phase II Improvements

12/16/16
7803 11429 Capital Square Pavement Replacement Phase 2


Future Project

7802 16108 Capital City Path Extension


Future Project

7802 16109 Capital City Path Extension-Sanitary


Future Project

7802 53W1791 Capital City Path – Segment 4-6

06/16/17
7801 10154 Capital City Path – Segment 1

05/05/17
7800 11468 Bridge Maintenance and Repairs 2017

07/21/17
7799 11460 Bike Paths 2017

03/24/17
7798 11434 Resurfacing with Utilities 2017

02/10/17
7797 11369 Resurfacing 2017

02/10/17
7796 11369 Resurfacing 2017

02/10/17
7795 11369 Resurfacing 2017

10/07/16
7792 10617 Bowman Baseball Backstop Replacement

08/12/16
7784 11363 Olbrich Gardens Solar Hot Water System Installation

08/12/16
7782 10121 Esther Beach Park Shelter

07/22/16
7780 11400 Williamson Street Bridge Repair-2016

12/02/16
7776 11001 Wash Bay

09/09/16
7774 10457 West Transfer Station - Pole Shed

09/09/16
7773 45019 Public Safety Radio System 2016

07/11/19
7769 11314 Sycamore Ave Public Works Maintenance Facility – Office Remodel

08/26/16
7767 10488 Goodman Park Maintenance Storage Building D

07/01/16
7763 11400 Williamson Street Bridge Repair-2016

07/01/16
7761 53W1865 Forest Hill Mausoleum-Building Envelope Repairs

09/09/16
7760 10305 Fleet Service Relocation

08/05/16
7758 10952 Police Department West District

08/05/16
7757 11366 Fire Station 9 Roof Replacement

06/24/16
7756 10290 CIPP Rehab of Large Diameter Sanitary and Storm Sewer

07/01/16
7755 B000127 Metro Transit Repair and Refurbish Underground Diesel Fuel Storage Tanks

08/05/16
7754 10305 Fleet Service Relocation

01/20/17
7751 53W1464 Madison Municipal Building (MMB)

08/26/16
7750 53W1464 Madison Municipal Building (MMB)

06/10/16
7748 10800 CIPP Wet Lining Rehab of Sanitary Sewer - 2016

06/10/16
7747 10876 SOUTH POINT YARD WASTE SITE AND DRIVEWAY REPAVING

06/03/16
7745 B000127 Metro Transit Repair and Refurbish Underground Diesel Fuel Storage Tanks

06/03/16
7740 17435 2016 Garner Park Tennis to Pickleball - Court Conversion

07/08/16
7739 17143 Brittingham Park Sidewalk Improvements

05/20/16
7737 10914 Monona Terrace

05/06/16
7735 12095 Madison Water Utility-SCADA Room Renovation

08/05/16
7730 20170 Monona Terrace Fire Alarm System Upgrade

06/10/16
7729 86100 Repaint Madison Water Utility Reservoirs 9, 115, and 315

04/13/16
7728 17423 2016 Parks Sun Shelters Installation

06/16/17
7726 53W1832 Midtown Police District Station

04/22/16
7722 53W1864 MATC NORTH DITCH RESTORATION

04/27/16
7716 17456 2016 Parking Garage Maintenance

04/08/16
7715 12095 Madison Water Utility-SCADA Room Renovation

03/30/16
7713 10800 CIPP Wet Lining Rehab of Sanitary Sewer - 2016

05/06/16
7711 174295 Park Paving - 2016

03/25/16
7710 53W1734 Willow Creek Treatment System

03/25/16
7709 17422 2016 Fall Parks Division and Water Utility Landscaping

03/09/16
7698 11104 Sidewalk Program 2016, Ald. District 2

07/08/16
7696 11363 Olbrich Gardens Solar Hot Water System Installation

04/08/16
7695 17439 2016 Park Playground Improvements- Group 2

05/06/16
7693 17441 2016 Park Playground Improvements - Group 3

02/24/17
7692 17449 Packers Ave/Darwin Rd Intersection

06/16/17
7690 11351 Monona Bay Weed Cutter Dredging

03/09/16
7685 53W1386 Engineering Operations Building Addition

03/25/16
7675 10430 CIPP Rehabilitation of Water Mains - 2016

03/04/16
7674 17422 2016 Fall Parks Division and Water Utility Landscaping

05/06/16
7673 11212 E. Broadway Service Rd Water Main Replacement

06/10/16
7670 11301 Pleasant View and Blackhawk Rd Intersection Improvement

03/04/16
7669 17422 2016 Fall Parks Division and Water Utility Landscaping

04/01/16
7668 17423 2016 Parks Sun Shelters Installation

06/10/16
7666 11306 N. Segoe Road Water Main Replacement

03/04/16
7664 17438 2016 Park Playground Improvements - Group 1

03/04/16
7663 11107 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2016

02/07/19
7662 10002 Pinney Library

05/06/16
7660 17435 2016 Garner Park Tennis to Pickleball - Court Conversion

03/25/16
7659 11123 Bridge Maintenance and Repairs 2016

02/19/16
7647 10617 Bowman Baseball Backstop Replacement

03/30/16
7644 11300 New Sidewalk Installation 2016

06/01/16
7643 11211 Bedford Street and MATC Pipe Bursting

11/04/16
7641 10906 Woodrow Street Reconstruction

04/08/16
7640 10904 Turner Ave and Allis Ave

03/25/16
7639 11106 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2016

03/04/16
7638 11105 Sidewalk Program 2016, Ald. District 6

02/19/16
7637 11104 Sidewalk Program 2016, Ald. District 2

06/24/16
7636 10217 Sherman Avenue (North)

03/09/16
7634 10507 Pavement Crack Repair and Chip Seal-2016

03/09/16
7633 10507 Pavement Crack Repair and Chip Seal-2016

03/25/16
7632 10507 Pavement Crack Repair and Chip Seal-2016

03/25/16
7631 10507 Pavement Crack Repair and Chip Seal-2016

05/20/16
7630 11126 Local Road Traffic Calming & Arterial Ped Enhancements-2016

02/19/16
7628 11107 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2016

02/05/16
7627 11091 Hillcrest Dr & Hillcrest Circle

04/27/16
7626 11095 Fordem Aveune Utility Replacement w/Resurfacing

03/30/16
7625 11099 Cottage Grove Road Resurfacing

06/16/17
7624 10429 City View Drive (new street)

02/19/16
7623 10903 Capital Square Pavement Replacement Phase 1

02/05/16
7621 10895 2016 Resurfacing

01/22/16
7618 17430 2016 Tennis and Basketball Court Resurfacings

02/05/16
7616 10895 2016 Resurfacing

02/05/16
7615 10895 2016 Resurfacing

01/22/16
7614 53W1503 McKenna Boulevard/S. Gammon Road

02/21/19
7613 11094 Portage Road

02/21/19
7613 11785 Portage to Eastpark Path

02/21/19
7613 53W0916 Eastlawn Plat Multi-Use Path Bridge

03/25/16
7612 10893 S. Park Street Sanitary Replacement

02/05/16
7611 11097 2016 Utilities with Resurfacing

11/13/15
7610 10526 Tree Plantings

11/13/15
7609 10526 Tree Plantings

11/06/15
7598 17453 2016 Street Tree Replacement

10/09/15
7585 10394 2015 Parking Garage Maintenance

11/04/16
7584 10896 Sargent St and Walter St Resurfacing w/Utilities

10/23/15
7580 10526 Tree Plantings

10/23/15
7579 10526 Tree Plantings

10/09/15
7570 17453 2016 Street Tree Replacement

11/06/15
7565 10914 Monona Terrace

02/10/17
7564 10001 Library Maintenance & Support Center Remodel

08/21/15
7563 53W1854 Arboretum Screen Structure Repair

08/07/15
7558 11176 Felland Road Resurfacing

08/07/15
7557 53W1788 STREETS EAST STORMWATER IMPROVEMENT

07/24/15
7554 53W1932 CIPP Rehab of Sanitary and Storm Sewers 2015

08/21/15
7545 10394 2015 Parking Garage Maintenance

08/07/15
7544 10468 Warner Park Basketball Court Lighting

09/04/15
7541 10526 Tree Plantings

06/19/15
7539 53W1118 High Point Road Confluence Pond Regrading

06/19/15
7538 53W1800 Nakoma Greenway Repair

08/05/16
7532 53W1690 5200 Camden flood purchase

06/05/15
7531 53W1831 Lake Edge Park Shelter

07/10/15
7529 10442
110 S. Paterson Street

03/21/19
7528 10305 Fleet Service Relocation

07/10/15
7526 10486 Owl Creek Park Development-Phase2

04/24/15
7517 53W1892 Carpeting at South District Police Station

09/04/15
7515 10463 Tenney Lagoon Shoreline Native Vegetation Installation and Maintenance

04/10/15
7506 53W1855 Anderson Street Sanitary Lining Repair

05/08/15
7505 10309 Landscape Restoration 2015

03/27/15
7503 53W1916 2015 Spring Parks Division & Water Utility Landscaping

03/27/15
7501 53W1892 Carpeting at South District Police Station

01/13/17
7500 10434 Unit Well 31 Reservoir and Facility Construction

04/17/15
7499 10434 Unit Well 31 Reservoir and Facility Construction

10/06/17
7498 10452 Unit Well 12 Upgrade

03/27/15
7496 10394 2015 Parking Garage Maintenance

03/06/15
7495 53W1532 Brittingham Park Path and Boat Launch Reconfiguration-2015

03/20/15
7493 10631 2015 Park Playgrounds - Group 2 - Tenney Park

03/20/15
7493 10632 2015 Park Playgrounds - Group 2 - Sunridge Park

03/20/15
7493 10637 2015 Park Playgrounds - Group 2 - Junction Ridge Park

03/20/15
7493 10640 2015 Park Playgrounds - Group 2 - Demetral

03/20/15
7493 10643 2015 Park Playgrounds - Group 2 - Bernies Beach Park

03/20/15
7493 10645 2015 Park Playgrounds - Group 2 - Arbor Hills Park

05/08/15
7490 53W1930 Burning Wood/Comanche Way and Fourth Street Util w/Resurfacing

03/20/15
7488 53W1928 2015 Dog Park Improvements

03/06/15
7487 53W1927 Structural Rehabilitation of Water Mains - 2015

03/20/15
7484 53W1929 2015 Street Tree Replacement

04/24/15
7478 53W1922 Forest Hill Cemetery- John Catlin Chapel Roof Replacement

03/27/15
7475 53W1919 Quann Park Tennis Courts - Phase 2

02/20/15
7473 53W1918 2015 Park Playgrounds - Group 1

03/06/15
7471 53W1917 2015 Parks Division Tree Planting

03/06/15
7470 53W1916 2015 Spring Parks Division & Water Utility Landscaping

02/20/15
7466 53W1915 Highland Manor Park Improvements

03/06/15
7465 53W1914 Park Paving - 2015

06/10/16
7464 53W1911 Demetral Park Path

03/09/16
7462 53W1681 Cottage Grove Rd and Dempsey Improvements

03/06/15
7459 53W1772 Yahara Hills Facility Improvements

03/27/15
7458 53W1772 Yahara Hills Facility Improvements

01/27/17
7457 53W1910 Whitney Way Water Pipeline

02/20/15
7456 53W1908 2015 Tennis and Basketball Court Resurfacing

01/07/15
7454 53W1434 Fire Station Administration Office Building and Fire Station #1 - (Hovde Properties Tenant Improvements)

04/07/17
7452 53W1903 Lakeview Reservoir Pipeline Improvements, Phase 2

04/10/15
7451 53W1836 Center Ave and Sommers Ave Reconstruction

05/24/18
7450 53W1867 Darbo Drive to Webb Avenue New Street Connection Assessment District - 2018 (Richard Davis Lane)

05/22/15
7449 53W1899 Bridge Maintenance and Repairs 2015

06/05/15
7448 53W1515 Wirth Court Reconstruction


Future Project

7447 53W1061 Hermina and Union Street Reconstruction

05/08/15
7446 53W1887 Marsh Road Resurfacing

06/19/15
7445 53W1510 Spruce St Reconstruction

05/08/15
7444 53W1882 Local Road Traffic Calming & Arterial Ped Enhancements-2015

05/08/15
7443 53W1876 Cross Street

05/22/15
7442 53W1844 Turner Avenue

05/22/15
7441 53W1842 Hoepker Road

04/24/15
7439 53W1506 Potter Street Reconstruction


Future Project

7438 13305 Nakoma Road Sidewalk

04/01/15
7437 53W1793 Utilities with Resurfacing 2015

04/01/15
7435 53W1845 Larkin, Glenway, Hillcrest, Zwerg, Ross Resurfacing w/Utilities

03/27/15
7434 53W1843 Hanson Road

05/22/15
7433 53W1753 State Street Sidewalk Repairs-2015

03/27/15
7432 53W1839 American Pkwy/Eastpark Blvd & American Pkwy/Buttonwood Dr

05/21/26
7431 53W1834 Cannonball Path Phase 6

04/22/16
7430 53W1890 N LAKE STREET RESURFACING ASSESSMENT DISTRICT – 2016

05/22/15
7429 53W1901 Sprecher Road, Commercial Ave Intersection

03/27/15
7428 53W1847 Adams, S. Randall and Mound Resurfacing w/Utilities

03/06/15
7427 53W1885 Repairing & Sealing Pavement Cracks, Major Streets - 2015

03/06/15
7426 53W1884 Repairing & Sealing Pavement Cracks, Local Streets - 2015

03/06/15
7425 53W1881 Chip Seal 2015-West

03/06/15
7424 53W1880 Chip Seal 2015-East

03/20/15
7423 53W1846 N Pinckney St Resurfacing w/Utilities

02/06/15
7421 53W1898 City Wide Street & Storm Upgrade and Repairs

02/06/15
7419 53W1856 S. Owen Drive Assessment District - 2015

02/06/15
7418 53W1837 Tompkins Drive Assessment District - 2015

12/19/14
7417 53W1053 Bascom Pl/Bascom St/Chamberlain Ave Reconstruction

04/10/15
7416 53W1826 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2015

02/20/15
7414 53W1886 Resurfacing 2015

02/20/15
7413 53W1886 Resurfacing 2015

02/20/15
7412 53W1886 Resurfacing 2015

01/09/15
7411 53W1896 Booster Pump Station 115 Upgrade

12/19/14
7409 53W1892 Carpeting at South District Police Station

12/12/14
7408 53W1785 Skatepark - Central Park, Madison

04/08/16
7407 53W1507 Jenifer, Paterson & Brearly St Reconstruction & Few St(resurfacing)

09/26/14
7401 53W1735 Olbrich Park Canoe Launch


Future Project

7399 53W1874 Metro Roof Phase 1 of 2

08/05/16
7398 53W1832 Midtown Police District Station

05/08/15
7395 53W1511 Madison St Reconstruction & Oakland Ave(resurface)&Alley

05/08/15
7392 53W1866 Nakoma Park Pedestrian Entrance Steps-Masonry Repairs

06/10/16
7391 53W1865 Forest Hill Mausoleum-Building Envelope Repairs

02/06/15
7389 53W1250 Old Middleton/Eau Claire Intersection and Good Neighbor Trail

05/22/15
7386 53W1820 Tenney Lagoon Shoreline Restoration

09/05/14
7385 53W1808 Theresa Terrace Neighborhood Center

03/27/15
7383 53W1440 HVAC Upgrade for Olbrich Botanical Gardens-Phase 1

12/19/14
7381 53W1792 Johns Street and Emil Street Utilities with Resurfacing

07/25/14
7369 53W1663 Eastmorland Park Greenway & Pond

02/06/15
7367 53W1828 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2015

02/20/15
7366 53W1828 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2015

03/27/15
7365 53W1826 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2015

02/06/15
7364 53W1825 Sidewalk Program-2015

03/06/15
7363 53W1825 Sidewalk Program-2015

08/08/14
7362 53W1795 2014 Playground Improvements- Group 2

07/11/14
7356 53W1775 Bittersweet Place

08/22/14
7354 53W1819 Lakeview Reservoir Pipeline Improvements

08/22/14
7352 53W1818 Aldo Leopold Park Shelter Installation

06/27/14
7351 53W1676 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2014

08/08/14
7350 53W1815 Bowman Lighting System - Phase Two

08/08/14
7349 53W1814 East Washington Ave Median Replanting-2014

08/08/14
7348 53W1814 East Washington Ave Median Replanting-2014

08/05/16
7347 53W1813 Fire Station #3 Roof Replacement

07/02/14
7343 53W1625 Highland Manor Storm Shelter (Site Grading Component)

06/20/14
7341 53W1645 CIPP Rehab of Sanitary and Storm Sewers 2014

08/22/14
7339 53W1809 Lakeview Reservoir Reconstruction

08/08/14
7335 53W1808 Theresa Terrace Neighborhood Center

06/20/14
7334 53W1806 Fire Station #5 Roof Door and Hose Tower Repairs

08/12/16
7330 53W1734 Willow Creek Treatment System

09/26/14
7327 53W1617 Dunns Marsh Treatment Structure

07/11/14
7325 53W1801 Brittingham Park Paving Improvements

07/02/14
7321 53W1797 Structural Rehabilitation of Water Mains - 2014 West

06/27/14
7320 53W1796 Structural Rehabilitation of Water Mains - 2014 East

06/06/14
7319 53W1625 Highland Manor Storm Shelter (Site Grading Component)

06/20/14
7318 53W1795 2014 Playground Improvements- Group 2

06/20/14
7317 53W1622 Morrison Court Reconstruction

06/06/14
7312 53W1785 Skatepark - Central Park, Madison

09/11/15
7311 10644 2015 Park Playgrounds - Group 2 - Badger Park

09/11/15
7311 53W1756 CCB City Channel and Shared Resource Planning Remodel

04/25/14
7307 53W1625 Highland Manor Storm Shelter (Site Grading Component)

06/01/14
7303 53W0740 Johnson Street, East Reconstruction

04/04/14
7302 53W1742 2014 Park Division, Parking & Water Utility Landscaping

04/04/14
7301 53W1742 2014 Park Division, Parking & Water Utility Landscaping

04/04/14
7300 53W1742 2014 Park Division, Parking & Water Utility Landscaping

05/06/16
7292 53W1773 Lower Badger Mill Sanitary Sewer Interceptor Phase 3

08/08/14
7291 53W1299 Lower Badger Mill Sanitary Sewer Interceptor Phase - 2

07/25/14
7286 53W1772 Yahara Hills Facility Improvements

03/28/14
7284 53W1767 2014 Playground Improvements- Group 1

04/11/14
7283 53W1766 2014 Parking Garage Maintenance

03/28/14
7281 53W1532 Brittingham Park Path and Boat Launch Reconfiguration-2015

02/21/14
7280 53W1667 Boulevard Landscaping - 2013

05/23/14
7277 53W1762 Park Paving - 2014

03/28/14
7276 53W1588 Near West Sanitary Sewer Relocation Assessment District - 2014

04/11/14
7275 53W1761 Landscape Restoration 2014

05/23/14
7274 53W1757 Breese Stevens Field Synthetic Turf - 2014

02/21/14
7272 53W1667 Boulevard Landscaping - 2013

02/06/15
7270 53W1750 Hwy 151/Lancaster Dr Water Main Crossing


Future Project

7269 53W1749 Dairy Drive MFD Training Exercise Building

03/07/14
7266 53W1747 Tenney Park Concrete Bridge Historic Restoration-2014

03/28/14
7265 53W1743 Unit Well 7 Reconstruction and Filter Addition

02/21/14
7264 53W1742 2014 Park Division, Parking & Water Utility Landscaping

04/11/14
7260 53W1740 2014-2016 Semi-Permanent (Epoxy) Pavement markings

02/21/14
7259 53W1626 Elver and Reindahl Park Splash Pads

02/21/14
7255 53W1678 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2014

09/26/14
7254 53W1712 John Nolen Path Reconstruction

06/27/14
7252 53W1718 Local Road Traffic Calming & Arterial Ped Enhancements-2014

06/06/14
7251 53W1290 South Point Road

05/09/14
7250 53W0606 Clemons, Helena, Walton, Jenifer Reconstruction

03/28/14
7248 53W1056 North St, Hoard St and Commercial Ave Reconstruction

04/11/14
7247 53W1052 Adams Street Reconstruction

03/28/14
7246 53W1198 Johnson and Henry Street Terrace Reconstruction

03/28/14
7246 53W1360 Langdon Street Streetscape 2014 & N. Hamilton Street

04/24/15
7245 53W1704 Capital City Path Reconstruction and Bridge Replacement

03/07/14
7244 53W1672 Utility Replacement with Resurfacing - 2014

03/07/14
7243 53W1721 Henry Street, N. Reconstruction

03/07/14
7243 53W1731 Mifflin(West) Street Utilities with Resurfacing

04/11/14
7242 53W1717 Repairing & Sealing Pavement Cracks, Major Streets-2014

04/11/14
7241 53W1716 Repairing & Sealing Pavement Cracks, Local Streets - 2014

02/21/14
7240 53W1715 Chip Sealing 2014-West

02/21/14
7239 53W1714 Chip Sealing 2014-East

06/20/14
7238 53W1547 Cannonball Path Phase 5

06/10/16
7236 53W0861 Ice Age Junction Path & E. Mendota-Pheasant Branch Greenway

05/09/14
7235 53W1730 Packers Avenue Sidewalk at Lakeland College

04/11/14
7234 53W0615 Commonwealth/Fox/Gregory Reconstruction

03/28/14
7233 53W1699 Resurfacing 2014

03/28/14
7232 53W1699 Resurfacing 2014

06/27/14
7230 53W1727 High Street

05/23/14
7229 53W1705 Alley Reconstruction, Block 2 Wingra Park

06/20/14
7228 53W1583 Alley Reconstruction, Block 11 Bowens addition

06/05/15
7227 53W1683 Bear Claw Way, Wilrich St and Cobalt St (new streets)

06/27/14
7226 53W1338 Elderberry Road (new street)

06/27/14
7224 53W1726 Cross Oak Drive (new street)

01/24/14
7223 53W1725 Goodman Topsoil Shed

05/09/14
7221 53W1699 Resurfacing 2014

02/07/14
7220 53W1699 Resurfacing 2014

01/24/14
7219 53W1699 Resurfacing 2014

01/24/14
7218 53W1699 Resurfacing 2014

01/24/14
7217 53W1590 King Street and E. Main Street Reconstruction

02/07/14
7215 53W1710 Tennis/Basketball Court Resurfacing - 2014

02/07/14
7211 53W1709 West Badger Rd and Lancaster Dr Water Main Replacement

03/26/14
7206 53W1193 State Street Mall Reconstruction

12/06/13
7203 53W1645 CIPP Rehab of Sanitary and Storm Sewers 2014

01/10/14
7202 53W1631 Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling

08/22/14
7200 53W1696 Warner Park Cunette Replacement

10/04/13
7194 53W1183 Own Park Drainage Channel Stabilization-2013

10/04/13
7191 53W1619 Monona Terrace Maintenance Projects-2013

01/09/15
7188 53W1693 Booster Station 115 Pipeline Improvements

10/04/13
7185 53W1685 Well 24 - Roof Repairs

09/06/13
7182 53W1183 Own Park Drainage Channel Stabilization-2013

09/06/13
7181 53W1619 Monona Terrace Maintenance Projects-2013

09/06/13
7180 53W1619 Monona Terrace Maintenance Projects-2013

08/23/13
7177 53W1196 Reiner Road Resurfacing

02/07/14
7176 53W1678 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2014

03/07/14
7175 53W1676 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2014

02/21/14
7174 53W1675 Sidewalk Program-2014

02/07/14
7173 53W1675 Sidewalk Program-2014

09/20/13
7172 53W1671 Traffic Engineering Electrical Upgrades-2013

08/09/13
7170 53W1648 Unit Well 26 Reservoir Repairs

08/16/13
7169 53W1165 South Point Road Public Works Storage Building

11/08/13
7167 53W1667 Boulevard Landscaping - 2013

07/26/13
7161 53W1567 Streets West, Cold Storage Roof Replacement

08/23/13
7158 53W1644 CIPP Rehab of Sanitary and Storm Sewers 2013 - Phase 1

09/06/13
7154 53W1593 Breese Stevens Field Lighting/Sound System Improvements

07/12/13
7153 53W1643 Garner Park Masonry Repairs-2013

08/09/13
7150 53W1661 Hoyt Park Fence Replacement

07/26/13
7137 53W1657 Basketball Court Reconstruction ‘13

08/09/13
7136 53W1655 Blackhawk Park Shelter Installation

08/09/13
7135 53W1656 Bowman Lighting Distribution System

08/23/13
7134 53W1649 City-County Building GR-10 Reception Windows Replacement

07/12/13
7132 53W1648 Unit Well 26 Reservoir Repairs

08/02/13
7131 53W1600 Post Watford Pond Remediation

07/12/13
7130 53W1647 2013 Park Playground Improvements

06/21/13
7124 53W1639 CIPP Rehabilitation of Water Mains - 2013

04/04/14
7123 53W1152 Fire Station #13

06/21/13
7117 53W1579 Badger Rock Path

05/10/13
7114 53W1634 Femrite Drive Resurfacing

11/08/13
7107 53W1633 Unit Well 26 Generator Addition

05/10/13
7106 53W1630 Brayton Lot Repairs

03/28/14
7104 53W1449 Tornado Shelter Project

03/28/14
7104 53W1625 Highland Manor Storm Shelter (Site Grading Component)

06/07/13
7101 53W1629 Booster Pumping Station 106 Reconstruction

08/09/13
7100 53W1628 Park Paving - 2013

08/09/13
7084 53W1619 Monona Terrace Maintenance Projects-2013

08/09/13
7083 53W1619 Monona Terrace Maintenance Projects-2013

08/09/13
7082 53W1619 Monona Terrace Maintenance Projects-2013

08/09/13
7081 53W1619 Monona Terrace Maintenance Projects-2013

08/09/13
7080 53W1619 Monona Terrace Maintenance Projects-2013

08/09/13
7079 53W1619 Monona Terrace Maintenance Projects-2013

08/09/13
7078 53W1619 Monona Terrace Maintenance Projects-2013

03/28/14
7077 53W1618 Streets East Tile Floor Replacement

05/03/13
7071 53W1615 Highland Ave Water Main Replacement

04/05/13
7069 53W1611 2013 Parking Garage Maintenance

05/03/13
7066 53W1608 Tenney Park Lagoon Outlet Gate

04/26/13
7062 53W1591 Rain Garden & Median Planting 2013

02/22/13
7061 53W1428 Don Miller Site Remediation

05/22/15
7059 53W1604 Central Park Phase 1B

06/21/13
7053 53W1552 Wolfe Addition to Hawks Creek

06/07/13
7051 53W1599 Madison Water Utility Unit Well 31 - Drill Well

02/22/13
7048 53W1580 Water Replacement with Resurfacing

06/21/13
7047 53W1597 Rennebohm Park Tennis Court Lighting

05/24/13
7045 53W1595 Upgrade Booster Pumps at Unit Well 20

06/07/13
7044 53W1593 Breese Stevens Field Lighting/Sound System Improvements

04/26/13
7043 53W1592 Breese Stevens Field Concrete Deck Repairs

04/26/13
7042 53W1589 Walter Street and Johns Street Resurfacing

03/22/13
7035 53W1495 Sidewalk Program-2013

04/26/13
7034 53W1577 MPD Training Center Parking Lot Expansion-Phase 2

02/22/13
7032 53W1575 Warner Boat Launch Dredging 2012

04/26/13
7030 53W1573 Forest Hill Cemetery- Masonry Repairs to the Receiving Vault
& Chapel, Roof Replacement for the Chappel

03/01/13
7029 53W1572 Tennis Court Resurfacing-2013

02/15/13
7028 53W1570 2013 Park and Water Utility Landscape and Maintenance Contractor

05/03/13
7027 53W1569 Fleet Services Roof Replacement

07/12/13
7026 53W1568 Traffic Engineering-Building C Roof Replacement

06/07/13
7025 53W1567 Streets West, Cold Storage Roof Replacement

03/22/13
7021 53W1492 Resurfacing 2013

03/22/13
7020 53W1492 Resurfacing 2013

06/21/13
7019 53W1560 Evan Acres Road

03/22/13
7016 53W1553 Cherokee Drive Utilities with Resurfacing

05/10/13
7015 53W1555 Wheeler Rd, Delaware Blvd & Northland Dr Resurfacing

02/22/13
7011 53W1194 Webster Street Reconstruction

12/07/12
7010 53W1551 Atwood Avenue / Dunning Street Bike Crossing

02/22/13
7009 53W1399 University Relief Storm Phase 4

07/12/13
7008 53W0853 Central Park - Phase I

06/21/13
7007 53W1538 World Dairy Campus Replat

02/22/13
7006 53W1445 W. Wilson Street Reconstruction

05/10/13
7005 53W1475 W. Johnson Street Curb and Terrace Repair 2013

02/22/13
7004 53W1496 Utility Replacement with Resurfacing - 2013 (Clymer Pl Vacation)

09/20/13
7003 53W1476 University Avenue Landscaping

05/09/14
7002 53W1332 Stoughton Road/Voges Road Intersection

04/05/13
7001 53W1491 Repairing & Sealing Pavement Cracks, Major Streets-2013

04/05/13
7000 53W1490 Repairing & Sealing Pavement Cracks, Local Streets - 2013

03/07/14
6999 53W1544 Oakridge/Ohio/Miller Resurfacing

04/26/13
6998 53W1483 N. Henry Street and Iota Court Reconstruction

04/10/15
6997 53W1047 N. Charter St and Spring St Reconstruction

02/08/13
6996 53W0618 Mound Street Reconstruction

06/07/13
6995 53W1489 Local Road Traffic Calming & Arterial Ped Enhancements-2013

01/11/13
6994 53W1462 Livingston Street Resurfacing with Utilities

03/28/14
6993 53W1543 Kendall/Prospect/Lathrop Resurfacing

03/22/13
6992 53W1356 Dayton Street (East) & N. Brearly St Reconstruction

07/12/13
6991 53W1477 Cottage Grove Road Resurfacing

04/05/13
6990 53W1482 Chip Sealing 2013-West

04/05/13
6989 53W1481 Chip Sealing 2013-East

01/10/14
6988 53W1535 John Nolen Bridge Repair 2014

04/19/13
6987 53W1478 Merrill Crest Drive

06/07/13
6986 53W1546 John Nolen Drive/North Shore Drive intersection

05/24/13
6985 53W1480 Warner Park Paths

01/25/13
6984 53W1484 N. Thornton Avenue Reconstruction

08/22/14
6983 53W1537 Royster Clark Development

05/24/13
6981 53W1534 Keyes Avenue Reconstruction

05/24/13
6980 53W1542 Brentwood/Monterey/Trailsway/Wyldewood Resurfacing

02/22/13
6979 53W1545 Washington Avenue (East) Landscaping

04/05/13
6978 53W1495 Sidewalk Program-2013

02/22/13
6977 53W1494 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2013

02/22/13
6976 53W1488 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2013

03/22/13
6971 53W1492 Resurfacing 2013

03/22/13
6971 53W1522 Storm Sewer with Resurfacing 2013

02/08/13
6970 53W1492 Resurfacing 2013

01/25/13
6969 53W1492 Resurfacing 2013

01/25/13
6968 53W1492 Resurfacing 2013

01/25/13
6967 53W1492 Resurfacing 2013

10/05/12
6965 53W1498 Madison Municipal Building- Electrical Panel Upgrade

07/12/13
6962 53W1165 South Point Road Public Works Storage Building

10/05/12
6961 53W1326 N. Franklin - N. Blair Street Sanitary Crossover

11/02/12
6959 53W1424 Midvale Median Landscaping

10/12/12
6957 53W1528 Truman Olson US Army Reserve Center

09/21/12
6950 53W1473 Boulevard Landscaping-2012

08/10/12
6948 53W1453 City View Drive Water Main

10/12/12
6946 53W1523 West Streets Lighting Retrofit - 2013

09/14/12
6944 53W1302 Park Street Pedestrian Bridge Repair

08/31/12
6942 53W1065 Warner Lagoon Outlet Culvert Repair

09/07/12
6941 53W1521 Well 15 VOC Air Stripper

07/25/12
6939 53W1520 Central Library Sanitary Sewer Lateral

07/20/12
6938 53W1519 BLAIR STREET SANITARY SEWER REPAIR 2012

08/03/12
6936 53W1497 Fire Sprinkler Installation at Fire Station #4

08/24/12
6935 53W1116 Sauk Creek Sewer Access Road, Phase 2

08/17/12
6934 53W1487 Segoe Road Water Main

08/17/12
6931 53W1486 600 Block West Badger Road Water Main

08/17/12
6926 53W1471 Park Street, Fish Hatchery Intersection Improvments

08/10/12
6925 53W1470 Commercial Avenue Service Road Railroad Crossing

08/17/12
6924 53W1469 Madison Police West District Paint and Wall Covering Replacement

07/13/12
6923 53W1468 Professional Drilling Services Associated with the Installation of a Groundwater Monitoring (Sentry) Well – Unit Well #8 / Elmside Circle Park Area.

08/31/12
6922 53W1467 Syene Road

07/13/12
6919 53W1463 CIPP REHABILITATION OF WATER MAINS - 2012

06/08/12
6918 53W1441 Don Miller & Schappe Building Demolitions

08/03/12
6912 53W1141 Eastlawn Greenway Repair

05/03/13
6907 53W1452 Paint Cross Hill Drive Water Tower

12/28/12
6906 53W1409 E. Washington Ave and Livingston St Intersection Improvement

05/25/12
6903 53W1448 Conklin Place Sanitary Sewer and Watermain Replacement

02/22/13
6902 53W1447 Olbrich Gardens Restroom Addition

07/20/12
6901 53W1446 Tenney Park Tennis Court Lighting

07/13/12
6900 53W1101 Cherokee Marsh Stormwater Management Ponds

06/29/12
6899 53W1453 City View Drive Water Main

05/04/12
6893 53W1436 Install Direct Gas HVAC Units

02/06/15
6891 53W1434 Fire Station Administration Office Building and Fire Station #1 - (Hovde Properties Tenant Improvements)

05/04/12
6889 53W1433 2012 Madison Parking Ramp Maintenance

06/14/13
6886 53W1348 Ice Age Junction Trail

06/14/13
6886 53W1620 Jeffy Trail Sanitary Sewer Assessment District

08/17/12
6883 53W1426 Starkweather Creek Restoration 2012 - Anderson St

04/06/12
6882 53W1425 Regent Street Resurfacing with Utilities

01/01/12
6881 53W0712 Monona Drive Reconstruction - Ph 2

06/01/12
6877 53W1422 Garner Park Masonry Repairs 2012

05/04/12
6876 53W1421 Dairy Drive Test Well

06/29/12
6875 53W1420 Engineering Service Building PV System - 2012

07/13/12
6871 53W1415 Door Creek Culvert

05/11/12
6870 53W1414 Goodman Maintenance Facility, Building B-Heating and Ventilation Improvements

05/25/12
6869 53W1412 W. Johnson Street Curb and Terrace Repair

03/16/12
6864 53W1404 Cherokee Park Playground Equipment

07/13/12
6859 53W1400 Hudson Park Improvements

01/11/13
6857 53W1396 CIPP REHAB OF SANITARY SEWERS - 2012 PHASE 2

03/23/12
6856 53W0518 University Avenue Reconstruction

03/23/12
6856 53W1341 Manitou Way Resurfacing

03/23/12
6856 53W1395 CIPP REHAB OF SANITARY SEWERS - 2012 PHASE 1

08/10/12
6855 53W1035 Arboretum Pond 3 - Improvements Phase 2

03/02/12
6854 53W1394 Park Landscaping-2012

04/06/12
6851 53W1391 Streets South Point Rd - Salt Shed Roof Replacement

02/24/12
6848 53W1388 STH 113 Tree Planting and Landscaping - 2012

03/30/12
6846 53W1387 Citywide Median Planting - 2012

02/10/12
6843 53W1308 Resurfacing 2012

02/10/12
6842 53W1308 Resurfacing 2012

05/04/12
6840 53W1382 Cannonball Pipeline Phase 3

04/20/12
6838 53W1380 Monona Terrace Community & Convention Center Operable Partition Repair and Fabric Replacement

08/10/12
6837 53W1371 Senior Center Remodeling - Phase III

03/30/12
6836 53W1378 RESTORATION LANDSCAPING 2012

06/08/12
6835 53W1377 Kennedy Storm Bypass - Pipe - 2012

04/12/13
6834 53W1375 Paunack Park Shoreline

10/12/12
6833 53W1374 Burrows Park Shoreline

11/07/14
6832 53W0312 Wingra Creek Parkway, Phase 3

05/09/14
6831 53W1182 Yahara River Shoreline Repair

07/20/12
6829 53W1370 Forest Hill Cemetery Receiving Vault - Preservation of the North Wall

01/11/13
6828 53W1369 Olbrich Botanical Gardens Roof Replacement

01/27/12
6824 53W1367 Fairchild, Doty & Carroll Street (Outer Loop)

04/06/12
6816 53W0614 Beld Street Reconstruction

04/20/12
6815 53W1351 University Avenue Parking Lot University Ave final surface

02/10/12
6811 53W1353 Tenney Park Parking Lot Reconstruction

01/27/12
6810 53W1352 Warner Park Parking Lot Reconstruction-Phase 3

05/04/12
6809 53W1312 Utility Replacement with Resurfacing - 2012

03/09/12
6806 53W1310 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2012

02/10/12
6805 53W1373 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2012

02/10/12
6804 53W1311 Sidewalk Program-2012

03/09/12
6803 53W0603 S. Ingersoll St & Rutledge St Reconstruction

02/10/12
6802 53W1308 Resurfacing 2012

02/10/12
6801 53W1308 Resurfacing 2012

02/10/12
6801 53W1315 STORM WITH RESURFACING 2012

01/27/12
6800 53W1308 Resurfacing 2012

01/27/12
6799 53W1308 Resurfacing 2012

01/27/12
6798 53W1308 Resurfacing 2012

04/06/12
6797 53W1307 Repairing & Sealing Pavement Cracks, Major Streets-2012

04/06/12
6796 53W1306 Repairing & Sealing Pavement Cracks, Local Streets - 2012

01/27/12
6793 53W0608 N. Orchard St and Spring St Reconstruction

06/08/12
6792 53W1049 Midland Street Reconstruction

05/25/12
6791 53W1341 Manitou Way Resurfacing

06/08/12
6790 53W0613 Madison Street Reconstruction

06/08/12
6789 53W0390 CTH M - Valley View Road - Pleasant View Road Intersection

06/08/12
6789 53W1148 Langdon Street Resurfacing

06/08/12
6789 53W1305 Local Road Traffic Calming & Arterial Ped Enhancements-2012

03/09/12
6788 53W1188 Lawrence St, O'Sheridan St and Bresland Ct Reconstruction

04/05/13
6787 53W1246 Johnson St, E Bike Path

03/23/12
6786 53W1266 Ice Age Junction Trail – 2012

03/23/12
6785 53W1192 Gorham/Henry/Frances Reconstruction(State St side streets)

01/11/13
6783 53W1132 Fairchild & W. Mifflin St. Reconstruction (Outer Loop)

12/28/12
6782 53W0977 Elderberry Road and Samuel Drive (new roads)

07/13/12
6781 53W1350 Eastwood Drive Sidewalk & Capital City Path Realignment

04/06/12
6780 53W1303 Chip Sealing 2012-West

04/06/12
6779 53W1304 Chip Sealing 2012-East

01/27/12
6778 53W1296 Camden Road

07/13/12
6776 53W1297 Bike Paths 2012

05/10/13
6775 53W1055 Baltzell St and Cross St Reconstruction

08/17/12
6768 53W1329 Madison Police West District Carpet Replacement

06/15/12
6744 53W1094 LAKE EDGE BASIN REPAIR

06/08/12
6741 53W0942 Forsythia Cunette Rehabilitation

06/08/12
6741 53W1437 Bordner Park - Cunette Removal

07/13/12
6701 53W1242 Capital City Path - Segment 2

09/07/12
6656 53W1210 Tenney Maintenance Bridge

07/06/12
6611 53W1149 Block 101 Alley

05/27/13
6590 53W1152 Fire Station #13

04/20/12
6586 53W1142 Fire Station #2 Remodel

04/20/12
6579 53W0982 Langlois Street & Merrill Crest Dr

04/12/13
6505 53W1033 Mezzanine Construction-Sycamore

12/04/15
6484 53W1386 Engineering Operations Building Addition

10/05/12
6469 53W0945 Olbrich Drainage Ditch Stabiliztion

06/14/13
6465 53W0940 Bedford @ North Shore Storm Box Replacement

08/10/12
6457 53W1393 Madison Police Department Training Center - Phase 3

03/23/12
6444 53W0955 Rosa Road Resurfacing and Sidewalk

02/17/12
6369 53W0833 Tennis Court Resuracing - 2012

01/13/12
6311 53W0778 W. Lakelawn Place Reconstruction
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Due 2/18/2028 10:00 am US/Central Open TS-2750 & TS-2755 - Native Landscape Contractor

Milwaukee Metropolitan Sewerage District (MMSD)

Bid Due: 2/18/2028

CONTRACT NUMBER: 9585 CONTRACT: Warner Park Lagoon Channel Improvements Percentage of Contract Completed:

City of Madison

Bid Due: 12/17/2026

Project Number: 25D1V Bid Advertisement Date: 11/06/2026 Plan Holders: Plan Holders Bid Date:

State Government of Wisconsin

Bid Due: 12/15/2026

Project ID: 326021 Title: Consultant Services for On-Call and Capital Improvement Projects for

County of Dane

Bid Due: 12/21/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.