| Location: | Wisconsin |
|---|---|
| Posted: | Jun 10, 2026 |
| Due: | Nov 5, 2026 |
| Agency: | City of Madison |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Due Date
|
Contract #
|
Project #
|
Project
|
|
Future Project |
9794 | 14812 | Evergreen Ave, Ohio Ave, Center Ave, & Willard Ave Reconstruction |
|
07/09/26 |
9792 | 16063 | 2026 Sports Courts Resurfacing |
|
Future Project |
9791 | 16290 | S Franklin Ave, Ridge St, Sylvan Ave Reconstruction |
|
07/09/26 |
9790 | 15525 | Glenway Backyard Pipe Burst |
|
05/14/26 |
9788 | 16257 | CIPP 2026 Woodvale Drive |
|
06/11/26 |
9787 | 15624 | Newville (Kenneth) Park Redevelopment |
|
08/27/26 |
9782 | 13016 | Far West Public Works Operations Building |
|
04/23/26 |
9780 | 15513 | CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026 |
|
05/21/26 |
9776 | 16122 | Overture Center Garage |
|
Future Project |
9775 | 15233 | Regent St Reconstruction |
|
04/23/26 |
9766 | 14880 | Metro Transit Kennedy Road On-Route Bus Charger |
|
Future Project |
9764 | 15956 | Normal Hall at Olin Park Rehabilitation |
|
Future Project |
9758 | 16158 | Milwaukee Street & Sprecher Road Traffic Signal |
|
Future Project |
9757 | 17085 | Imagination Center at Reindahl Park |
|
04/23/26 |
9756 | 16157 | Sherman Shabazz Public Improvements |
|
Future Project |
9753 | 15987 | Carver St, Martin St, Field St, & Floyd Pl Recon |
|
04/02/26 |
9751 | 16144 | 2026 Parking Garage Maintenance |
|
Future Project |
9745 | 15642 | Madison Municipal Building Flagpole Installation |
|
03/26/26 |
9740 | 10452 | Unit Well 12 Upgrade |
|
Future Project |
9738 | 13599 | Utility Materials Handling Site A/E |
|
Future Project |
9734 | 15961 | Valley Ridge Greenway Repair |
|
08/27/26 |
9733 | 15960 | Willows Biobasin Repair |
|
Future Project |
9732 | 15959 | Wexford Greenway Dredging |
|
07/09/26 |
9731 | 15958 | Memorial High School Greenway / Faircrest Cunnette Repair |
|
03/19/26 |
9730 | 15957 | Manitou Box Culvert Replacement - Phase 2 |
|
Future Project |
9729 | 15986 | Carver St, Martin St, Catlin Pl, Frazer Pl, & Dunn Pl Recon |
|
Future Project |
9728 | 15985 | Carver St, Martin St, Dickson Pl, Irwin Pl, & Dodge St Recon |
|
02/26/26 |
9726 | 15078 | Country Grove Singletrack Trail Improvements 2025 |
|
02/26/26 |
9718 | 15134 | Hoyt Park Lot Reconstruction |
|
Future Project |
9715 | 14626 | Lake Forest Lift Station |
|
03/19/26 |
9712 | 15452 | Yahara Hills Golf Course Well Transfer Pipe |
|
05/21/26 |
9709 | 15614 | Yahara Hills Golf Cart Paths |
|
10/30/25 |
9697 | 12730B | Monona Terrace Tunnel Lighting |
|
12/18/25 |
9694 | 15049 | Warner Park Pickleball Courts and Worthington Park Futsal Court |
|
Future Project |
9691 | 00100001 | First record-do not delete |
|
09/18/25 |
9687 | 15078 | Country Grove Singletrack Trail Improvements 2025 |
|
Future Project |
9682 | 12730 | Monona Terrace Tunnel Fan Replacement |
|
09/18/25 |
9681 | 67001 | Dairy Dr Campground Demo and Site Restoration |
|
09/18/25 |
9679 | 14601 | Olin Park Pedestrian Bridge Replacement |
|
Future Project |
9674 | 14940 | 346 E Lakeside |
|
Future Project |
9671 | 17044 | South District Police Station and Property & Evidence Storage Facility |
|
08/21/25 |
9670 | 15642 | Madison Municipal Building Flagpole Installation |
|
Future Project |
9668 | 14627 | Mayflower Lift Station |
|
Future Project |
9666 | 15703 | Breese Stevens Field - Athletic Field Replacement |
|
09/04/25 |
9659 | 14122 | Engineering Services Bldg Locker Rm Remodel |
|
09/04/25 |
9657 | 15697 | Stricker Pond Forebay Dredging |
|
Future Project |
9656 | 17040 | Fire Station 06 Remodel |
|
06/05/25 |
9655 | 15434 | Fire Station 8 Lighting Retrofit |
|
06/20/25 |
9654 | 15699 | CIPP Thermal Lining Rehabilitation of Sewers Phase 1 - 2025 |
|
07/24/25 |
9653 | 15623 | Playground Improvements for Kennedy, Ontario and Portland Parks |
|
07/24/25 |
9653 | 15635 | Playground Improvements for Kennedy, Ontario and Portland Parks |
|
07/24/25 |
9653 | 15636 | Playground Improvements for Kennedy, Ontario and Portland Parks |
|
05/22/25 |
9651 | 10069 | Madison Public Market |
|
04/17/25 |
9648 | 8214556X | 2020 Parking Garage Maintenance |
|
Future Project |
9647 | 14625 | Badger Lane Lift Station Replacement |
|
04/17/25 |
9646 | 15055 | 2025 Sport Court Resurfacings |
|
04/17/25 |
9642 | 14015 | RENNEBOHM PARK EAST TENNIS COURTS 2025 |
|
07/24/25 |
9638 | 15078 | Country Grove Singletrack Trail Improvements 2025 |
|
04/03/25 |
9633 | 15612 | CIPP 2025 Churchill Dr |
|
03/27/25 |
9627 | 14431 | South Madison Demolitions and Site Restorations |
|
03/27/25 |
9627 | 15223 | South Madison Demolitions and Site Restorations |
|
06/20/25 |
9626 | 15387 | Mid Town Hydraulic Improvements |
|
02/13/25 |
9621 | 45300 | Semi Permanent Epoxy Pavement Marking |
|
03/27/25 |
9617 | 15527 | Solar PV - Water Utility Olin Ave |
|
01/30/25 |
9616 | 14624 | Truax Apartments PV - Roofing Alterations |
|
03/19/26 |
9613 | 15513 | CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026 |
|
06/20/25 |
9612 | 15512 | CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2025 |
|
04/03/25 |
9610 | 17085 | Imagination Center at Reindahl Park |
|
05/21/26 |
9606 | 11230 | Metro Transit Phase 3 |
|
11/14/24 |
9605 | 14915 | Prairie Hills Detention Basin Improvements |
|
04/02/26 |
9593 | 15165 | Pressure Zone 4 Interstate Crossing |
|
05/22/25 |
9591 | 15271 | Capital City Trail Storm Sewer |
|
Future Project |
9590 | 14717 | Warner Lagoon Dredging |
|
Future Project |
9589 | 15427 | Northeast Regional Pond Repair |
|
07/09/26 |
9588 | 15426 | West Badger Mill Creek Greenway Improvements |
|
08/27/26 |
9587 | 15425 | Attic Angels Greenway Repairs |
|
12/17/26 |
9585 | 13863 | Castle Creek Channel Improvements at Warner Park |
|
Future Project |
9584 | 15356 | MMSD Drying Beds |
|
01/16/25 |
9583 | 14514 | CCB Remodel - DCR 104&108A |
|
10/17/24 |
9582 | 13065 | LED Street Light - Federally Funded |
|
11/07/24 |
9572 | 15429 | N Lake Street Boat Ramp |
|
08/29/24 |
9561 | 15332 | Paterson Street Sanitary Sewer Assessment District - 2024 |
|
02/13/25 |
9551 | 15145 | Rennebohm Park Sprayground |
|
01/16/25 |
9550 | 15148 | Yahara Hills Golf Course Pump House and Irrigation Improvement |
|
Future Project |
9549 | 15342 | Bikeways 2025 |
|
01/30/25 |
9547 | 15327 | East Madison Bikeways: Safe St |
|
07/11/24 |
9546 | 15215 | MWU Olin Ave. Admin Bldg Roof Replacement |
|
08/29/24 |
9536 | 15295 | CIPP Lining Rehabilitation - Blair Street Sanitary Sewer Siphon |
|
11/21/24 |
9535 | 15294 | CIPP UV Lining Ph2 2024 |
|
12/18/25 |
9532 | 13160 | Library Service + Support - Siding Replacement |
|
02/13/25 |
9529 | 14598 | 2024 Park Sun Shelter Installation |
|
06/13/24 |
9527 | 15215 | MWU Olin Ave. Admin Bldg Roof Replacement |
|
04/25/24 |
9526 | 14015A | 2024 Rennebohm Park East Tennis Courts |
|
04/25/24 |
9525 | 15055 | 2025 Sport Court Resurfacings |
|
06/13/24 |
9522 | 13573 | 20 is Plenty |
|
06/27/24 |
9521 | 15109 | 2024 Playground Improvements |
|
11/14/24 |
9517 | 14370 | Pheasant Branch Greenway Enhancement |
|
Future Project |
9510 | 14074 | BPS 213 Booster Upgrade |
|
04/04/24 |
9509 | 15055 | 2025 Sport Court Resurfacings |
|
04/04/24 |
9508 | 15102 | CIPP 2024 Water Main Rehabilitation |
|
04/04/24 |
9506 | 14595 | Warner Park Dog Park Lot Resurfacing |
|
02/08/24 |
9503 | 14933 | Sycamore Singletrack Trail Improvements 2024 |
|
06/27/24 |
9502 | 17196 | Warner Park Community & Recreation Center Expansion |
|
04/04/24 |
9501 | 15045 | Lake Street Sanitary Sewer Replacement - 2024 |
|
04/04/24 |
9500 | 14015A | 2024 Rennebohm Park East Tennis Courts |
|
04/25/24 |
9497 | 14121A | Streets West Facility HVAC and Lighting Upgrade |
|
02/08/24 |
9495 | 45300 | Semi Permanent Epoxy Pavement Marking |
|
03/21/24 |
9493 | 82145D | Parking Garage Maintenance |
|
04/23/26 |
9490 | 14922 | Fordem Avenue - First Street Relief Sanitary Sewer |
|
07/18/24 |
9489 | 14920 | 3400 BLK E Washington Sewer Repl |
|
05/09/24 |
9487 | 14923 | CIPP UV LINING REHABILITATION OF SEWERS PHASE 1 – 2024 |
|
08/29/24 |
9486 | 14921 | Commercial Avenue Sanitary Sewer Reconstruction |
|
03/07/24 |
9485 | 14525 | Rennebohm Park Shelter Restroom Renovation |
|
08/05/21 |
9478 | 13724 | Westview Hills Channel |
|
03/04/21 |
9446 | 54250 | 2021 Tennis and Basketball Court |
|
03/04/21 |
9440 | 13363 | CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021 |
|
06/08/23 |
9439 | 12882 | Mendota Grassman Greenway |
|
Future Project |
9438 | 12568 | Old Sauk Trails Business Park - Phase 1 |
|
01/26/23 |
9437 | 11066 | East Towne Pond |
|
Future Project |
9436 | 11737 | Old Sauk Trails Business Park - Ph 2 |
|
Future Project |
9435 | 12146 | Mendota-Spring Harbor Greenway |
|
08/25/22 |
9433 | 12916 | Spring Harbor Dredging |
|
10/20/22 |
9432 | 11704 | Hawks Landing Flood Mitigation North |
|
01/06/22 |
9430 | 12960 | Sprecher Road Greenway Improvements |
|
02/18/21 |
9429 | 13371 | Mall/Concourse Maintenance Protective Flooring Replacement |
|
03/05/20 |
9428 | 12774 | Warner Lagoon Pier and Ice Access |
|
11/07/19 |
9426 | 12710 | CIPP Rehab of Sanitary and Storm Sewer Mains - 2019 |
|
06/20/19 |
9415 | 19033 | 2019 Glacier Hill Park Sun Shelter Installation |
|
04/25/19 |
9414 | 17525 | 2019 Playground Replacements |
|
04/25/19 |
9412 | 11842 | West Elderberry Sanitary Sewer Interceptor - 2019 |
|
05/23/19 |
9411 | 12011 | McKenna Boulevard Flood Mitigation |
|
Future Project |
9410 | 16122 | Overture Center Garage |
|
05/16/19 |
9404 | 17390 | Reindahl Park Barn Improvements |
|
05/09/19 |
9403 | 19021 | Park Paving 2019 |
|
05/09/19 |
9400 | 17451 | Fire Station 14 (2018) & Fire Station 14 Training Tower (2019) |
|
05/23/19 |
9398 | 17526 | 2019 Playground Replacements - Group 2 |
|
07/25/19 |
9397 | 11021 | Truck Scales Project |
|
12/21/23 |
9390 | 14980 | Lower Badger Mill Creek Pond Restoration |
|
01/11/24 |
9389 | 14933 | Sycamore Singletrack Trail Improvements 2024 |
|
11/09/23 |
9377 | 11168 | University Avenue Reconstruction |
|
Future Project |
9374 | 14917 | West Badger Mill Creek - Elver Park Greenway |
|
Future Project |
9373 | 14914 | Stormwater Quality Screen Structures |
|
09/21/23 |
9365 | 14369 | Railroad Arch Culvert Repair at Southwest Path |
|
03/21/24 |
9362 | 13810 | Ohmeda Drive Assessment District - 2022 |
|
11/09/23 |
9361 | 14145 | State Street Campus Garage Replacement |
|
03/21/24 |
9359 | 13937 | Country Grove Park Shelter |
|
05/23/24 |
9358 | 13346 | Bartillon Homeless Shelter |
|
09/07/23 |
9357 | 14156 | IT Fiber Install 2023 |
|
08/10/23 |
9346 | 8214556C | 2023 Parking Garage Maintenance |
|
02/08/24 |
9342 | 14092 | Well 15 PFAS Treatment Facility |
|
09/21/23 |
9336 | 14413 | 229 Felland Road Booster Pump Install |
|
08/10/23 |
9335 | 14487 | CIPP UV Lining Phase 2 |
|
11/09/23 |
9334 | 14412 B | Robin Greenway Restoration |
|
07/13/23 |
9333 | 14412 A | Robin Greenway Storm and Grading |
|
01/11/24 |
9329 | 14203 | Fire Station #14 Training Site Phase 1 |
|
06/08/23 |
9327 | 13930 | Penn Park Courts Reconstruction |
|
06/22/23 |
9326 | 14334 | Door Creek Park Shelter |
|
08/24/23 |
9322 | 14530 | Fire Station 2 Lighting Retrofit |
|
05/04/23 |
9320 | 14245 | Fire Station 4 Lighting Retrofit |
|
05/25/23 |
9319 | 14643 | CIPP Water Main Rehab 2023 - Fish Hatchery Road |
|
05/25/23 |
9319 | 14659 | CIPP Water Main Rehab 2023 - Lake Mendota Drive |
|
03/13/25 |
9318 | 14023 | Waste Drop Off Site at Streets Transfer Station |
|
05/25/23 |
9317 | 8214556C | 2023 Parking Garage Maintenance |
|
Future Project |
9314 | 14121 | Streets East Wash Bay Steel Column and Panel Repairs |
|
04/20/23 |
9313 | 12728 | Madison Senior Center Courtyard |
|
04/20/23 |
9312 | 12457 | Truax Lift Station Replacement - 2021 |
|
04/20/23 |
9306 | 13930 | Penn Park Courts Reconstruction |
|
11/09/23 |
9304 | 14439 | Northport Drive & School Road |
|
03/09/23 |
9299 | 45300 | Semi Permanent Epoxy Pavement Marking |
|
05/04/23 |
9298 | 14537 | 2023 West Parks Playground Replacements |
|
07/06/23 |
9297 | 12410 | Madison Public Library Lighting (various locations) |
|
12/14/23 |
9289 | 10448 | Unit Well 19 Treatment System Addition |
|
03/09/23 |
9286 | 14486 | CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023 |
|
03/09/23 |
9285 | 14485 | CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023 |
|
02/09/23 |
9280 | 14246 | Fire Station 10 Lighting Retrofit |
|
02/23/23 |
9279 | 13934 | 2023 Inclusive Playgrounds |
|
02/23/23 |
9270 | 13930 | Penn Park Courts Reconstruction |
|
02/09/23 |
9269 | 13432 | 2023 Sport Court Resurfacings |
|
12/22/22 |
9262 | 14320 | CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021 (Rebid) |
|
03/09/23 |
9249 | 12728 | Madison Senior Center Courtyard |
|
09/24/26 |
9246 | 13860 | West Towne Pond Improvements |
|
04/20/23 |
9245 | 14334 | Door Creek Park Shelter |
|
12/01/22 |
9244 | 16122 | Overture Center Garage |
|
01/26/23 |
9243 | 45300 | Semi Permanent Epoxy Pavement Marking |
|
04/06/23 |
9240 | 14245 | Fire Station 4 Lighting Retrofit |
|
08/15/24 |
9238 | 14374 | Burr Jones Shoreline Repair |
|
09/07/23 |
9235 | 14369 | Railroad Arch Culvert Repair at Southwest Path |
|
08/15/24 |
9234 | 14368 | Schroeder Rd Flood Mitigation |
|
Future Project |
9233 | 14367 | Westside Impact Fee District |
|
12/01/22 |
9230 | 14246 | Fire Station 10 Lighting Retrofit |
|
09/29/22 |
9228 | 14027 | Replacement of booster pumps and associated piping/appurtenances at Unit Wells 12 & 26 |
|
04/06/23 |
9226 | 12393 | Phase 2 of CCB City Office Remodels, First and Fifth Floors |
|
08/04/22 |
9210 | 14296 | Mineral Point Landfill 2022 Gas Construction |
|
08/25/22 |
9209 | 14320 | CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021 (Rebid) |
|
08/25/22 |
9201 | 13710 | O.B. Sherry Park - 3457/3461/3465 Milwaukee St. Demolition and Site Restoration |
|
08/25/22 |
9200 | 13939 | Replacement of booster pumps and associated piping/appurtenances at Unit Wells 12 & 26 |
|
08/25/22 |
9200 | 14027 | Replacement of booster pumps and associated piping/appurtenances at Unit Wells 12 & 26 |
|
Future Project |
9198 | 14273 | Solar PV – Fire Station 01 |
|
Future Project |
9197 | 14274 | Solar PV – Fire Station 08 |
|
Future Project |
9196 | 14275 | Solar PV – Streets South Point Warm Storage |
|
08/25/22 |
9195 | 13716 | Bridge Repairs 2022/2023-Painting Alicia Ashman Ped Bridge |
|
06/09/22 |
9188 | 13935 | 2022 Warner Park Inclusive Playground |
|
07/07/22 |
9179 | 14015 | RENNEBOHM PARK EAST TENNIS COURTS 2025 |
|
04/28/22 |
9178 | 13836B | Solar PV – Fire Station 02 |
|
08/04/22 |
9176 | 16122 | Overture Center Garage |
|
08/15/24 |
9174 | 10525 | McPike Park (formerly Central Park) |
|
05/26/22 |
9173 | 14093 | 2022 CIPP Water Main Rehab Lake Mendota Dr |
|
04/14/22 |
9172 | 13934 | 2023 Inclusive Playgrounds |
|
05/12/22 |
9169 | 14073 | Median Conversion - Concrete 2022 |
|
04/28/22 |
9168 | 8214556B | 2022 Parking Garage Maintenance |
|
09/29/22 |
9162 | 13836C | Solar PV – Water Utility Paterson Vehicle Storage |
|
04/07/22 |
9161 | 13836B | Solar PV – Fire Station 02 |
|
08/04/22 |
9160 | 14270 | Solar PV - Streets Waste Transfer Station |
|
03/24/22 |
9159 | 13369 | Senior Center Lighting Replacement |
|
04/14/22 |
9151 | 13931 | Cannonball Single Track Trail Improvements 2022 |
|
Future Project |
9149 | 13862 | Atwood Avenue Flood Mitigation |
|
Future Project |
9147 | 13879 | Regent and Kenosha Culvert Replacement |
|
03/03/22 |
9146 | 13836 | Green Power 2022-Solar Installations |
|
03/24/22 |
9138 | 13934 | 2023 Inclusive Playgrounds |
|
01/20/22 |
9136 | 10950 | Metro Transit Hanson Rd Satellite Bus Facility Remodel |
|
Future Project |
9135 | 11078 | Fairchild Building HVAC Upgrade and Structural Repair |
|
01/20/22 |
9131 | 16126 | State Street Capitol Garage Relighting and Electrical Controls and Upgrade |
|
02/03/22 |
9127 | 13357 | Tenney Park East Johnson St. Pedestrian Bridge Wing Walls |
|
04/28/22 |
9125 | 14099 | MPD East Fence |
|
02/03/22 |
9118 | 13895 | 2022 Sport Court Resurfacings |
|
Future Project |
9115 | 11596 | NE NEIGHBORHOOD SANITARY IMPACT FEE |
|
10/05/23 |
9108 | 13872 | Parkside Drive Sanitary Sewer Replacement |
|
08/04/22 |
9107 | 13871 | CIPP Sewer Lining 2022 |
|
Future Project |
9106 | 13870 | Capitol City Trail Bike Roundabout |
|
Future Project |
9105 | 13867 | Pumpkin Hollow Sanitary Sewer Impact Fee District |
|
Future Project |
9104 | 11942 | Arbor Hill Greenway Screen Structure |
|
05/12/22 |
9103 | 13800 | Worthington Avenue Sanitary Replacement |
|
05/12/22 |
9102 | 11850 | 1622 Fordem Avenue Sanitary Sewer Replacement |
|
12/16/21 |
9087 | 10950 | Metro Transit Hanson Rd Satellite Bus Facility Remodel |
|
10/26/23 |
9086 | 10950 | Metro Transit Hanson Rd Satellite Bus Facility Remodel |
|
10/07/21 |
9079 | 12410 F | Madison Public Library Lighting - Sequoya |
|
09/23/21 |
9063 | 11672 | Thurber Lift Station Replacement |
|
08/05/21 |
9057 | 13566 | CIPP 2021 - E. Johnson St |
|
08/05/21 |
9056 | 13565 | CIPP 2021 - Pontiac Trl, Nokomis Ct, Rosewood Cir |
|
08/05/21 |
9055 | 13474 | Summit Maintenance Facility Improvements 2021 |
|
09/09/21 |
9050 | 12856 | Olin Park Facility Improvements |
|
06/24/21 |
9042 | 13132 | Madison Fire Station 05 Wall Removal & Improvements |
|
06/03/21 |
9039 | 13453 | Park Paving 2021 |
|
07/08/21 |
9035 | 13491 | Greentree Hills Landfill West Header Replacement |
|
06/03/21 |
9026 | 13451 | 2021 Playground Improvements |
|
03/18/21 |
9014 | 13265 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2021 |
|
01/21/21 |
9007 | 12410 | Madison Public Library Lighting (various locations) |
|
01/21/21 |
9006 | 13217 | Well 18 Treatment |
|
05/20/21 |
9004 | 13279 | Fire Station 10 - Retaining Wall |
|
12/17/20 |
8997 | 13217 | Well 18 Treatment |
|
12/17/20 |
8996 | 13307 | Heim Building HVAC Replacement |
|
04/15/21 |
8992 | 13267 | Sidewalk, Curb&Gutter, Citywide Installation and Repair 2021 |
|
03/11/21 |
8991 | 13265 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2021 |
|
02/18/21 |
8990 | 13253 | Resurfacing 2021 |
|
02/18/21 |
8989 | 13253 | Resurfacing 2021 |
|
02/25/21 |
8988 | 13253 | Resurfacing 2021 |
|
03/11/21 |
8987 | 13221 | Sidewalk Program 2021, Ald. District 14 |
|
03/18/21 |
8986 | 13220 | Sidewalk Program 2021, Ald. District 13 |
|
11/19/20 |
8985 | 12675 | Street End Repairs - (FEMA 81336) |
|
02/18/21 |
8984 | 11229 | Metro Transit E. Wash Upgrades |
|
05/27/21 |
8981 | 11230 | Metro Transit Phase 3 |
|
12/17/20 |
8961 | 12410 | Madison Public Library Lighting (various locations) |
|
03/04/21 |
8960 | 12410 B | Madison Public Library Lighting - Alicia Ashman |
|
06/25/20 |
8930 | 12371 | Traffic Median Revegetation Trial Project |
|
07/23/20 |
8922 | 10525 | McPike Park (formerly Central Park) |
|
06/25/20 |
8920 | 12999 | Allis/Spaanem/Shaffer Water Main |
|
09/24/20 |
8916 | 12890 | Gates of Heaven Exterior Restoration |
|
05/28/20 |
8913 | 12371 | Traffic Median Revegetation Trial Project |
|
05/07/20 |
8907 | 12315 | Orchard Street Sanitary Sewer Repair |
|
07/02/20 |
8904 | 12679 | 2020 Playground Improvements - Group 3 |
|
04/30/20 |
8901 | 12687 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2020 |
|
11/05/20 |
8899 | 12851 | 2020 Galaxy Park Sun Shelter Installation |
|
06/25/20 |
8898 | 12661 | UW 26 Booster Pump Upgrade |
|
05/21/20 |
8893 | 17473 | Gates of Heaven |
|
06/25/20 |
8891 | 11021 | Truck Scales Project |
|
04/23/20 |
8885 | 8214556X | 2020 Parking Garage Maintenance |
|
04/09/20 |
8882 | 12881 | Olbrich Roof Replacements |
|
08/06/20 |
8879 | 12857 | Tenney Park Pavilion Acoustic Plaster Ceiling |
|
06/10/21 |
8878 | 11672 | Thurber Lift Station Replacement |
|
04/09/20 |
8877 | 12315 | Orchard Street Sanitary Sewer Repair |
|
07/13/23 |
8876 | 12750 | Wexford Pond Dredging |
|
03/09/23 |
8875 | 11063 | Lower Badger Mill Creek Pond |
|
09/08/22 |
8873 | 12457 | Truax Lift Station Replacement - 2021 |
|
01/28/27 |
8872 | 11730 | SAUK CREEK GREENWAY |
|
08/20/20 |
8871 | 10956 | MPD Central Property/GR 10 Carpet Replacement |
|
09/24/20 |
8870 | 12755 | CIPP Rehab 2020 |
|
09/23/21 |
8868 | 12456 | Harper Lift Station Replacement |
|
Future Project |
8866 | 12749 | Yahara River Parkway Screen Structure |
|
05/28/20 |
8864 | 12989 | E. Gorham Street Resurfacing: Utilities |
|
Future Project |
8863 | 11596 | NE NEIGHBORHOOD SANITARY IMPACT FEE |
|
09/03/20 |
8861 | 13195 | GLENWOOD CHILDRENS PARK STORM 2020 |
|
04/07/22 |
8860 | 12869 | FEMA Shoreline Repairs - 2022 |
|
Future Project |
8859 | 12154 | Spring Harbor Outfall Repair |
|
05/21/20 |
8858 | 12327 | Felland Road Water Main Extension Phase 1 |
|
04/09/20 |
8853 | 12827 | Park Paving 2020 |
|
07/09/20 |
8850 | 11971 | WARNER PARK BEACH SHELTER |
|
04/23/20 |
8849 | 12676 | 2020 Playgrounds - Group 1 |
|
03/19/26 |
8845 | 14490 | Campus Drive at Bacock Drive Railroad Crossing Improvements |
|
06/25/26 |
8844 | 15752 | 2026 Safe Streets |
|
Future Project |
8842 | 15723 | West Washington Path Crossing |
|
11/20/25 |
8841 | 15905 | 114 E Wilson Site Restoration |
|
05/07/26 |
8838 | 15929 | Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor |
|
05/07/26 |
8837 | 15929 | Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor |
|
05/07/26 |
8836 | 15929 | Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor |
|
05/07/26 |
8835 | 15929 | Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor |
|
05/21/26 |
8834 | 15930 | 2026 Resurfacing |
|
Future Project |
8833 | 15930 | 2026 Resurfacing |
|
05/07/26 |
8832 | 15930 | 2026 Resurfacing |
|
05/21/26 |
8830 | 15791 | Bridge Repairs - 2026 |
|
06/11/26 |
8829 | 15928 | Citywide SW |
|
04/23/26 |
8828 | 15927 | Sawcutting Dist 2 & 6 |
|
04/23/26 |
8827 | 15927 | Sawcutting Dist 2 & 6 |
|
04/23/26 |
8826 | 15926 | Sidewalk Dist 6 |
|
04/23/26 |
8825 | 15925 | Sidewalk Dist 2 |
|
04/23/26 |
8825 | 15926 | Sidewalk Dist 6 |
|
10/08/26 |
8824 | 15675 | Bikeways 2026 |
|
09/10/26 |
8823 | 15825 | Parman Ter Constr. |
|
10/08/26 |
8822 | 15821 | Dondee Rd |
|
Future Project |
8821 | 15824 | Norman Way, Wood Cir Recon |
|
Future Project |
8820 | 15121 | Euclid Ave, Birch Ave Recon |
|
11/05/26 |
8819 | 15823 | Milwaukee St Recon |
|
Future Project |
8818 | 15854 | Capital Ave Recon |
|
11/05/26 |
8817 | 15119 | Birge Ter Recon |
|
07/30/26 |
8816 | 11191 | Sherman Ave & McGuire St Recon |
|
04/30/26 |
8815 | 15827 | Virgina Ter, Norwood Pl Construction |
|
04/23/26 |
8813 | 15820 | Elmside Blvd, Sommers Ave, & Center Ave Recon |
|
03/13/25 |
8811 | 15234 | Bridge Repair 2025 |
|
03/19/26 |
8810 | 15516 | Midvale Blvd Resurf |
|
02/12/26 |
8809 | 15486 | South Charter St Alley Recon |
|
Future Project |
8808 | 15416 | 2025 Resurfacing |
|
05/08/25 |
8807 | 15416 | 2025 Resurfacing |
|
08/07/25 |
8806 | 15123 | Buffalo Trail, Barron Court, Green Lake Pass Resurfacing w/Utilities |
|
09/18/25 |
8801 | 14782 | Troy Drive/Green Ave Resurfacing |
|
03/20/25 |
8800 | 15200 | 2025 Safe Streets |
|
06/25/26 |
8799 | 15417 | Sugar Maple Ln Recon |
|
05/08/25 |
8798 | 15416 | 2025 Resurfacing |
|
03/20/25 |
8797 | 15415 | Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor |
|
03/20/25 |
8796 | 15415 | Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor |
|
03/27/25 |
8795 | 15415 | Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor |
|
03/27/25 |
8794 | 15415 | Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor |
|
05/08/25 |
8792 | 15379 | Citywide SW |
|
02/27/25 |
8791 | 15378 | Sawcutting Dist 10 & 20 |
|
02/13/25 |
8790 | 15378 | Sawcutting Dist 10 & 20 |
|
02/13/25 |
8789 | 15377 | Sidewalk Dist 20 |
|
02/27/25 |
8788 | 15376 | Sidewalk Dist 10 |
|
11/05/26 |
8787 | 14987 | W Mifflin St Plaza Recon |
|
03/19/26 |
8786 | 15120 | MacArthur Rd, MacArthur Ct, Larson Ct, Sycamore Ave Recon |
|
07/03/25 |
8785 | 15219 | Meyer Ave Recon |
|
06/25/25 |
8784 | 15125 | E Main St, Hancock St Resurf |
|
04/17/25 |
8783 | 11822 | Shawnee Pass Recon, Nakoma Rd Sidewalk |
|
06/11/26 |
8782 | 14481 | Davidson St, Park Ct, Maher Ave, Gary St Recon |
|
03/27/25 |
8781 | 11825 | Evergreen Ave, Ohio Ave, Sommers Ave Recon |
|
09/26/24 |
8770 | 10169 | West Towne Path Ph 2a |
|
01/30/25 |
8769 | 15104 | North Shore Dr Path |
|
08/29/24 |
8767 | 14334 | Door Creek Park Shelter |
|
02/13/25 |
8766 | 15113 | Franklin St Resurfacing w/Utilities |
|
07/03/25 |
8763 | 14143 | Badger Rusk Shared-Use Path |
|
11/30/23 |
8762 | 13924 | Hammersley Road Resurfacing w/Utilities Phase 2 |
|
Future Project |
8761 | 11168 | University Avenue Reconstruction |
|
11/21/24 |
8759 | 14780 | Starker Ave Resurfacing w/Utilities |
|
04/04/24 |
8758 | 14817 | Sidewalk, Curb & Gutter, Citywide Installation & Repair 2024 |
|
03/27/25 |
8757 | 14890 | Bartillon Path |
|
02/22/24 |
8756 | 14818 | 2024 Sidewalk Sawcutting |
|
02/08/24 |
8755 | 14818 | 2024 Sidewalk Sawcutting |
|
02/08/24 |
8754 | 14816 | Sidewalk Ordered 2024 Ald Dist 19 |
|
03/21/24 |
8753 | 14815 | Sidewalk Ordered 2024 Ald Dist 11 |
|
04/04/24 |
8752 | 14814 | Pavement Crack Repair & Chip Seal 2024 |
|
04/04/24 |
8751 | 14814 | Pavement Crack Repair & Chip Seal 2024 |
|
04/04/24 |
8750 | 14814 | Pavement Crack Repair & Chip Seal 2024 |
|
Future Project |
8749 | 14814 | Pavement Crack Repair & Chip Seal 2024 |
|
Future Project |
8748 | 14813 | Bridge Repair 2024 |
|
05/21/26 |
8747 | 14781 | Pflaum Rd Resurfacing w/Utilities |
|
03/28/24 |
8746 | 14389 | W. Washington Ave & S. Henry Resurfacing w/utilities |
|
05/23/24 |
8745 | 14764 | Stevens St Resurfacing w/ Utilities |
|
06/27/24 |
8744 | 14763 | Atticus Way |
|
02/22/24 |
8743 | 14083 | Lake Mendota Dr and Norman Way Reconstruction |
|
07/18/24 |
8742 | 14076 | Rutledge Street Reconstruction |
|
Future Project |
8741 | 14812 | Evergreen Ave, Ohio Ave, Center Ave, & Willard Ave Reconstruction |
|
05/09/24 |
8740 | 14762 | Hermina St/Union St Reconstruction |
|
07/24/25 |
8739 | 14761 | Tancho Dr Bike Path |
|
07/24/25 |
8739 | 15427 | Northeast Regional Pond Repair |
|
03/07/24 |
8738 | 14896 | 2024 Resurfacing |
|
03/07/24 |
8737 | 14896 | 2024 Resurfacing |
|
03/07/24 |
8736 | 14896 | 2024 Resurfacing |
|
04/04/24 |
8735 | 11543 | E. Wilson/E. Doty Street Reconstruction |
|
12/18/25 |
8733 | 14636 | Hawthorne Court Reconstruction |
|
12/18/25 |
8733 | 15938 | North Lake Street/West Dayton Street Resurfacing |
|
06/08/23 |
8732 | 14346 | Pavement Crack Repair and Chip Seal 2023 |
|
06/08/23 |
8731 | 14346 | Pavement Crack Repair and Chip Seal 2023 |
|
06/22/23 |
8728 | 14156 | IT Fiber Install 2023 |
|
03/09/23 |
8727 | 13716 | Bridge Repairs 2022/2023-Painting Alicia Ashman Ped Bridge |
|
04/20/23 |
8721 | 13015 | W. Main Street Bike Boulevard Improvements |
|
12/01/22 |
8720 | 12434 | Senior Center First Floor Folding Partition Installation |
|
Future Project |
8719 | 14388 | New Sidewalk/Path Installation 2023 |
|
02/08/24 |
8717 | 12777B | Mineral Point Road Widen Sidewalk (for East-West Bus Rapid Transit) |
|
12/15/22 |
8716 | 13925 | East-West Bus Rapid Transit Improvements |
|
02/23/23 |
8715 | 14082 | Lake Mendota Drive Reconstruction |
|
03/09/23 |
8713 | 14337 | Sidewalk sawcutting 2023 |
|
03/28/24 |
8712 | 14078 | Lowell Street Reconstruction |
|
11/30/23 |
8711 | 14081 | Harvey St & Schmitt Pl Reconstruction |
|
09/21/23 |
8710 | 14080 | S. Owen Drive Reconstruction |
|
05/23/24 |
8709 | 14079 | Doncaster Dr, Beverly Rd, Danbury St Reconstruction |
|
06/25/26 |
8708 | 13664 | Hermina St: Ped Bike Bridge over Starkweather Creek |
|
06/08/23 |
8707 | 11860 a | John Nolen Bridge Repairs - 2023 |
|
02/23/23 |
8706 | 14349 | Sidewalk Ordered 2023 AD 18 |
|
03/09/23 |
8705 | 14348 | Sidewalk Ordered 2023 AD 12 |
|
02/23/23 |
8704 | 14347 | Resurfacing 2023 |
|
02/23/23 |
8703 | 14347 | Resurfacing 2023 |
|
02/23/23 |
8702 | 14347 | Resurfacing 2023 |
|
03/09/23 |
8701 | 14346 | Pavement Crack Repair and Chip Seal 2023 |
|
03/09/23 |
8700 | 14346 | Pavement Crack Repair and Chip Seal 2023 |
|
03/09/23 |
8699 | 14346 | Pavement Crack Repair and Chip Seal 2023 |
|
03/09/23 |
8698 | 14346 | Pavement Crack Repair and Chip Seal 2023 |
|
02/23/23 |
8697 | 14337 | Sidewalk sawcutting 2023 |
|
02/08/24 |
8696 | 14336 | Bikeways 2023 |
|
04/11/24 |
8695 | 14199 | Safe Streets Madison 2024 |
|
12/01/22 |
8694 | 14216 | S. Pinckney Street Resurfacing w/Storm |
|
12/14/23 |
8693 | 14215 | Sheboygan Ave & N. Segoe Rd Resurfacing w/Utilities |
|
01/26/23 |
8692 | 14335 | Felland Road Reconstruction |
|
09/15/22 |
8691 | 12777A | East-West Bus Rapid Transit Early Works Improvements |
|
05/12/22 |
8690 | 13716 | Bridge Repairs 2022/2023-Painting Alicia Ashman Ped Bridge |
|
04/07/22 |
8689 | 13719 | Pavement Crack Repair and Chip Seal 2022 |
|
04/07/22 |
8688 | 13719 | Pavement Crack Repair and Chip Seal 2022 |
|
04/07/22 |
8687 | 13719 | Pavement Crack Repair and Chip Seal 2022 |
|
07/13/23 |
8659 | 14075 | Willard/Sommers/Center/Hudson/Miller Reconstruction |
|
08/04/22 |
8658 | 13715 | Bikeways 2022(2023 construction) |
|
07/07/22 |
8657 | 13923 | Safe Streets Madison 2022 |
|
07/07/22 |
8655 | 13480 | W. Washington Ave & Henry St Intersection Improvement |
|
08/25/22 |
8654 | 44001 | West Badger Rd. Salt Barn |
|
10/20/22 |
8653 | 13617 | Olin Avenue Waste Transfer Station Concrete floor replacement |
|
Future Project |
8651 | 13923 | Safe Streets Madison 2022 |
|
03/17/22 |
8650 | 13175 | Old Middleton Rd & Craig Ave Resurfacing w/Utilties |
|
Future Project |
8648 | 14023 | Waste Drop Off Site at Streets Transfer Station |
|
06/09/22 |
8647 | 13480 | W. Washington Ave & Henry St Intersection Improvement |
|
07/07/22 |
8644 | 13715 | Bikeways 2022(2023 construction) |
|
06/23/22 |
8643 | 13923 | Safe Streets Madison 2022 |
|
04/06/23 |
8642 | 13014 | West Towne Path - Phase 3 |
|
01/26/23 |
8641 | 13169 | Braxton Pl Resurfacing & La Mariposa Lane(new street) |
|
Future Project |
8640 | 11959 | Old Middleton Road Underpass of WSOR Railroad |
|
04/07/22 |
8636 | 13719 | Pavement Crack Repair and Chip Seal 2022 |
|
06/13/24 |
8635 | 13812 | Knutson Drive Reconstruction |
|
04/07/22 |
8634 | 13721 | Sidewalk, Curb&Gutter, Citywide Installation and Repair 2022 |
|
03/03/22 |
8633 | 13717 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2022 |
|
03/03/22 |
8632 | 13720 | Sidewalk Program 2022, Ald. District 5 |
|
07/11/24 |
8626 | 13713 | Olin-Turville Ct and E. Lakeside St Resurfacing w/Utilities |
|
07/11/24 |
8626 | 15269 | OLIN-TURVILLE RECONSTRUCT |
|
07/07/22 |
8625 | 13709 | Lake Mendota Dr & Capital Ave Reconstruction |
|
05/12/22 |
8624 | 13708 | Russell Street Reconstruction |
|
06/09/22 |
8623 | 13707 | Tokay Boulevard Resurfacing w/Utilities |
|
03/24/22 |
8622 | 13706 | S. Owen, Caromar, Keating Resurfacing w/Utilities |
|
09/08/22 |
8621 | 13705 | Hammersley Road Resurfacing w/Utilities Phase 1 |
|
Future Project |
8620 | 13704 | Anderson Street Resurfacing w/Utilities |
|
03/03/22 |
8619 | 13703 | Resurfacing 2022 |
|
03/03/22 |
8618 | 13703 | Resurfacing 2022 |
|
03/03/22 |
8617 | 13703 | Resurfacing 2022 |
|
02/17/22 |
8616 | 12907 | St. Paul, Ohio, Talmadge,Jackson and LaFollette Reconstruction |
|
08/05/21 |
8615 | 13418 | Aberg Avenue & NB Packers Avenue Ramp traffic signal |
|
07/08/21 |
8614 | 13264 | Local Road Traffic Calming & Arterial Ped Enhancements 2021 |
|
05/20/21 |
8613 | 11021 A | Sycamore Park Parking Lot Repavement |
|
09/09/21 |
8609 | 13342 | Madison Police Training Center Office Roof Replacement |
|
12/16/21 |
8606 | 12444 | South Point Rd. Truck Scale and Fuel Point |
|
06/09/22 |
8605 | 44001 | West Badger Rd. Salt Barn |
|
06/03/21 |
8604 | 12410 F | Madison Public Library Lighting - Sequoya |
|
Future Project |
8603 | 12410 E | Madison Public Library Lighting - Goodman South Madison |
|
Future Project |
8602 | 13370 | Streets West Badger Lighting |
|
02/17/22 |
8601 | 13369 | Senior Center Lighting Replacement |
|
05/20/21 |
8600 | 12410 D | Madison Public Library Lighting - Meadowridge |
|
04/08/21 |
8599 | 12410 C | Madison Public Library Lighting - Lakeview |
|
05/12/22 |
8598 | 17040 | Fire Station 06 Remodel |
|
09/14/23 |
8595 | 10069 | Madison Public Market |
|
02/17/22 |
8592 | 13258 | Engineering Operations Facility - Canopy Replacment/Expansion |
|
04/08/21 |
8591 | 8214556A | 2021 Parking Garage Maintenance |
|
Future Project |
8590 | 12437 | Waste Transfer Paving Extension |
|
Future Project |
8589 | 13160 | Library Service + Support - Siding Replacement |
|
Future Project |
8588 | 13345 | Overnight Men's Shelter |
|
07/13/23 |
8587 | 13343 | Tenney Park Beach Shelter |
|
07/14/22 |
8586 | 12789 | Reindahl Restroom Remodel |
|
06/03/21 |
8585 | 13282 | Dearholt Rd Resurfacing w/Utilities |
|
05/27/21 |
8584 | 13324 | N. Park Street Paver Repair & State Street Sidewalk Joint Repair |
|
02/09/23 |
8583 | 13011 | Halo Lane and Twilight Trail Reconstruction |
|
04/08/21 |
8582 | 13266 | Pavement Crack Repair and Chip Seal 2021 |
|
04/08/21 |
8581 | 13266 | Pavement Crack Repair and Chip Seal 2021 |
|
04/08/21 |
8580 | 13266 | Pavement Crack Repair and Chip Seal 2021 |
|
04/08/21 |
8579 | 13266 | Pavement Crack Repair and Chip Seal 2021 |
|
02/18/21 |
8578 | 11132 | Park St Pavement Joint Repair (2019 inbound:2021 outbound) |
|
06/24/21 |
8577 | 13271 | Forster Drive Resurfacing w/Utilities |
|
04/29/21 |
8576 | 13180 | N. Brooks St, Fahrenbrook Ct, College Ct Resurfacing w/Utilites |
|
05/06/21 |
8575 | 13141 | Bridge Repairs 2021 |
|
05/20/21 |
8574 | 13173 | W. Washington Avenue Resurfacing s/Utilities |
|
10/21/21 |
8573 | 13179 | Kronke Dr, Tanager Trl & Lanett Cir |
|
02/25/21 |
8572 | 10160 | Garver Path |
|
02/25/21 |
8572 | 12952 | Starkweather Drive Reconstruction |
|
06/24/21 |
8570 | 13264 | Local Road Traffic Calming & Arterial Ped Enhancements 2021 |
|
06/10/21 |
8569 | 11189 | Helena St/Russell St/Jenifer St Reconstruction |
|
03/03/22 |
8568 | 13175 | Old Middleton Rd & Craig Ave Resurfacing w/Utilties |
|
06/24/21 |
8567 | 13177 | Melvin Ct & Ridgeway Ave Resurfacing w/Utilities |
|
05/11/23 |
8566 | 13170 | Davies St & Dempsey Rd Reconstruction |
|
06/10/21 |
8565 | 13176 | Hooker Ave, Sheridan Dr, Steensland Dr Resurfacing w/Utilities |
|
05/27/21 |
8564 | 13270 | Felland Rd & Tranquility Trl Roundabout |
|
06/24/21 |
8563 | 13097 | Bikeways 2021 |
|
04/23/26 |
8562 | 13171 | Pontiac Trl, Boston Ct, Nokomis Ct, Rosewood Ct Recon |
|
04/22/21 |
8561 | 12195 | Hillcrest Dr, Alden Dr, Standish Ct Reconstruction |
|
06/25/20 |
8560 | 85100X | West Transfer Point Concrete Joint Repair 2020 |
|
04/09/20 |
8558 | 12690 | Pavement Crack Repair and Chip Seal 2020 |
|
04/09/20 |
8557 | 12687 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2020 |
|
04/23/20 |
8555 | 12487 | Prairie Road/Raymond Road Intersection Improvement |
|
05/21/20 |
8554 | 12950 | Highland Avenue Sidewalk and Lighting Improvements |
|
02/20/20 |
8543 | 11446 | RIMROCK INTRCPTR-INDUSTRIAL DR EXT |
|
02/06/20 |
8542 | 11399 | Spring Harbor Greenway at Masthead (Nautilus Pond Reconstruction) |
|
05/21/20 |
8538 | 12678 | 2020 Playgrounds - Group 2 |
|
05/21/20 |
8538 | 12681 | 2020 Playgrounds - Group 2 |
|
04/09/20 |
8536 | 12746 | McKenna Blvd Flood Mitigation - Phase 2 (Greentree Pond to N Struck St) |
|
02/06/20 |
8535 | 11229 | Metro Transit E. Wash Upgrades |
|
02/20/20 |
8534 | 12780 | 2020 Tennis and Basketball Court Resurfacings |
|
12/19/19 |
8532 | 12698 | UV CIPP Rehab of Sanitary Sewers - 2019 |
|
01/16/20 |
8526 | 51004 | Reynolds Park - Water Utility Rooftop Lighting |
|
09/09/21 |
8525 | 12154 | Spring Harbor Outfall Repair |
|
12/05/19 |
8521 | 12675 | Street End Repairs - (FEMA 81336) |
|
02/20/20 |
8516 | 12695 | Livingston Street Reconstruction |
|
06/04/20 |
8515 | 12688 | Local Road Traffic Calming & Arterial Ped Enhancements 2020 |
|
05/21/20 |
8514 | 12717 | Julia Street & Julia Court Resurfacing |
|
05/28/20 |
8513 | 12693 | Rethke Avenue Reconstruction |
|
04/28/22 |
8512 | 14056 | New Sidewalk Installation 2022 |
|
04/09/20 |
8511 | 12686 | Bridge Repairs 2020: Sycamore Ave over Starkweather Creek |
|
03/19/20 |
8510 | 12690 | Pavement Crack Repair and Chip Seal 2020 |
|
03/19/20 |
8509 | 12690 | Pavement Crack Repair and Chip Seal 2020 |
|
03/19/20 |
8508 | 12690 | Pavement Crack Repair and Chip Seal 2020 |
|
03/19/20 |
8507 | 12690 | Pavement Crack Repair and Chip Seal 2020 |
|
04/30/20 |
8506 | 10225 | Anderson Street Resurfacing |
|
01/20/22 |
8505 | 11202 | Cedar Street Reconstruction |
|
01/20/22 |
8505 | 13062 | Cedar Street (relocate Appleton Rd) |
|
01/21/21 |
8504 | 11866 | Cedar Street (new street) |
|
01/21/21 |
8504 | 12956 | South Street, W. Wingra Drive & High Street(recon) Resurfacing w/Utilities |
|
12/03/20 |
8503 | 11190 | Dunning St, Jackson St & LaFollette Ave Reconstruction |
|
03/19/20 |
8502 | 12564 | Packers Avenue Resurfacing w/Utilities |
|
03/05/20 |
8501 | 11188 | Gregory/Cross/Copeland/Western Reconstruction |
|
02/20/20 |
8500 | 11164 | Martin Luther King Jr. Blvd Sidewalk Replacement |
|
03/05/20 |
8499 | 12365 | Bikeways 2020 |
|
12/03/20 |
8498 | 12694 | Rockstream Drive (new street) |
|
04/09/20 |
8497 | 12692 | Sidewalk, Curb&Gutter, Citywide Installation and Repair 2020 |
|
03/19/20 |
8495 | 12687 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2020 |
|
03/19/20 |
8493 | 12612 | Sidewalk Program 2020, Ald. District 4 |
|
03/19/20 |
8493 | 12613 | Sidewalk Program 2020, Ald. District 8 |
|
02/20/20 |
8492 | 12691 | Resurfacing 2020 |
|
02/20/20 |
8491 | 12691 | Resurfacing 2020 |
|
02/20/20 |
8490 | 12691 | Resurfacing 2020 |
|
12/05/19 |
8484 | 45300 | Semi Permanent Epoxy Pavement Marking |
|
11/07/19 |
8483 | 12698 | UV CIPP Rehab of Sanitary Sewers - 2019 |
|
11/19/20 |
8480 | 19050 | Tenney Park Lagoon Biostabilization |
|
11/07/19 |
8479 | 17390 | Reindahl Park Barn Improvements |
|
Future Project |
8473 | 12154 | Spring Harbor Outfall Repair |
|
08/22/19 |
8468 | 11845 | Storm Structural Repairs 2019 |
|
09/05/19 |
8466 | 12481 | Southwest Bikepath Culvert Replacement at Waite Circle - 2019 |
|
08/22/19 |
8465 | 11021 | Truck Scales Project |
|
08/08/19 |
8461 | 11989 | CIPP Rehab of Sanitary and Storm Sewers - 2019 |
|
08/08/19 |
8460 | 10985 | Sauk Creek Greenway - Tree Lane to High Point |
|
09/05/19 |
8459 | 10955 | MPD Central Painting & Carpet Replacment |
|
07/11/19 |
8456 | 19391 | Summit West Maintenance Facility Improvements 2019 |
|
07/25/19 |
8455 | 19021 | Park Paving 2019 |
|
07/11/19 |
8453 | 19033 | 2019 Glacier Hill Park Sun Shelter Installation |
|
09/19/19 |
8441 | 17365 | North Star Dog Park |
|
09/19/19 |
8430 | 11471 | Judge Doyle Garage(20017) Government East Ramp Demolition(2019) |
|
06/06/19 |
8427 | 17451 | Fire Station 14 (2018) & Fire Station 14 Training Tower (2019) |
|
06/06/19 |
8425 | 19021 | Park Paving 2019 |
|
07/25/19 |
8423 | 17421 | 2019 Northland Manor Tennis Courts |
|
05/23/19 |
8422 | 11845 | Storm Structural Repairs 2019 |
|
06/20/19 |
8421 | 11857 | Hawk's Landing Flood Mitigation - Southwest |
|
06/06/19 |
8420 | 11774 | GLENWOOD CHILDRENS PARK STORM IMPRV |
|
04/11/19 |
8396 | 8214556 | 2019 Parking Garage Maintenance |
|
04/04/19 |
8391 | 17525 | 2019 Playground Replacements |
|
02/28/19 |
8390 | 12264 | CIPP Wet Lining Rehab of Sanitary Sewers - 2019 |
|
02/21/19 |
8386 | 19014 | Forest Hill Cemtery Improvements 2019 |
|
03/21/19 |
8381 | 11227 | |
|
02/07/19 |
8379 | 11808 | Warning Sirens - 2019 |
|
12/20/18 |
8374 | 11446 | RIMROCK INTRCPTR-INDUSTRIAL DR EXT |
|
03/07/19 |
8370 | 11876 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2019 |
|
02/21/19 |
8369 | 11876 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2019 |
|
04/04/19 |
8368 | 11881 | Sidewalk, Curb & Gutter, Citywide Installation and Repair 2019 |
|
02/21/19 |
8367 | 11880 | Sidewalk Program 2019, Ald. District 9 |
|
03/07/19 |
8366 | 11879 | Sidewalk Program 2019, Ald. District 1 & 7 |
|
10/24/19 |
8365 | 11166 | Capitol Square Café Areas |
|
06/20/19 |
8359 | 17395 | Burr Jones Park - Site Improvements |
|
07/02/20 |
8349 | 11739 | E. Dayton Street Resurfacing w/Utilities |
|
01/31/19 |
8348 | 19006 | 2019 Door Creek Park Tennis Courts Phase II |
|
06/06/19 |
8328 | 11330 | Olbrich Park Improvements |
|
12/06/18 |
8327 | 11808 | Warning Sirens - 2019 |
|
02/07/19 |
8325 | 11399 | Spring Harbor Greenway at Masthead (Nautilus Pond Reconstruction) |
|
02/28/19 |
8320 | 11856 | Resurfacing 2019 |
|
02/28/19 |
8319 | 11856 | Resurfacing 2019 |
|
02/28/19 |
8318 | 11856 | Resurfacing 2019 |
|
04/25/24 |
8317 | 13893 | Blue Harvest Lane, Feather Edge Drive, & Soaring Sky Run Assessment District – 2023 |
|
04/23/20 |
8316 | 10902 | Vilas Ave and Campbell St Reconstruction |
|
06/20/19 |
8315 | 11877 | Local Road Traffic Calming & Arterial Ped Enhancements 2019 |
|
05/09/19 |
8314 | 11875 | Bridge Repairs 2019 |
|
03/26/20 |
8313 | 11958 | City View Drive (new street) |
|
06/06/19 |
8312 | 11871 | South Point Road Reconstruction |
|
04/11/19 |
8311 | 11878 | Pavement Crack Repair and Chip Seal 2019 |
|
04/11/19 |
8310 | 11878 | Pavement Crack Repair and Chip Seal 2019 |
|
04/11/19 |
8309 | 11878 | Pavement Crack Repair and Chip Seal 2019 |
|
04/11/19 |
8308 | 11878 | Pavement Crack Repair and Chip Seal 2019 |
|
04/25/19 |
8307 | 11132 | Park St Pavement Joint Repair (2019 inbound:2021 outbound) |
|
03/19/20 |
8306 | 11744 | Toepfer, Holly, Euclid and St. Clair Resurfacing w/Utilities |
|
06/06/19 |
8305 | 11890 | Davidson/Drexel/Lake Edge |
|
03/26/20 |
8304 | 11889 | E. Washington Avenue Permanent Pavement Marking Replacement-2020 |
|
Future Project |
8303 | 11873 | Belin Street and Park Way Reconstruction |
|
05/23/19 |
8302 | 10900 | Oak Street Reconstruction |
|
02/28/19 |
8301 | 11963 | Reetz Road & Altem Cir Storm w/Resurfacing |
|
04/20/23 |
8300 | 11986 | W. Wilson St, S. Broom St. & S. Henry St Resurfacing w/Utilities |
|
06/20/19 |
8299 | 11987 | N. Bassett Street Resurfacing w/Utilities |
|
03/07/19 |
8298 | 11872 | Groveland Terrace Reconstruction |
|
02/07/19 |
8297 | 11452 | Haywood Drive Reconstruction |
|
02/07/19 |
8296 | 11944 | E. Wilson, Williamson and S. Blount Street Reconstruction |
|
10/24/19 |
8295 | 11182 | Elizabeth St and N. Ingersoll St Reconstruction |
|
03/05/20 |
8294 | 11865 | Dairy Drive (new street) |
|
06/20/19 |
8293 | 11985 | New Sidewalk Installation 2019 |
|
01/10/19 |
8292 | 11753 | Hammersley Avenue Reconstruction |
|
10/11/18 |
8291 | 11982 | Fainchild Building - Roof Replacement |
|
01/24/19 |
8290 | 13115 | Judge Doyle Podium |
|
09/27/18 |
8289 | 11982 | Fainchild Building - Roof Replacement |
|
02/21/19 |
8288 | 10543 | Parks Improvements |
|
03/05/20 |
8287 | 12881 | Olbrich Roof Replacements |
|
04/25/19 |
8277 | 53W0896 | Buckeye Road Reconstruction |
|
04/25/19 |
8276 | 11761 | DARBO DR CANOE LAUNCH 2019 |
|
09/20/18 |
8275 | 17133 | Olbrich Park Maintenance Shed |
|
09/20/18 |
8273 | 10524 | McPike Park - Skatepark Seating Area |
|
09/20/18 |
8268 | 10314 | Jacobson-Furey Pond |
|
10/25/18 |
8267 | 17384 | Brittingham Dog Park Improvements |
|
09/20/18 |
8258 | 11774 | GLENWOOD CHILDRENS PARK STORM IMPRV |
|
09/06/18 |
8255 | 11827 | Sanitary Sewer Access Structure Lining - 2018 |
|
08/23/18 |
8250 | 10426 | Sycamore Sanitary Sewer Interceptor Maintenance Access - Phase 1 |
|
09/20/18 |
8245 | 10954 | Madison Police North District Flooring Replacement |
|
10/25/18 |
8244 | 80007 | Monona Terrace Airwall Replacement |
|
09/09/21 |
8243 | 13278 | Fire Station 10 - Roof Replacement |
|
08/23/18 |
8240 | 10287 | Demolition - Unit Well 3, 212 N First St |
|
02/28/19 |
8238 | 11227 | |
|
02/28/19 |
8238 | 11228 | Metro 1101 Phase 1 Wash Bay |
|
07/12/18 |
8232 | 11761 | DARBO DR CANOE LAUNCH 2019 |
|
06/28/18 |
8229 | 11864 | E. Washington Avenue Permanent Pavement Marking Replacement-2018 |
|
06/28/18 |
8228 | 17366 | 2018 Elver Park Inclusive Playground |
|
06/28/18 |
8227 | 11867 | CIPP Rehab of Sanitary Sewers - 2018 |
|
08/02/18 |
8225 | 17133 | Olbrich Park Maintenance Shed |
|
08/02/18 |
8224 | 10524 | McPike Park - Skatepark Seating Area |
|
08/02/18 |
8222 | 17158 | Breese Stevens Field-Concession and Restroom Building |
|
07/12/18 |
8221 | 20166 | Monona Terrace |
|
08/09/18 |
8220 | 17381 | |
|
07/12/18 |
8216 | 45865 | American Parkway-American Family Drive Traffic Signal |
|
07/19/18 |
8213 | 10066 | Neighborhood Centers |
|
06/07/18 |
8212 | 11864 | E. Washington Avenue Permanent Pavement Marking Replacement-2018 |
|
05/24/18 |
8194 | 17398 | 2018 Tennis and Basketball Court Resurfacings |
|
05/24/18 |
8191 | 11743 | Blackhawk/Heather Crest/Bruce Ct Resurfacing w/Utilities |
|
05/03/18 |
8190 | 821455 | 2018 Parking Garage Maintenance |
|
06/07/18 |
8186 | 10445 | Old Sauk Road Water Pipeline (2018) |
|
06/28/18 |
8184 | 11767 | Westview Hills Sewer and Water Assessment District 2018 |
|
06/28/18 |
8182 | 17047 | Public Health Office Remodel |
|
08/02/18 |
8177 | 11330 | Olbrich Park Improvements |
|
04/12/18 |
8174 | 17304 | 2018 Parks Division Fencing and Backstops |
|
05/24/18 |
8172 | 17370 | 2018 Park Playground Improvements - Group 2 |
|
05/24/18 |
8171 | 17158 | Breese Stevens Field-Concession and Restroom Building |
|
04/12/18 |
8164 | 17495 | Park Paving 2018 |
|
07/12/18 |
8162 | 17193 | Olbrich Botanical Expansion Ph 1 |
|
06/07/18 |
8161 | 11897 | CIPP Rehabilitation of Water Mains - 2018 |
|
05/03/18 |
8160 | 17473 | Gates of Heaven |
|
04/12/18 |
8158 | 17502 | Meadowood Park Sun Shelter Installation |
|
04/05/18 |
8156 | 16124 | 2018 State Street Campus-Frances Parking Garage Electrical Modifications and Upgrade |
|
03/15/18 |
8155 | 17398 | 2018 Tennis and Basketball Court Resurfacings |
|
03/15/18 |
8154 | 17376 | 2018 Playground Replacements - Group 1 |
|
04/05/18 |
8153 | 821455 | 2018 Parking Garage Maintenance |
|
02/22/18 |
8152 | 11653 | Summit Maintenance Facility - Building Improvements |
|
05/24/18 |
8151 | 17366 | 2018 Elver Park Inclusive Playground |
|
01/25/18 |
8144 | 11562 | WINGRA PARK SHORELINE |
|
04/04/19 |
8143 | 12594 | Madison Water Utility Olin Ave Vehicle Storage Roof Replacement |
|
03/15/18 |
8128 | 45852 | Maple Terrace/ University Ave Traffic Signal |
|
06/28/18 |
8127 | 11754 | Bikeways 2018 |
|
05/24/18 |
8126 | 11587 | Local Road Traffic Calming & Arterial Ped Enhancements 2018 |
|
06/28/18 |
8125 | 11750 | 2018-New Sidewalk Installation |
|
12/20/18 |
8124 | 11746 | Darwin Rd Resurfacing w/Utilities |
|
05/03/18 |
8123 | 11650 | Glenview Dr and Joylynne Dr Reconstruction |
|
05/24/18 |
8122 | 11181 | Prospect(N) Avenue Reconstruction |
|
03/05/20 |
8121 | 11677 | Alleys: 1800&1900 Adams&Jefferson: 1800 Adams&Vilas: 1200&1300 Chandler&Vilas |
|
05/24/18 |
8120 | 11783 | Bridge Repairs 2018 |
|
02/28/19 |
8119 | 11185 | S. Bryan/James/Thorp Reconstruction |
|
02/28/19 |
8119 | 11749 | STARKWEATHER SHORE REPAIR - DALEY DRIVE |
|
04/19/18 |
8118 | 53W0752 | W. Washington Avenue Pavement Replacement |
|
04/12/18 |
8116 | 10901 | Pine Street Reconstruction |
|
04/12/18 |
8116 | 11180 | Gilson Street Reconstruction |
|
05/03/18 |
8114 | 11722 | Frey St and Sawyer Ter Resurfacing w/Utilities |
|
04/05/18 |
8111 | 11654 | Utilities with Resurfacing 2018 |
|
03/21/19 |
8110 | 11676 | Koster Street and Rusk Avenue |
|
05/03/18 |
8109 | 11655 | Davidson/Hegg/Major/Drexal/Lake Edge Reconstruction |
|
03/22/18 |
8108 | 11745 | Schenk St and Richard St Resurfacing w/Utilities |
|
03/15/18 |
8107 | 11183 | Emerson Street and Lowell Street Reconstruction |
|
09/20/18 |
8106 | 11186 | Winnebago St and Linden Ave Reconstruction |
|
04/05/18 |
8105 | 11743 | Blackhawk/Heather Crest/Bruce Ct Resurfacing w/Utilities |
|
11/01/18 |
8104 | 11742 | Shepard/Chamberlain/Van Hise/Mason Resurfacing w/Utilities |
|
03/08/18 |
8103 | 11599 | S. Livingston Street Reconstruction |
|
02/08/18 |
8101 | 11294 | Wingra Creek Pedestrian Bridge Replacement |
|
02/22/18 |
8100 | 11674 | Resurfacing 2018 |
|
02/22/18 |
8099 | 11674 | Resurfacing 2018 |
|
02/22/18 |
8098 | 11674 | Resurfacing 2018 |
|
06/28/18 |
8097 | 10185 | Waste Oil Collection Sites |
|
04/12/18 |
8095 | 11784 | Pavement Crack Repair and Chip Seal 2018 |
|
04/12/18 |
8094 | 11784 | Pavement Crack Repair and Chip Seal 2018 |
|
04/12/18 |
8093 | 11784 | Pavement Crack Repair and Chip Seal 2018 |
|
04/12/18 |
8092 | 11784 | Pavement Crack Repair and Chip Seal 2018 |
|
01/25/18 |
8088 | 10011 | Monona Terrace Olin Terrace Rehabilitation |
|
12/15/17 |
8085 | 17186 | Olin Turville Park Boat Launch Improvements |
|
04/05/18 |
8082 | 10452 | Unit Well 12 Upgrade |
|
03/15/18 |
8077 | 11772 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2018 |
|
04/05/18 |
8076 | 11772 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2018 |
|
04/12/18 |
8075 | 11771 | Sidewalk, Curb & Gutter, Citywide Installation and Repair 2018 |
|
03/15/18 |
8074 | 11770 | Sidewalk Program 2018, Ald. District 16 |
|
04/05/18 |
8073 | 11769 | Sidewalk Program 2018, Ald. District 3 |
|
01/25/18 |
8072 | 11578 | Fire Station 10 Bathroom Remodel |
|
10/20/17 |
8065 | 53W1464 | Madison Municipal Building (MMB) |
|
12/15/17 |
8064 | 11226 | Madison Metro Bus Garage- Roof Replacement |
|
11/03/17 |
8063 | 17169 | Garver Feed Mill Material Hauling |
|
11/17/17 |
8062 | 17185 | Vilas Park - Lagoon Bridge Replacements |
|
11/03/17 |
8061 | 11591 | Fire Station 10 Storefront Replacement |
|
01/04/18 |
8058 | 11675 | Westmorland Blvd Utilities w/Resurfacing |
|
10/06/17 |
8053 | 10066 | Neighborhood Centers |
|
09/22/17 |
8047 | 53W1464 | Madison Municipal Building (MMB) |
|
09/08/17 |
8041 | 11728 | CIPP Rehab of Large Diameter Storm Sewer |
|
08/18/17 |
8035 | 11667 | PARK EDGE DRIVE FLOOD MITIGATION |
|
08/25/17 |
8033 | 11591 | Fire Station 10 Storefront Replacement |
|
08/18/17 |
8032 | 53W1787 | OLIN TRANSFER STATION STORMWATER IMPROVEMENT |
|
08/11/17 |
8030 | 20166 | Monona Terrace |
|
12/15/17 |
8027 | 17451 | Fire Station 14 (2018) & Fire Station 14 Training Tower (2019) |
|
07/07/17 |
8017 | 86001 | Sheboygan Ave Water Main Replacement |
|
07/07/17 |
8016 | 84024 | Traffic Signal at Mineral Point and Yellowstone |
|
06/16/17 |
8008 | 84024 | Traffic Signal at Mineral Point and Yellowstone |
|
08/25/17 |
8003 | 10524 | McPike Park - Skatepark Seating Area |
|
06/16/17 |
8002 | 17167 | Forest Hill Cemetery Improvements 2017 |
|
09/22/17 |
8000 | 11649 | E. Gilman St, N. Pinckney St and N. Bultler St Resurfacing w/Utilities |
|
10/06/17 |
7999 | 11469 | N. Hancock Street Reconstruction |
|
07/21/17 |
7998 | 11591 | Fire Station 10 Storefront Replacement |
|
06/16/17 |
7980 | 10986 | Corporate Drive Greenway |
|
07/21/17 |
7979 | 10991 | Monona Bay Shoreline Repairs |
|
07/21/17 |
7978 | 20166 | Monona Terrace |
|
10/20/17 |
7976 | 11470 | N. Blair Street Resurfacing wth Utlities |
|
12/21/17 |
7974 | 53W1720 | Monroe Street Reconstruction |
|
07/07/17 |
7973 | 45826 | Colony Dr & Gammon Rd |
|
07/07/17 |
7970 | 17437 | 2017 Demetral Park Adult Fitness |
|
06/16/17 |
7965 | 86003 | CIPP Rehabilitation of Water Mains - 2017 |
|
06/16/17 |
7964 | 86001 | Sheboygan Ave Water Main Replacement |
|
07/11/19 |
7963 | 10435 | Cannonball Water Main |
|
06/16/17 |
7959 | 17317 | Park Paving 2017 |
|
05/05/17 |
7957 | 11598 | Blount Street Resurfacing |
|
04/21/17 |
7956 | 11434 | Resurfacing with Utilities 2017 |
|
08/04/17 |
7952 | 11471 | Judge Doyle Garage(20017) Government East Ramp Demolition(2019) |
|
08/11/17 |
7951 | 01627 | Capitol East District Parking Structure |
|
09/08/17 |
7950 | 11653 | Summit Maintenance Facility - Building Improvements |
|
04/21/17 |
7949 | 17434 | Goodman Park Ice Rink Improvements |
|
05/05/17 |
7948 | 17167 | Forest Hill Cemetery Improvements 2017 |
|
04/12/17 |
7946 | 53W1464 | Madison Municipal Building (MMB) |
|
04/21/17 |
7945 | 17417 | Monona Terrace Ped/Bike Path |
|
04/26/17 |
7939 | 53W1464 | Madison Municipal Building (MMB) |
|
04/21/17 |
7936 | 10442 |
110 S. Paterson Street |
|
04/07/17 |
7935 | 11590 | Woods Road Resurfacing |
|
03/15/17 |
7934 | 53W1464 | Madison Municipal Building (MMB) |
|
05/19/17 |
7933 | 17137 | PENN PARK RESTROOM BUILDING |
|
05/05/17 |
7930 | 10543 | Parks Improvements |
|
05/19/17 |
7929 | 17347 | 2017 Park Playground Improvements - Group 3 |
|
04/07/17 |
7928 | 17555 | 2017 Parking Garage Maintenance |
|
04/07/17 |
7927 | 17440 | 2017 Brittingham Park Accessible Playground |
|
04/07/17 |
7925 | 17343 | 2017 Park Plaground Improvements |
|
03/24/17 |
7922 | 17434 | Goodman Park Ice Rink Improvements |
|
04/07/17 |
7917 | 17137 | PENN PARK RESTROOM BUILDING |
|
02/24/17 |
7913 | 10457 | West Transfer Station - Pole Shed |
|
02/24/17 |
7912 | 10457 | West Transfer Station - Pole Shed |
|
02/24/17 |
7911 | 10457 | West Transfer Station - Pole Shed |
|
03/24/17 |
7910 | 16126 | State Street Capitol Garage Relighting and Electrical Controls and Upgrade |
|
03/15/17 |
7906 | 11467 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2017 |
|
03/29/17 |
7905 | 11467 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2017 |
|
03/29/17 |
7904 | 11466 | Sidewalk Program 2017, Ald. District 15 |
|
03/15/17 |
7903 | 11465 | Sidewalk Program 2017, Ald. District 17 |
|
04/07/17 |
7902 | 11464 | Sidewalk, Curb & Gutter, Citywide Installation and Repair 2017 |
|
07/08/21 |
7901 | 11515 | Demetral Park Path Phase 2 |
|
03/29/17 |
7900 | 11463 | Pavement Crack Repair and Chip Seal 2017 |
|
03/29/17 |
7899 | 11463 | Pavement Crack Repair and Chip Seal 2017 |
|
03/29/17 |
7898 | 11463 | Pavement Crack Repair and Chip Seal 2017 |
|
03/29/17 |
7897 | 11463 | Pavement Crack Repair and Chip Seal 2017 |
|
08/11/17 |
7896 | 11571 | 2017-New Sidewalk Installation |
|
05/05/17 |
7895 | 11491 | Villager Mall Alley and Storm Relief |
|
02/24/17 |
7889 | 10403 | Overture Center Garage Elevator Modernization |
|
02/10/17 |
7887 | 17315 | 2017 Parks Division Landscaping |
|
02/10/17 |
7884 | 17075 | Alicia Ashman Library |
|
02/24/17 |
7880 | 10439 | Lakeview Reservoir Landscaping |
|
02/10/17 |
7879 | 17315 | 2017 Parks Division Landscaping |
|
01/27/17 |
7877 | 10990 | Warner Boat Launch Breakwater Reconstruction |
|
11/18/16 |
7872 | 45300 | Semi Permanent Epoxy Pavement Marking |
|
02/10/17 |
7869 | 10001 | Library Maintenance & Support Center Remodel |
|
01/27/17 |
7866 | 17472 | 2017 Tennis and Basketball Court Resurfacing |
|
12/16/16 |
7854 | 17434 | Goodman Park Ice Rink Improvements |
|
05/19/17 |
7852 | 11005 | Streets East Paving |
|
11/04/16 |
7851 | 11473 | CIPP Rehab of Sanitary and Storm Sewers - 2016 |
|
04/21/17 |
7850 | 11435 | Yuma Drive Resurfacing with Utilities |
|
06/16/17 |
7849 | 11462 | Local Road Traffic Calming & Arterial Ped Enhancements 2017 |
|
07/07/17 |
7848 | 11459 | Wilson Street and Henry St Resurfacing with Utilities |
|
05/19/17 |
7847 | 11430 | N. Bassett, Conklin/Univ Alley & Henry/Broom Alley Reconstruction |
|
02/17/17 |
7846 | 11438 | Watts Road and Harvest Moon Lane |
|
05/05/17 |
7845 | 11437 | S. Stoughton Rd Service Rd,Remington Rd & Blossom Ln |
|
02/08/18 |
7843 | 11461 | Ronald Reagan Ave, John Wall Dr and Merchant St |
|
01/27/17 |
7842 | 10898 | Grand Ave, Van Hise, Park Pl and Mason St Reconstruction |
|
04/29/21 |
7838 | 11432 | Dean Ave, Allis Ave, Tyler Cir & Seth Cir |
|
02/24/17 |
7837 | 11103 | Langdon Street Resurfacing and Streetscape |
|
04/21/17 |
7836 | 11433 | Douglas, Lamont, Acacia, Louden, Kvamme |
|
02/10/17 |
7835 | 10899 | Gregory/Knickerbocker/Sprague/Sheldon Reconstruction |
|
10/21/16 |
7834 | 10800 | CIPP Wet Lining Rehab of Sanitary Sewer - 2016 |
|
11/18/16 |
7823 | 10442 |
110 S. Paterson Street |
|
01/27/17 |
7821 | 10445 | Old Sauk Road Water Pipeline (2018) |
|
11/04/16 |
7820 | 11489 | Citywide Median Planting 2017 |
|
11/04/16 |
7819 | 10250 | Cottage Grove Road Median Planting 2017 |
|
11/04/16 |
7818 | 11488 | Traffic Calming Medians Landscaping 2017 |
|
10/07/16 |
7816 | 10461 | Demolition - 217 N. First St. |
|
11/04/16 |
7815 | 10848 | Wheeler at Bonner - Cherokee Pond |
|
03/24/17 |
7813 | 11431 | Sunset Courts (East, West, North & South) |
|
10/07/16 |
7806 | 17140 | Esther Beach Park Phase II Improvements |
|
12/16/16 |
7803 | 11429 | Capital Square Pavement Replacement Phase 2 |
|
Future Project |
7802 | 16108 | Capital City Path Extension |
|
Future Project |
7802 | 16109 | Capital City Path Extension-Sanitary |
|
Future Project |
7802 | 53W1791 | Capital City Path – Segment 4-6 |
|
06/16/17 |
7801 | 10154 | Capital City Path – Segment 1 |
|
05/05/17 |
7800 | 11468 | Bridge Maintenance and Repairs 2017 |
|
07/21/17 |
7799 | 11460 | Bike Paths 2017 |
|
03/24/17 |
7798 | 11434 | Resurfacing with Utilities 2017 |
|
02/10/17 |
7797 | 11369 | Resurfacing 2017 |
|
02/10/17 |
7796 | 11369 | Resurfacing 2017 |
|
02/10/17 |
7795 | 11369 | Resurfacing 2017 |
|
10/07/16 |
7792 | 10617 | Bowman Baseball Backstop Replacement |
|
08/12/16 |
7784 | 11363 | Olbrich Gardens Solar Hot Water System Installation |
|
08/12/16 |
7782 | 10121 | Esther Beach Park Shelter |
|
07/22/16 |
7780 | 11400 | Williamson Street Bridge Repair-2016 |
|
12/02/16 |
7776 | 11001 | Wash Bay |
|
09/09/16 |
7774 | 10457 | West Transfer Station - Pole Shed |
|
09/09/16 |
7773 | 45019 | Public Safety Radio System 2016 |
|
07/11/19 |
7769 | 11314 | Sycamore Ave Public Works Maintenance Facility – Office Remodel |
|
08/26/16 |
7767 | 10488 | Goodman Park Maintenance Storage Building D |
|
07/01/16 |
7763 | 11400 | Williamson Street Bridge Repair-2016 |
|
07/01/16 |
7761 | 53W1865 | Forest Hill Mausoleum-Building Envelope Repairs |
|
09/09/16 |
7760 | 10305 | Fleet Service Relocation |
|
08/05/16 |
7758 | 10952 | Police Department West District |
|
08/05/16 |
7757 | 11366 | Fire Station 9 Roof Replacement |
|
06/24/16 |
7756 | 10290 | CIPP Rehab of Large Diameter Sanitary and Storm Sewer |
|
07/01/16 |
7755 | B000127 | Metro Transit Repair and Refurbish Underground Diesel Fuel Storage Tanks |
|
08/05/16 |
7754 | 10305 | Fleet Service Relocation |
|
01/20/17 |
7751 | 53W1464 | Madison Municipal Building (MMB) |
|
08/26/16 |
7750 | 53W1464 | Madison Municipal Building (MMB) |
|
06/10/16 |
7748 | 10800 | CIPP Wet Lining Rehab of Sanitary Sewer - 2016 |
|
06/10/16 |
7747 | 10876 | SOUTH POINT YARD WASTE SITE AND DRIVEWAY REPAVING |
|
06/03/16 |
7745 | B000127 | Metro Transit Repair and Refurbish Underground Diesel Fuel Storage Tanks |
|
06/03/16 |
7740 | 17435 | 2016 Garner Park Tennis to Pickleball - Court Conversion |
|
07/08/16 |
7739 | 17143 | Brittingham Park Sidewalk Improvements |
|
05/20/16 |
7737 | 10914 | Monona Terrace |
|
05/06/16 |
7735 | 12095 | Madison Water Utility-SCADA Room Renovation |
|
08/05/16 |
7730 | 20170 | Monona Terrace Fire Alarm System Upgrade |
|
06/10/16 |
7729 | 86100 | Repaint Madison Water Utility Reservoirs 9, 115, and 315 |
|
04/13/16 |
7728 | 17423 | 2016 Parks Sun Shelters Installation |
|
06/16/17 |
7726 | 53W1832 | Midtown Police District Station |
|
04/22/16 |
7722 | 53W1864 | MATC NORTH DITCH RESTORATION |
|
04/27/16 |
7716 | 17456 | 2016 Parking Garage Maintenance |
|
04/08/16 |
7715 | 12095 | Madison Water Utility-SCADA Room Renovation |
|
03/30/16 |
7713 | 10800 | CIPP Wet Lining Rehab of Sanitary Sewer - 2016 |
|
05/06/16 |
7711 | 174295 | Park Paving - 2016 |
|
03/25/16 |
7710 | 53W1734 | Willow Creek Treatment System |
|
03/25/16 |
7709 | 17422 | 2016 Fall Parks Division and Water Utility Landscaping |
|
03/09/16 |
7698 | 11104 | Sidewalk Program 2016, Ald. District 2 |
|
07/08/16 |
7696 | 11363 | Olbrich Gardens Solar Hot Water System Installation |
|
04/08/16 |
7695 | 17439 | 2016 Park Playground Improvements- Group 2 |
|
05/06/16 |
7693 | 17441 | 2016 Park Playground Improvements - Group 3 |
|
02/24/17 |
7692 | 17449 | Packers Ave/Darwin Rd Intersection |
|
06/16/17 |
7690 | 11351 | Monona Bay Weed Cutter Dredging |
|
03/09/16 |
7685 | 53W1386 | Engineering Operations Building Addition |
|
03/25/16 |
7675 | 10430 | CIPP Rehabilitation of Water Mains - 2016 |
|
03/04/16 |
7674 | 17422 | 2016 Fall Parks Division and Water Utility Landscaping |
|
05/06/16 |
7673 | 11212 | E. Broadway Service Rd Water Main Replacement |
|
06/10/16 |
7670 | 11301 | Pleasant View and Blackhawk Rd Intersection Improvement |
|
03/04/16 |
7669 | 17422 | 2016 Fall Parks Division and Water Utility Landscaping |
|
04/01/16 |
7668 | 17423 | 2016 Parks Sun Shelters Installation |
|
06/10/16 |
7666 | 11306 | N. Segoe Road Water Main Replacement |
|
03/04/16 |
7664 | 17438 | 2016 Park Playground Improvements - Group 1 |
|
03/04/16 |
7663 | 11107 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2016 |
|
02/07/19 |
7662 | 10002 | Pinney Library |
|
05/06/16 |
7660 | 17435 | 2016 Garner Park Tennis to Pickleball - Court Conversion |
|
03/25/16 |
7659 | 11123 | Bridge Maintenance and Repairs 2016 |
|
02/19/16 |
7647 | 10617 | Bowman Baseball Backstop Replacement |
|
03/30/16 |
7644 | 11300 | New Sidewalk Installation 2016 |
|
06/01/16 |
7643 | 11211 | Bedford Street and MATC Pipe Bursting |
|
11/04/16 |
7641 | 10906 | Woodrow Street Reconstruction |
|
04/08/16 |
7640 | 10904 | Turner Ave and Allis Ave |
|
03/25/16 |
7639 | 11106 | Sidewalk, Curb & Gutter, Citywide Installation and Repair-2016 |
|
03/04/16 |
7638 | 11105 | Sidewalk Program 2016, Ald. District 6 |
|
02/19/16 |
7637 | 11104 | Sidewalk Program 2016, Ald. District 2 |
|
06/24/16 |
7636 | 10217 | Sherman Avenue (North) |
|
03/09/16 |
7634 | 10507 | Pavement Crack Repair and Chip Seal-2016 |
|
03/09/16 |
7633 | 10507 | Pavement Crack Repair and Chip Seal-2016 |
|
03/25/16 |
7632 | 10507 | Pavement Crack Repair and Chip Seal-2016 |
|
03/25/16 |
7631 | 10507 | Pavement Crack Repair and Chip Seal-2016 |
|
05/20/16 |
7630 | 11126 | Local Road Traffic Calming & Arterial Ped Enhancements-2016 |
|
02/19/16 |
7628 | 11107 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2016 |
|
02/05/16 |
7627 | 11091 | Hillcrest Dr & Hillcrest Circle |
|
04/27/16 |
7626 | 11095 | Fordem Aveune Utility Replacement w/Resurfacing |
|
03/30/16 |
7625 | 11099 | Cottage Grove Road Resurfacing |
|
06/16/17 |
7624 | 10429 | City View Drive (new street) |
|
02/19/16 |
7623 | 10903 | Capital Square Pavement Replacement Phase 1 |
|
02/05/16 |
7621 | 10895 | 2016 Resurfacing |
|
01/22/16 |
7618 | 17430 | 2016 Tennis and Basketball Court Resurfacings |
|
02/05/16 |
7616 | 10895 | 2016 Resurfacing |
|
02/05/16 |
7615 | 10895 | 2016 Resurfacing |
|
01/22/16 |
7614 | 53W1503 | McKenna Boulevard/S. Gammon Road |
|
02/21/19 |
7613 | 11094 | Portage Road |
|
02/21/19 |
7613 | 11785 | Portage to Eastpark Path |
|
02/21/19 |
7613 | 53W0916 | Eastlawn Plat Multi-Use Path Bridge |
|
03/25/16 |
7612 | 10893 | S. Park Street Sanitary Replacement |
|
02/05/16 |
7611 | 11097 | 2016 Utilities with Resurfacing |
|
11/13/15 |
7610 | 10526 | Tree Plantings |
|
11/13/15 |
7609 | 10526 | Tree Plantings |
|
11/06/15 |
7598 | 17453 | 2016 Street Tree Replacement |
|
10/09/15 |
7585 | 10394 | 2015 Parking Garage Maintenance |
|
11/04/16 |
7584 | 10896 | Sargent St and Walter St Resurfacing w/Utilities |
|
10/23/15 |
7580 | 10526 | Tree Plantings |
|
10/23/15 |
7579 | 10526 | Tree Plantings |
|
10/09/15 |
7570 | 17453 | 2016 Street Tree Replacement |
|
11/06/15 |
7565 | 10914 | Monona Terrace |
|
02/10/17 |
7564 | 10001 | Library Maintenance & Support Center Remodel |
|
08/21/15 |
7563 | 53W1854 | Arboretum Screen Structure Repair |
|
08/07/15 |
7558 | 11176 | Felland Road Resurfacing |
|
08/07/15 |
7557 | 53W1788 | STREETS EAST STORMWATER IMPROVEMENT |
|
07/24/15 |
7554 | 53W1932 | CIPP Rehab of Sanitary and Storm Sewers 2015 |
|
08/21/15 |
7545 | 10394 | 2015 Parking Garage Maintenance |
|
08/07/15 |
7544 | 10468 | Warner Park Basketball Court Lighting |
|
09/04/15 |
7541 | 10526 | Tree Plantings |
|
06/19/15 |
7539 | 53W1118 | High Point Road Confluence Pond Regrading |
|
06/19/15 |
7538 | 53W1800 | Nakoma Greenway Repair |
|
08/05/16 |
7532 | 53W1690 | 5200 Camden flood purchase |
|
06/05/15 |
7531 | 53W1831 | Lake Edge Park Shelter |
|
07/10/15 |
7529 | 10442 |
110 S. Paterson Street |
|
03/21/19 |
7528 | 10305 | Fleet Service Relocation |
|
07/10/15 |
7526 | 10486 | Owl Creek Park Development-Phase2 |
|
04/24/15 |
7517 | 53W1892 | Carpeting at South District Police Station |
|
09/04/15 |
7515 | 10463 | Tenney Lagoon Shoreline Native Vegetation Installation and Maintenance |
|
04/10/15 |
7506 | 53W1855 | Anderson Street Sanitary Lining Repair |
|
05/08/15 |
7505 | 10309 | Landscape Restoration 2015 |
|
03/27/15 |
7503 | 53W1916 | 2015 Spring Parks Division & Water Utility Landscaping |
|
03/27/15 |
7501 | 53W1892 | Carpeting at South District Police Station |
|
01/13/17 |
7500 | 10434 | Unit Well 31 Reservoir and Facility Construction |
|
04/17/15 |
7499 | 10434 | Unit Well 31 Reservoir and Facility Construction |
|
10/06/17 |
7498 | 10452 | Unit Well 12 Upgrade |
|
03/27/15 |
7496 | 10394 | 2015 Parking Garage Maintenance |
|
03/06/15 |
7495 | 53W1532 | Brittingham Park Path and Boat Launch Reconfiguration-2015 |
|
03/20/15 |
7493 | 10631 | 2015 Park Playgrounds - Group 2 - Tenney Park |
|
03/20/15 |
7493 | 10632 | 2015 Park Playgrounds - Group 2 - Sunridge Park |
|
03/20/15 |
7493 | 10637 | 2015 Park Playgrounds - Group 2 - Junction Ridge Park |
|
03/20/15 |
7493 | 10640 | 2015 Park Playgrounds - Group 2 - Demetral |
|
03/20/15 |
7493 | 10643 | 2015 Park Playgrounds - Group 2 - Bernies Beach Park |
|
03/20/15 |
7493 | 10645 | 2015 Park Playgrounds - Group 2 - Arbor Hills Park |
|
05/08/15 |
7490 | 53W1930 | Burning Wood/Comanche Way and Fourth Street Util w/Resurfacing |
|
03/20/15 |
7488 | 53W1928 | 2015 Dog Park Improvements |
|
03/06/15 |
7487 | 53W1927 | Structural Rehabilitation of Water Mains - 2015 |
|
03/20/15 |
7484 | 53W1929 | 2015 Street Tree Replacement |
|
04/24/15 |
7478 | 53W1922 | Forest Hill Cemetery- John Catlin Chapel Roof Replacement |
|
03/27/15 |
7475 | 53W1919 | Quann Park Tennis Courts - Phase 2 |
|
02/20/15 |
7473 | 53W1918 | 2015 Park Playgrounds - Group 1 |
|
03/06/15 |
7471 | 53W1917 | 2015 Parks Division Tree Planting |
|
03/06/15 |
7470 | 53W1916 | 2015 Spring Parks Division & Water Utility Landscaping |
|
02/20/15 |
7466 | 53W1915 | Highland Manor Park Improvements |
|
03/06/15 |
7465 | 53W1914 | Park Paving - 2015 |
|
06/10/16 |
7464 | 53W1911 | Demetral Park Path |
|
03/09/16 |
7462 | 53W1681 | Cottage Grove Rd and Dempsey Improvements |
|
03/06/15 |
7459 | 53W1772 | Yahara Hills Facility Improvements |
|
03/27/15 |
7458 | 53W1772 | Yahara Hills Facility Improvements |
|
01/27/17 |
7457 | 53W1910 | Whitney Way Water Pipeline |
|
02/20/15 |
7456 | 53W1908 | 2015 Tennis and Basketball Court Resurfacing |
|
01/07/15 |
7454 | 53W1434 | Fire Station Administration Office Building and Fire Station #1 - (Hovde Properties Tenant Improvements) |
|
04/07/17 |
7452 | 53W1903 | Lakeview Reservoir Pipeline Improvements, Phase 2 |
|
04/10/15 |
7451 | 53W1836 | Center Ave and Sommers Ave Reconstruction |
|
05/24/18 |
7450 | 53W1867 | Darbo Drive to Webb Avenue New Street Connection Assessment District - 2018 (Richard Davis Lane) |
|
05/22/15 |
7449 | 53W1899 | Bridge Maintenance and Repairs 2015 |
|
06/05/15 |
7448 | 53W1515 | Wirth Court Reconstruction |
|
Future Project |
7447 | 53W1061 | Hermina and Union Street Reconstruction |
|
05/08/15 |
7446 | 53W1887 | Marsh Road Resurfacing |
|
06/19/15 |
7445 | 53W1510 | Spruce St Reconstruction |
|
05/08/15 |
7444 | 53W1882 | Local Road Traffic Calming & Arterial Ped Enhancements-2015 |
|
05/08/15 |
7443 | 53W1876 | Cross Street |
|
05/22/15 |
7442 | 53W1844 | Turner Avenue |
|
05/22/15 |
7441 | 53W1842 | Hoepker Road |
|
04/24/15 |
7439 | 53W1506 | Potter Street Reconstruction |
|
Future Project |
7438 | 13305 | Nakoma Road Sidewalk |
|
04/01/15 |
7437 | 53W1793 | Utilities with Resurfacing 2015 |
|
04/01/15 |
7435 | 53W1845 | Larkin, Glenway, Hillcrest, Zwerg, Ross Resurfacing w/Utilities |
|
03/27/15 |
7434 | 53W1843 | Hanson Road |
|
05/22/15 |
7433 | 53W1753 | State Street Sidewalk Repairs-2015 |
|
03/27/15 |
7432 | 53W1839 | American Pkwy/Eastpark Blvd & American Pkwy/Buttonwood Dr |
|
05/21/26 |
7431 | 53W1834 | Cannonball Path Phase 6 |
|
04/22/16 |
7430 | 53W1890 | N LAKE STREET RESURFACING ASSESSMENT DISTRICT – 2016 |
|
05/22/15 |
7429 | 53W1901 | Sprecher Road, Commercial Ave Intersection |
|
03/27/15 |
7428 | 53W1847 | Adams, S. Randall and Mound Resurfacing w/Utilities |
|
03/06/15 |
7427 | 53W1885 | Repairing & Sealing Pavement Cracks, Major Streets - 2015 |
|
03/06/15 |
7426 | 53W1884 | Repairing & Sealing Pavement Cracks, Local Streets - 2015 |
|
03/06/15 |
7425 | 53W1881 | Chip Seal 2015-West |
|
03/06/15 |
7424 | 53W1880 | Chip Seal 2015-East |
|
03/20/15 |
7423 | 53W1846 | N Pinckney St Resurfacing w/Utilities |
|
02/06/15 |
7421 | 53W1898 | City Wide Street & Storm Upgrade and Repairs |
|
02/06/15 |
7419 | 53W1856 | S. Owen Drive Assessment District - 2015 |
|
02/06/15 |
7418 | 53W1837 | Tompkins Drive Assessment District - 2015 |
|
12/19/14 |
7417 | 53W1053 | Bascom Pl/Bascom St/Chamberlain Ave Reconstruction |
|
04/10/15 |
7416 | 53W1826 | Sidewalk, Curb & Gutter, Citywide Installation and Repair-2015 |
|
02/20/15 |
7414 | 53W1886 | Resurfacing 2015 |
|
02/20/15 |
7413 | 53W1886 | Resurfacing 2015 |
|
02/20/15 |
7412 | 53W1886 | Resurfacing 2015 |
|
01/09/15 |
7411 | 53W1896 | Booster Pump Station 115 Upgrade |
|
12/19/14 |
7409 | 53W1892 | Carpeting at South District Police Station |
|
12/12/14 |
7408 | 53W1785 | Skatepark - Central Park, Madison |
|
04/08/16 |
7407 | 53W1507 | Jenifer, Paterson & Brearly St Reconstruction & Few St(resurfacing) |
|
09/26/14 |
7401 | 53W1735 | Olbrich Park Canoe Launch |
|
Future Project |
7399 | 53W1874 | Metro Roof Phase 1 of 2 |
|
08/05/16 |
7398 | 53W1832 | Midtown Police District Station |
|
05/08/15 |
7395 | 53W1511 | Madison St Reconstruction & Oakland Ave(resurface)&Alley |
|
05/08/15 |
7392 | 53W1866 | Nakoma Park Pedestrian Entrance Steps-Masonry Repairs |
|
06/10/16 |
7391 | 53W1865 | Forest Hill Mausoleum-Building Envelope Repairs |
|
02/06/15 |
7389 | 53W1250 | Old Middleton/Eau Claire Intersection and Good Neighbor Trail |
|
05/22/15 |
7386 | 53W1820 | Tenney Lagoon Shoreline Restoration |
|
09/05/14 |
7385 | 53W1808 | Theresa Terrace Neighborhood Center |
|
03/27/15 |
7383 | 53W1440 | HVAC Upgrade for Olbrich Botanical Gardens-Phase 1 |
|
12/19/14 |
7381 | 53W1792 | Johns Street and Emil Street Utilities with Resurfacing |
|
07/25/14 |
7369 | 53W1663 | Eastmorland Park Greenway & Pond |
|
02/06/15 |
7367 | 53W1828 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2015 |
|
02/20/15 |
7366 | 53W1828 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2015 |
|
03/27/15 |
7365 | 53W1826 | Sidewalk, Curb & Gutter, Citywide Installation and Repair-2015 |
|
02/06/15 |
7364 | 53W1825 | Sidewalk Program-2015 |
|
03/06/15 |
7363 | 53W1825 | Sidewalk Program-2015 |
|
08/08/14 |
7362 | 53W1795 | 2014 Playground Improvements- Group 2 |
|
07/11/14 |
7356 | 53W1775 | Bittersweet Place |
|
08/22/14 |
7354 | 53W1819 | Lakeview Reservoir Pipeline Improvements |
|
08/22/14 |
7352 | 53W1818 | Aldo Leopold Park Shelter Installation |
|
06/27/14 |
7351 | 53W1676 | Sidewalk, Curb & Gutter, Citywide Installation and Repair-2014 |
|
08/08/14 |
7350 | 53W1815 | Bowman Lighting System - Phase Two |
|
08/08/14 |
7349 | 53W1814 | East Washington Ave Median Replanting-2014 |
|
08/08/14 |
7348 | 53W1814 | East Washington Ave Median Replanting-2014 |
|
08/05/16 |
7347 | 53W1813 | Fire Station #3 Roof Replacement |
|
07/02/14 |
7343 | 53W1625 | Highland Manor Storm Shelter (Site Grading Component) |
|
06/20/14 |
7341 | 53W1645 | CIPP Rehab of Sanitary and Storm Sewers 2014 |
|
08/22/14 |
7339 | 53W1809 | Lakeview Reservoir Reconstruction |
|
08/08/14 |
7335 | 53W1808 | Theresa Terrace Neighborhood Center |
|
06/20/14 |
7334 | 53W1806 | Fire Station #5 Roof Door and Hose Tower Repairs |
|
08/12/16 |
7330 | 53W1734 | Willow Creek Treatment System |
|
09/26/14 |
7327 | 53W1617 | Dunns Marsh Treatment Structure |
|
07/11/14 |
7325 | 53W1801 | Brittingham Park Paving Improvements |
|
07/02/14 |
7321 | 53W1797 | Structural Rehabilitation of Water Mains - 2014 West |
|
06/27/14 |
7320 | 53W1796 | Structural Rehabilitation of Water Mains - 2014 East |
|
06/06/14 |
7319 | 53W1625 | Highland Manor Storm Shelter (Site Grading Component) |
|
06/20/14 |
7318 | 53W1795 | 2014 Playground Improvements- Group 2 |
|
06/20/14 |
7317 | 53W1622 | Morrison Court Reconstruction |
|
06/06/14 |
7312 | 53W1785 | Skatepark - Central Park, Madison |
|
09/11/15 |
7311 | 10644 | 2015 Park Playgrounds - Group 2 - Badger Park |
|
09/11/15 |
7311 | 53W1756 | CCB City Channel and Shared Resource Planning Remodel |
|
04/25/14 |
7307 | 53W1625 | Highland Manor Storm Shelter (Site Grading Component) |
|
06/01/14 |
7303 | 53W0740 | Johnson Street, East Reconstruction |
|
04/04/14 |
7302 | 53W1742 | 2014 Park Division, Parking & Water Utility Landscaping |
|
04/04/14 |
7301 | 53W1742 | 2014 Park Division, Parking & Water Utility Landscaping |
|
04/04/14 |
7300 | 53W1742 | 2014 Park Division, Parking & Water Utility Landscaping |
|
05/06/16 |
7292 | 53W1773 | Lower Badger Mill Sanitary Sewer Interceptor Phase 3 |
|
08/08/14 |
7291 | 53W1299 | Lower Badger Mill Sanitary Sewer Interceptor Phase - 2 |
|
07/25/14 |
7286 | 53W1772 | Yahara Hills Facility Improvements |
|
03/28/14 |
7284 | 53W1767 | 2014 Playground Improvements- Group 1 |
|
04/11/14 |
7283 | 53W1766 | 2014 Parking Garage Maintenance |
|
03/28/14 |
7281 | 53W1532 | Brittingham Park Path and Boat Launch Reconfiguration-2015 |
|
02/21/14 |
7280 | 53W1667 | Boulevard Landscaping - 2013 |
|
05/23/14 |
7277 | 53W1762 | Park Paving - 2014 |
|
03/28/14 |
7276 | 53W1588 | Near West Sanitary Sewer Relocation Assessment District - 2014 |
|
04/11/14 |
7275 | 53W1761 | Landscape Restoration 2014 |
|
05/23/14 |
7274 | 53W1757 | Breese Stevens Field Synthetic Turf - 2014 |
|
02/21/14 |
7272 | 53W1667 | Boulevard Landscaping - 2013 |
|
02/06/15 |
7270 | 53W1750 | Hwy 151/Lancaster Dr Water Main Crossing |
|
Future Project |
7269 | 53W1749 | Dairy Drive MFD Training Exercise Building |
|
03/07/14 |
7266 | 53W1747 | Tenney Park Concrete Bridge Historic Restoration-2014 |
|
03/28/14 |
7265 | 53W1743 | Unit Well 7 Reconstruction and Filter Addition |
|
02/21/14 |
7264 | 53W1742 | 2014 Park Division, Parking & Water Utility Landscaping |
|
04/11/14 |
7260 | 53W1740 | 2014-2016 Semi-Permanent (Epoxy) Pavement markings |
|
02/21/14 |
7259 | 53W1626 | Elver and Reindahl Park Splash Pads |
|
02/21/14 |
7255 | 53W1678 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2014 |
|
09/26/14 |
7254 | 53W1712 | John Nolen Path Reconstruction |
|
06/27/14 |
7252 | 53W1718 | Local Road Traffic Calming & Arterial Ped Enhancements-2014 |
|
06/06/14 |
7251 | 53W1290 | South Point Road |
|
05/09/14 |
7250 | 53W0606 | Clemons, Helena, Walton, Jenifer Reconstruction |
|
03/28/14 |
7248 | 53W1056 | North St, Hoard St and Commercial Ave Reconstruction |
|
04/11/14 |
7247 | 53W1052 | Adams Street Reconstruction |
|
03/28/14 |
7246 | 53W1198 | Johnson and Henry Street Terrace Reconstruction |
|
03/28/14 |
7246 | 53W1360 | Langdon Street Streetscape 2014 & N. Hamilton Street |
|
04/24/15 |
7245 | 53W1704 | Capital City Path Reconstruction and Bridge Replacement |
|
03/07/14 |
7244 | 53W1672 | Utility Replacement with Resurfacing - 2014 |
|
03/07/14 |
7243 | 53W1721 | Henry Street, N. Reconstruction |
|
03/07/14 |
7243 | 53W1731 | Mifflin(West) Street Utilities with Resurfacing |
|
04/11/14 |
7242 | 53W1717 | Repairing & Sealing Pavement Cracks, Major Streets-2014 |
|
04/11/14 |
7241 | 53W1716 | Repairing & Sealing Pavement Cracks, Local Streets - 2014 |
|
02/21/14 |
7240 | 53W1715 | Chip Sealing 2014-West |
|
02/21/14 |
7239 | 53W1714 | Chip Sealing 2014-East |
|
06/20/14 |
7238 | 53W1547 | Cannonball Path Phase 5 |
|
06/10/16 |
7236 | 53W0861 | Ice Age Junction Path & E. Mendota-Pheasant Branch Greenway |
|
05/09/14 |
7235 | 53W1730 | Packers Avenue Sidewalk at Lakeland College |
|
04/11/14 |
7234 | 53W0615 | Commonwealth/Fox/Gregory Reconstruction |
|
03/28/14 |
7233 | 53W1699 | Resurfacing 2014 |
|
03/28/14 |
7232 | 53W1699 | Resurfacing 2014 |
|
06/27/14 |
7230 | 53W1727 | High Street |
|
05/23/14 |
7229 | 53W1705 | Alley Reconstruction, Block 2 Wingra Park |
|
06/20/14 |
7228 | 53W1583 | Alley Reconstruction, Block 11 Bowens addition |
|
06/05/15 |
7227 | 53W1683 | Bear Claw Way, Wilrich St and Cobalt St (new streets) |
|
06/27/14 |
7226 | 53W1338 | Elderberry Road (new street) |
|
06/27/14 |
7224 | 53W1726 | Cross Oak Drive (new street) |
|
01/24/14 |
7223 | 53W1725 | Goodman Topsoil Shed |
|
05/09/14 |
7221 | 53W1699 | Resurfacing 2014 |
|
02/07/14 |
7220 | 53W1699 | Resurfacing 2014 |
|
01/24/14 |
7219 | 53W1699 | Resurfacing 2014 |
|
01/24/14 |
7218 | 53W1699 | Resurfacing 2014 |
|
01/24/14 |
7217 | 53W1590 | King Street and E. Main Street Reconstruction |
|
02/07/14 |
7215 | 53W1710 | Tennis/Basketball Court Resurfacing - 2014 |
|
02/07/14 |
7211 | 53W1709 | West Badger Rd and Lancaster Dr Water Main Replacement |
|
03/26/14 |
7206 | 53W1193 | State Street Mall Reconstruction |
|
12/06/13 |
7203 | 53W1645 | CIPP Rehab of Sanitary and Storm Sewers 2014 |
|
01/10/14 |
7202 | 53W1631 | Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling |
|
08/22/14 |
7200 | 53W1696 | Warner Park Cunette Replacement |
|
10/04/13 |
7194 | 53W1183 | Own Park Drainage Channel Stabilization-2013 |
|
10/04/13 |
7191 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
01/09/15 |
7188 | 53W1693 | Booster Station 115 Pipeline Improvements |
|
10/04/13 |
7185 | 53W1685 | Well 24 - Roof Repairs |
|
09/06/13 |
7182 | 53W1183 | Own Park Drainage Channel Stabilization-2013 |
|
09/06/13 |
7181 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
09/06/13 |
7180 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
08/23/13 |
7177 | 53W1196 | Reiner Road Resurfacing |
|
02/07/14 |
7176 | 53W1678 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2014 |
|
03/07/14 |
7175 | 53W1676 | Sidewalk, Curb & Gutter, Citywide Installation and Repair-2014 |
|
02/21/14 |
7174 | 53W1675 | Sidewalk Program-2014 |
|
02/07/14 |
7173 | 53W1675 | Sidewalk Program-2014 |
|
09/20/13 |
7172 | 53W1671 | Traffic Engineering Electrical Upgrades-2013 |
|
08/09/13 |
7170 | 53W1648 | Unit Well 26 Reservoir Repairs |
|
08/16/13 |
7169 | 53W1165 | South Point Road Public Works Storage Building |
|
11/08/13 |
7167 | 53W1667 | Boulevard Landscaping - 2013 |
|
07/26/13 |
7161 | 53W1567 | Streets West, Cold Storage Roof Replacement |
|
08/23/13 |
7158 | 53W1644 | CIPP Rehab of Sanitary and Storm Sewers 2013 - Phase 1 |
|
09/06/13 |
7154 | 53W1593 | Breese Stevens Field Lighting/Sound System Improvements |
|
07/12/13 |
7153 | 53W1643 | Garner Park Masonry Repairs-2013 |
|
08/09/13 |
7150 | 53W1661 | Hoyt Park Fence Replacement |
|
07/26/13 |
7137 | 53W1657 | Basketball Court Reconstruction ‘13 |
|
08/09/13 |
7136 | 53W1655 | Blackhawk Park Shelter Installation |
|
08/09/13 |
7135 | 53W1656 | Bowman Lighting Distribution System |
|
08/23/13 |
7134 | 53W1649 | City-County Building GR-10 Reception Windows Replacement |
|
07/12/13 |
7132 | 53W1648 | Unit Well 26 Reservoir Repairs |
|
08/02/13 |
7131 | 53W1600 | Post Watford Pond Remediation |
|
07/12/13 |
7130 | 53W1647 | 2013 Park Playground Improvements |
|
06/21/13 |
7124 | 53W1639 | CIPP Rehabilitation of Water Mains - 2013 |
|
04/04/14 |
7123 | 53W1152 | Fire Station #13 |
|
06/21/13 |
7117 | 53W1579 | Badger Rock Path |
|
05/10/13 |
7114 | 53W1634 | Femrite Drive Resurfacing |
|
11/08/13 |
7107 | 53W1633 | Unit Well 26 Generator Addition |
|
05/10/13 |
7106 | 53W1630 | Brayton Lot Repairs |
|
03/28/14 |
7104 | 53W1449 | Tornado Shelter Project |
|
03/28/14 |
7104 | 53W1625 | Highland Manor Storm Shelter (Site Grading Component) |
|
06/07/13 |
7101 | 53W1629 | Booster Pumping Station 106 Reconstruction |
|
08/09/13 |
7100 | 53W1628 | Park Paving - 2013 |
|
08/09/13 |
7084 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
08/09/13 |
7083 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
08/09/13 |
7082 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
08/09/13 |
7081 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
08/09/13 |
7080 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
08/09/13 |
7079 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
08/09/13 |
7078 | 53W1619 | Monona Terrace Maintenance Projects-2013 |
|
03/28/14 |
7077 | 53W1618 | Streets East Tile Floor Replacement |
|
05/03/13 |
7071 | 53W1615 | Highland Ave Water Main Replacement |
|
04/05/13 |
7069 | 53W1611 | 2013 Parking Garage Maintenance |
|
05/03/13 |
7066 | 53W1608 | Tenney Park Lagoon Outlet Gate |
|
04/26/13 |
7062 | 53W1591 | Rain Garden & Median Planting 2013 |
|
02/22/13 |
7061 | 53W1428 | Don Miller Site Remediation |
|
05/22/15 |
7059 | 53W1604 | Central Park Phase 1B |
|
06/21/13 |
7053 | 53W1552 | Wolfe Addition to Hawks Creek |
|
06/07/13 |
7051 | 53W1599 | Madison Water Utility Unit Well 31 - Drill Well |
|
02/22/13 |
7048 | 53W1580 | Water Replacement with Resurfacing |
|
06/21/13 |
7047 | 53W1597 | Rennebohm Park Tennis Court Lighting |
|
05/24/13 |
7045 | 53W1595 | Upgrade Booster Pumps at Unit Well 20 |
|
06/07/13 |
7044 | 53W1593 | Breese Stevens Field Lighting/Sound System Improvements |
|
04/26/13 |
7043 | 53W1592 | Breese Stevens Field Concrete Deck Repairs |
|
04/26/13 |
7042 | 53W1589 | Walter Street and Johns Street Resurfacing |
|
03/22/13 |
7035 | 53W1495 | Sidewalk Program-2013 |
|
04/26/13 |
7034 | 53W1577 | MPD Training Center Parking Lot Expansion-Phase 2 |
|
02/22/13 |
7032 | 53W1575 | Warner Boat Launch Dredging 2012 |
|
04/26/13 |
7030 | 53W1573 |
Forest Hill Cemetery- Masonry Repairs to the Receiving Vault
& Chapel, Roof Replacement for the Chappel |
|
03/01/13 |
7029 | 53W1572 | Tennis Court Resurfacing-2013 |
|
02/15/13 |
7028 | 53W1570 | 2013 Park and Water Utility Landscape and Maintenance Contractor |
|
05/03/13 |
7027 | 53W1569 | Fleet Services Roof Replacement |
|
07/12/13 |
7026 | 53W1568 | Traffic Engineering-Building C Roof Replacement |
|
06/07/13 |
7025 | 53W1567 | Streets West, Cold Storage Roof Replacement |
|
03/22/13 |
7021 | 53W1492 | Resurfacing 2013 |
|
03/22/13 |
7020 | 53W1492 | Resurfacing 2013 |
|
06/21/13 |
7019 | 53W1560 | Evan Acres Road |
|
03/22/13 |
7016 | 53W1553 | Cherokee Drive Utilities with Resurfacing |
|
05/10/13 |
7015 | 53W1555 | Wheeler Rd, Delaware Blvd & Northland Dr Resurfacing |
|
02/22/13 |
7011 | 53W1194 | Webster Street Reconstruction |
|
12/07/12 |
7010 | 53W1551 | Atwood Avenue / Dunning Street Bike Crossing |
|
02/22/13 |
7009 | 53W1399 | University Relief Storm Phase 4 |
|
07/12/13 |
7008 | 53W0853 | Central Park - Phase I |
|
06/21/13 |
7007 | 53W1538 | World Dairy Campus Replat |
|
02/22/13 |
7006 | 53W1445 | W. Wilson Street Reconstruction |
|
05/10/13 |
7005 | 53W1475 | W. Johnson Street Curb and Terrace Repair 2013 |
|
02/22/13 |
7004 | 53W1496 | Utility Replacement with Resurfacing - 2013 (Clymer Pl Vacation) |
|
09/20/13 |
7003 | 53W1476 | University Avenue Landscaping |
|
05/09/14 |
7002 | 53W1332 | Stoughton Road/Voges Road Intersection |
|
04/05/13 |
7001 | 53W1491 | Repairing & Sealing Pavement Cracks, Major Streets-2013 |
|
04/05/13 |
7000 | 53W1490 | Repairing & Sealing Pavement Cracks, Local Streets - 2013 |
|
03/07/14 |
6999 | 53W1544 | Oakridge/Ohio/Miller Resurfacing |
|
04/26/13 |
6998 | 53W1483 | N. Henry Street and Iota Court Reconstruction |
|
04/10/15 |
6997 | 53W1047 | N. Charter St and Spring St Reconstruction |
|
02/08/13 |
6996 | 53W0618 | Mound Street Reconstruction |
|
06/07/13 |
6995 | 53W1489 | Local Road Traffic Calming & Arterial Ped Enhancements-2013 |
|
01/11/13 |
6994 | 53W1462 | Livingston Street Resurfacing with Utilities |
|
03/28/14 |
6993 | 53W1543 | Kendall/Prospect/Lathrop Resurfacing |
|
03/22/13 |
6992 | 53W1356 | Dayton Street (East) & N. Brearly St Reconstruction |
|
07/12/13 |
6991 | 53W1477 | Cottage Grove Road Resurfacing |
|
04/05/13 |
6990 | 53W1482 | Chip Sealing 2013-West |
|
04/05/13 |
6989 | 53W1481 | Chip Sealing 2013-East |
|
01/10/14 |
6988 | 53W1535 | John Nolen Bridge Repair 2014 |
|
04/19/13 |
6987 | 53W1478 | Merrill Crest Drive |
|
06/07/13 |
6986 | 53W1546 | John Nolen Drive/North Shore Drive intersection |
|
05/24/13 |
6985 | 53W1480 | Warner Park Paths |
|
01/25/13 |
6984 | 53W1484 | N. Thornton Avenue Reconstruction |
|
08/22/14 |
6983 | 53W1537 | Royster Clark Development |
|
05/24/13 |
6981 | 53W1534 | Keyes Avenue Reconstruction |
|
05/24/13 |
6980 | 53W1542 | Brentwood/Monterey/Trailsway/Wyldewood Resurfacing |
|
02/22/13 |
6979 | 53W1545 | Washington Avenue (East) Landscaping |
|
04/05/13 |
6978 | 53W1495 | Sidewalk Program-2013 |
|
02/22/13 |
6977 | 53W1494 | Sidewalk, Curb & Gutter, Citywide Installation and Repair-2013 |
|
02/22/13 |
6976 | 53W1488 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2013 |
|
03/22/13 |
6971 | 53W1492 | Resurfacing 2013 |
|
03/22/13 |
6971 | 53W1522 | Storm Sewer with Resurfacing 2013 |
|
02/08/13 |
6970 | 53W1492 | Resurfacing 2013 |
|
01/25/13 |
6969 | 53W1492 | Resurfacing 2013 |
|
01/25/13 |
6968 | 53W1492 | Resurfacing 2013 |
|
01/25/13 |
6967 | 53W1492 | Resurfacing 2013 |
|
10/05/12 |
6965 | 53W1498 | Madison Municipal Building- Electrical Panel Upgrade |
|
07/12/13 |
6962 | 53W1165 | South Point Road Public Works Storage Building |
|
10/05/12 |
6961 | 53W1326 | N. Franklin - N. Blair Street Sanitary Crossover |
|
11/02/12 |
6959 | 53W1424 | Midvale Median Landscaping |
|
10/12/12 |
6957 | 53W1528 | Truman Olson US Army Reserve Center |
|
09/21/12 |
6950 | 53W1473 | Boulevard Landscaping-2012 |
|
08/10/12 |
6948 | 53W1453 | City View Drive Water Main |
|
10/12/12 |
6946 | 53W1523 | West Streets Lighting Retrofit - 2013 |
|
09/14/12 |
6944 | 53W1302 | Park Street Pedestrian Bridge Repair |
|
08/31/12 |
6942 | 53W1065 | Warner Lagoon Outlet Culvert Repair |
|
09/07/12 |
6941 | 53W1521 | Well 15 VOC Air Stripper |
|
07/25/12 |
6939 | 53W1520 | Central Library Sanitary Sewer Lateral |
|
07/20/12 |
6938 | 53W1519 | BLAIR STREET SANITARY SEWER REPAIR 2012 |
|
08/03/12 |
6936 | 53W1497 | Fire Sprinkler Installation at Fire Station #4 |
|
08/24/12 |
6935 | 53W1116 | Sauk Creek Sewer Access Road, Phase 2 |
|
08/17/12 |
6934 | 53W1487 | Segoe Road Water Main |
|
08/17/12 |
6931 | 53W1486 | 600 Block West Badger Road Water Main |
|
08/17/12 |
6926 | 53W1471 | Park Street, Fish Hatchery Intersection Improvments |
|
08/10/12 |
6925 | 53W1470 | Commercial Avenue Service Road Railroad Crossing |
|
08/17/12 |
6924 | 53W1469 | Madison Police West District Paint and Wall Covering Replacement |
|
07/13/12 |
6923 | 53W1468 | Professional Drilling Services Associated with the Installation of a Groundwater Monitoring (Sentry) Well – Unit Well #8 / Elmside Circle Park Area. |
|
08/31/12 |
6922 | 53W1467 | Syene Road |
|
07/13/12 |
6919 | 53W1463 | CIPP REHABILITATION OF WATER MAINS - 2012 |
|
06/08/12 |
6918 | 53W1441 | Don Miller & Schappe Building Demolitions |
|
08/03/12 |
6912 | 53W1141 | Eastlawn Greenway Repair |
|
05/03/13 |
6907 | 53W1452 | Paint Cross Hill Drive Water Tower |
|
12/28/12 |
6906 | 53W1409 | E. Washington Ave and Livingston St Intersection Improvement |
|
05/25/12 |
6903 | 53W1448 | Conklin Place Sanitary Sewer and Watermain Replacement |
|
02/22/13 |
6902 | 53W1447 | Olbrich Gardens Restroom Addition |
|
07/20/12 |
6901 | 53W1446 | Tenney Park Tennis Court Lighting |
|
07/13/12 |
6900 | 53W1101 | Cherokee Marsh Stormwater Management Ponds |
|
06/29/12 |
6899 | 53W1453 | City View Drive Water Main |
|
05/04/12 |
6893 | 53W1436 | Install Direct Gas HVAC Units |
|
02/06/15 |
6891 | 53W1434 | Fire Station Administration Office Building and Fire Station #1 - (Hovde Properties Tenant Improvements) |
|
05/04/12 |
6889 | 53W1433 | 2012 Madison Parking Ramp Maintenance |
|
06/14/13 |
6886 | 53W1348 | Ice Age Junction Trail |
|
06/14/13 |
6886 | 53W1620 | Jeffy Trail Sanitary Sewer Assessment District |
|
08/17/12 |
6883 | 53W1426 | Starkweather Creek Restoration 2012 - Anderson St |
|
04/06/12 |
6882 | 53W1425 | Regent Street Resurfacing with Utilities |
|
01/01/12 |
6881 | 53W0712 | Monona Drive Reconstruction - Ph 2 |
|
06/01/12 |
6877 | 53W1422 | Garner Park Masonry Repairs 2012 |
|
05/04/12 |
6876 | 53W1421 | Dairy Drive Test Well |
|
06/29/12 |
6875 | 53W1420 | Engineering Service Building PV System - 2012 |
|
07/13/12 |
6871 | 53W1415 | Door Creek Culvert |
|
05/11/12 |
6870 | 53W1414 | Goodman Maintenance Facility, Building B-Heating and Ventilation Improvements |
|
05/25/12 |
6869 | 53W1412 | W. Johnson Street Curb and Terrace Repair |
|
03/16/12 |
6864 | 53W1404 | Cherokee Park Playground Equipment |
|
07/13/12 |
6859 | 53W1400 | Hudson Park Improvements |
|
01/11/13 |
6857 | 53W1396 | CIPP REHAB OF SANITARY SEWERS - 2012 PHASE 2 |
|
03/23/12 |
6856 | 53W0518 | University Avenue Reconstruction |
|
03/23/12 |
6856 | 53W1341 | Manitou Way Resurfacing |
|
03/23/12 |
6856 | 53W1395 | CIPP REHAB OF SANITARY SEWERS - 2012 PHASE 1 |
|
08/10/12 |
6855 | 53W1035 | Arboretum Pond 3 - Improvements Phase 2 |
|
03/02/12 |
6854 | 53W1394 | Park Landscaping-2012 |
|
04/06/12 |
6851 | 53W1391 | Streets South Point Rd - Salt Shed Roof Replacement |
|
02/24/12 |
6848 | 53W1388 | STH 113 Tree Planting and Landscaping - 2012 |
|
03/30/12 |
6846 | 53W1387 | Citywide Median Planting - 2012 |
|
02/10/12 |
6843 | 53W1308 | Resurfacing 2012 |
|
02/10/12 |
6842 | 53W1308 | Resurfacing 2012 |
|
05/04/12 |
6840 | 53W1382 | Cannonball Pipeline Phase 3 |
|
04/20/12 |
6838 | 53W1380 | Monona Terrace Community & Convention Center Operable Partition Repair and Fabric Replacement |
|
08/10/12 |
6837 | 53W1371 | Senior Center Remodeling - Phase III |
|
03/30/12 |
6836 | 53W1378 | RESTORATION LANDSCAPING 2012 |
|
06/08/12 |
6835 | 53W1377 | Kennedy Storm Bypass - Pipe - 2012 |
|
04/12/13 |
6834 | 53W1375 | Paunack Park Shoreline |
|
10/12/12 |
6833 | 53W1374 | Burrows Park Shoreline |
|
11/07/14 |
6832 | 53W0312 | Wingra Creek Parkway, Phase 3 |
|
05/09/14 |
6831 | 53W1182 | Yahara River Shoreline Repair |
|
07/20/12 |
6829 | 53W1370 | Forest Hill Cemetery Receiving Vault - Preservation of the North Wall |
|
01/11/13 |
6828 | 53W1369 | Olbrich Botanical Gardens Roof Replacement |
|
01/27/12 |
6824 | 53W1367 | Fairchild, Doty & Carroll Street (Outer Loop) |
|
04/06/12 |
6816 | 53W0614 | Beld Street Reconstruction |
|
04/20/12 |
6815 | 53W1351 | University Avenue Parking Lot University Ave final surface |
|
02/10/12 |
6811 | 53W1353 | Tenney Park Parking Lot Reconstruction |
|
01/27/12 |
6810 | 53W1352 | Warner Park Parking Lot Reconstruction-Phase 3 |
|
05/04/12 |
6809 | 53W1312 | Utility Replacement with Resurfacing - 2012 |
|
03/09/12 |
6806 | 53W1310 | Sidewalk, Curb & Gutter, Citywide Installation and Repair-2012 |
|
02/10/12 |
6805 | 53W1373 | Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2012 |
|
02/10/12 |
6804 | 53W1311 | Sidewalk Program-2012 |
|
03/09/12 |
6803 | 53W0603 | S. Ingersoll St & Rutledge St Reconstruction |
|
02/10/12 |
6802 | 53W1308 | Resurfacing 2012 |
|
02/10/12 |
6801 | 53W1308 | Resurfacing 2012 |
|
02/10/12 |
6801 | 53W1315 | STORM WITH RESURFACING 2012 |
|
01/27/12 |
6800 | 53W1308 | Resurfacing 2012 |
|
01/27/12 |
6799 | 53W1308 | Resurfacing 2012 |
|
01/27/12 |
6798 | 53W1308 | Resurfacing 2012 |
|
04/06/12 |
6797 | 53W1307 | Repairing & Sealing Pavement Cracks, Major Streets-2012 |
|
04/06/12 |
6796 | 53W1306 | Repairing & Sealing Pavement Cracks, Local Streets - 2012 |
|
01/27/12 |
6793 | 53W0608 | N. Orchard St and Spring St Reconstruction |
|
06/08/12 |
6792 | 53W1049 | Midland Street Reconstruction |
|
05/25/12 |
6791 | 53W1341 | Manitou Way Resurfacing |
|
06/08/12 |
6790 | 53W0613 | Madison Street Reconstruction |
|
06/08/12 |
6789 | 53W0390 | CTH M - Valley View Road - Pleasant View Road Intersection |
|
06/08/12 |
6789 | 53W1148 | Langdon Street Resurfacing |
|
06/08/12 |
6789 | 53W1305 | Local Road Traffic Calming & Arterial Ped Enhancements-2012 |
|
03/09/12 |
6788 | 53W1188 | Lawrence St, O'Sheridan St and Bresland Ct Reconstruction |
|
04/05/13 |
6787 | 53W1246 | Johnson St, E Bike Path |
|
03/23/12 |
6786 | 53W1266 | Ice Age Junction Trail – 2012 |
|
03/23/12 |
6785 | 53W1192 | Gorham/Henry/Frances Reconstruction(State St side streets) |
|
01/11/13 |
6783 | 53W1132 | Fairchild & W. Mifflin St. Reconstruction (Outer Loop) |
|
12/28/12 |
6782 | 53W0977 | Elderberry Road and Samuel Drive (new roads) |
|
07/13/12 |
6781 | 53W1350 | Eastwood Drive Sidewalk & Capital City Path Realignment |
|
04/06/12 |
6780 | 53W1303 | Chip Sealing 2012-West |
|
04/06/12 |
6779 | 53W1304 | Chip Sealing 2012-East |
|
01/27/12 |
6778 | 53W1296 | Camden Road |
|
07/13/12 |
6776 | 53W1297 | Bike Paths 2012 |
|
05/10/13 |
6775 | 53W1055 | Baltzell St and Cross St Reconstruction |
|
08/17/12 |
6768 | 53W1329 | Madison Police West District Carpet Replacement |
|
06/15/12 |
6744 | 53W1094 | LAKE EDGE BASIN REPAIR |
|
06/08/12 |
6741 | 53W0942 | Forsythia Cunette Rehabilitation |
|
06/08/12 |
6741 | 53W1437 | Bordner Park - Cunette Removal |
|
07/13/12 |
6701 | 53W1242 | Capital City Path - Segment 2 |
|
09/07/12 |
6656 | 53W1210 | Tenney Maintenance Bridge |
|
07/06/12 |
6611 | 53W1149 | Block 101 Alley |
|
05/27/13 |
6590 | 53W1152 | Fire Station #13 |
|
04/20/12 |
6586 | 53W1142 | Fire Station #2 Remodel |
|
04/20/12 |
6579 | 53W0982 | Langlois Street & Merrill Crest Dr |
|
04/12/13 |
6505 | 53W1033 | Mezzanine Construction-Sycamore |
|
12/04/15 |
6484 | 53W1386 | Engineering Operations Building Addition |
|
10/05/12 |
6469 | 53W0945 | Olbrich Drainage Ditch Stabiliztion |
|
06/14/13 |
6465 | 53W0940 | Bedford @ North Shore Storm Box Replacement |
|
08/10/12 |
6457 | 53W1393 | Madison Police Department Training Center - Phase 3 |
|
03/23/12 |
6444 | 53W0955 | Rosa Road Resurfacing and Sidewalk |
|
02/17/12 |
6369 | 53W0833 | Tennis Court Resuracing - 2012 |
|
01/13/12 |
6311 | 53W0778 | W. Lakelawn Place Reconstruction |

With GovernmentContracts, you can:
...Ave Reconstruction 07/09/26 9790 15525 Glenway Backyard Pipe Burst 05/14/26 9788 16257 CIPP ...
City of Madison
Bid Due: 12/17/2026
...Ave Reconstruction 07/09/26 9790 15525 Glenway Backyard Pipe Burst 05/14/26 9788 16257 CIPP ...
City of Madison
Bid Due: 12/17/2026
.../Reservoirs,Drainage,Heating, Ventilation, Air Conditioning (HVAC),Pipe Lining,Removal and Replacement... of pipe,Reservoir Construction (concrete),Roofing,Sitework/Excavating and ...
City of La Crosse
Bid Due: 12/02/2026
...existing water softeners, pipe through and install a new centralized water softener and ...
JUSTICE, DEPARTMENT OF
Bid Due: 12/04/2026