| Location: | Pennsylvania |
|---|---|
| Posted: | Sep 10, 2025 |
| Due: | Oct 15, 2025 |
| Agency: | County of Allegheny |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2351-0006 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work consists of the installation of two rows of vertically-aligned steel pipe dowels socketed into bedrock with a reinforced concrete wall cast around the upper portion of the outside row of dowels, topped by a reinforced concrete cap cast atop both rows of dowels, to stabilize and support a 360-foot length of Mount Troy Road Extension in Ross Township, Allegheny County, PA. Please refer to the advertisement file for further information.

With GovernmentContracts, you can:
...involves the installation of approximately 410 lineal feet of 15" SLCPP Storm Sewer ...
PennBid
Bid Due: 9/09/2026
...Project. In general work includes the supply of materials and installation for a ...
PennBid
Bid Due: 9/01/2026
...Project. In general work includes the supply of materials and installation for a ...
PennBid
Bid Due: 9/08/2026
..., oversight and to complete the replacement of existing curb, installation of stormwater ...
PennBid
Bid Due: 9/11/2026