| Location: | Pennsylvania |
|---|---|
| Posted: | Sep 10, 2025 |
| Due: | Oct 15, 2025 |
| Agency: | County of Allegheny |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2351-0006 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work consists of the installation of two rows of vertically-aligned steel pipe dowels socketed into bedrock with a reinforced concrete wall cast around the upper portion of the outside row of dowels, topped by a reinforced concrete cap cast atop both rows of dowels, to stabilize and support a 360-foot length of Mount Troy Road Extension in Ross Township, Allegheny County, PA. Please refer to the advertisement file for further information.

With GovernmentContracts, you can:
...40 Steel Overburden Casing Pipe 2C Drilling Boreholes to Accommodate Fourteen-Inch (14") Sch ...
State Government of Pennsylvania
Bid Due: 6/18/2026
...of the installation of stormwater pipe, approximately 8,000 feet of trail restoration, 1,190 ...
PennBid
Bid Due: 6/12/2026
..., June 29, 2026. The Project consists of the construction of 30-inch diameter ...
PennBid
Bid Due: 6/29/2026
...including approximately 287 linear feet of pipe, replacement of one (1) sanitary manhole, ...
PennBid
Bid Due: 6/23/2026