Remanufacture of KC-135 Refueling and Submerged Pumps

Location: Federal
Posted: May 8, 2025
Due: Aug 12, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • 29 - Engine Accessories
Solicitation No: FA8118-25-R-0057
Publication URL: To access bid details, please log in.
Follow
Remanufacture of KC-135 Refueling and Submerged Pumps
Active
Contract Opportunity
Notice ID
FA8118-25-R-0057
Related Notice
FD20302500280
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE AIR FORCE
Major Command
AIR FORCE MATERIEL COMMAND
Sub Command
AIR FORCE SUSTAINMENT CENTER
Office
FA8118 AFSC PZABB
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: May 08, 2025 11:39 am CDT
  • Original Date Offers Due: Aug 12, 2025 01:00 pm CDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Aug 27, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 2915 - ENGINE FUEL SYSTEM COMPONENTS, AIRCRAFT AND MISSILE PRIME MOVERS
  • NAICS Code:
    • 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
  • Place of Performance:
    USA
Description

REMANUFACTURE



A 3-YEAR (THREE-YEAR BASIC) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED.

NOTE: THE GOVERNMENT ANTICIPATES A SOLE SOURCE AWARD TO Eaton Corporation (CAGE: 86090).



(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.

(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).



(c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office @ 405- 739-7243.



SAR submittals need to be sent to:

https://www.tinker.af.mil/Home/429SCMS-SASPO/ Source Development Specialist Email: stacy.cochran@us.af.mil

As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.



(d) In order to receive any technical data related to this acquisition, offerors must send an email request to Dessie Bresin at dessie.breslin@us.af.mil or Amy Gil at amy.gil@us.af.mil . Release of any data is subject to applicable data rights. The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.**



In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp. Contractors who need an account will need to complete the instructions at the above link.

(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))

Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.

(f) END ITEMS BEYOND REMANUFACTURE

"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).



(g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further overhaul on any such items except



at the direction of the administrative contracting officer (ACO). Upon written confirmation from the ACO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the ACO.

Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.



(h) Condemned units shall not be counted as production.



(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.



(j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.

(l) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.



(m) Dates listed in clauses 52.216-19 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.



(n) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).

(o) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1 but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.

(p) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility. DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110 a contractor must submit a copy of their plan with their proposal.


Attachments/Links
Contact Information
Contracting Office Address
  • CP 405 739 2048 3001 STAFF DR STE 1AC4 99A
  • TINKER AFB , OK 73145-3303
  • USA
Primary Point of Contact
Secondary Point of Contact
History
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

.... SUITE 352A Albuquerque , NM 87104 USA Primary Point of Contact Eaton, ...

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/12/2026

...Point of Contact Eaton, Katrina katrina.eaton@bie.edu Phone Number 405-531-7933 Secondary Point...

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/12/2026

...), Merchant by Eaton Aerospace LLC (Cage Code 97484). Traceability means a clear, ...

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 6/09/2026

...98897) p/n 695974-3. Approved sources are Eaton Corp (CAGE 86090) and ITT Aerospace ...

DEPT OF DEFENSE

Bid Due: 6/17/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.