| Location: | Pennsylvania |
|---|---|
| Posted: | Nov 24, 2025 |
| Due: | Dec 11, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | East Norriton Township, Montgomery County |
| Publication URL: | To access bid details, please log in. |
Project Description: East Norriton Township is replacing the existing stormwater infrastructure on Pacer Lane from Meadowbrook Road downstream to the existing outfall. In general, the work consists of but is not limited to: the demolition of existing stormwater infrastructure, the installation of concrete box culvert, concrete storm pipe, plastic storm pipe, storm structures, restoration of pavement and grass areas, and associated incidental work.

With GovernmentContracts, you can:
...for the rehabilitation by means of Cured-In-Place Pipe liner installation and CCTV inspection...
Pittsburgh Water & Sewer Authority
Bid Due: 11/17/2026
...Waterproofing Membrane Installation; Subsurface Waterproofing Membrane Installation; Pipe Replacements... Project: Gascola Equalization Facility ...
PennBid
Bid Due: 11/03/2026
.... Linear Installation A. Equipment Setup B. Heat Coiled Liner C. Insert Liner ...
State Government of Pennsylvania
Bid Due: 11/03/2026
...and flowable fill, installation of new stormwater structures and pipes, and trench restoration. ...
PennBid
Bid Due: 11/18/2026