Backflow, valves and chiller replacements
| Location: |
Maryland |
| Posted: |
Sep 9, 2025 |
| Due: |
Sep 11, 2025 |
| Agency: |
JUSTICE, DEPARTMENT OF |
| Type of Government: |
Federal |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
15A00025Q00000111 |
| Publication URL: |
To access bid details, please log in. |
Backflow, valves and chiller replacements
Active
Contract Opportunity
Notice ID
15A00025Q00000111
Department/Ind. Agency
JUSTICE, DEPARTMENT OF
Sub-tier
ATF ACQUISITION AND PROPERTY MGMT DIV
Office
ATF
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Sep 09, 2025 12:51 pm EDT
-
Original Published Date: Sep 05, 2025 07:08 am EDT
-
Updated Date Offers Due: Sep 11, 2025 02:59 pm EDT
-
Original Date Offers Due: Sep 11, 2025 02:59 pm EDT
-
Inactive Policy: 15 days after date offers due
-
Updated Inactive Date: Sep 26, 2025
-
Original Inactive Date:
Sep 26, 2025
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
-
Product Service Code: Z1AA - MAINTENANCE OF OFFICE BUILDINGS
-
NAICS Code:
-
238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Beltsville
,
MD
20705
USA
Description
The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services:
-
Backflow Preventors
-
Supply and install 2 each 8” Zurn/Wilkins or equivalent BFP
-
Supply and install 1 each 4” Zurn/Wilkins or equivalent BFP
-
Supply and install 1 each 1.5” Zurn/Wilkins or equivalent BFP
-
Main Gate Valves
-
Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits.
-
NOTE-This work will need to be completed during off hours.
-
Chiller Pipe Replacement
-
Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room.
-
Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line.
-
Install 2 new thread-o-lets, plug one off and connect the new chemical line.
-
Replace the schedule 80 PVC all the way back to the ball valve with new split rings.
-
Leak checked to be performed and monitored by building engineers for 24 hours before insulating
-
Install new insulation and wrapping over new pipe and tie into existing.
-
The plastic vinyl 90's may be reused if not damaged during removal
-
The contractor shall provide and use a smoke eater during all welding, grinding, cutting, and torching of the pipe.
-
Provide necessary fire safety equipment and inform building engineers when fire or sparks will be taking place.
Attachments/Links
Contact Information
Contracting Office Address
-
ATF ACQUISITIONS OFFICE 99 NEW YORK AVE
-
WASHINGTON , DC 20226
-
USA
Secondary Point of Contact
History
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
..., stump grinding and plant spraying on campus and related properties of the ...
State Government of Maryland
Bid Due: 6/11/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.