| Location: | Alaska |
|---|---|
| Posted: | Mar 4, 2026 |
| Due: | Apr 21, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240BJ26Q0004 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Statement of Requirement
This project involves the removal of an existing concrete trail along the Portage Lake lakefront, and construction of a new trail that connects the existing Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC). Additionally, two (2) existing outhouses will be decommissioned, and one (1) new double vault outhouse will be built in a new location.
Project work will include demolition, earthwork, clearing and grubbing, small concrete structures, retaining wall installation, drainage, trail switchbacks, trail surfacing, outhouse installation, erosion control measures and re-seeding.
Period of performance: 6/1/2026 to 10/31/2027.
The project is located at the Begich Boggs Visitor Center in Portage Valley, Alaska. Latitude: 60°47'4.52"N, Longitude: 148°50'28.47"W.
| Apr 20, 2026 | [Combined Synopsis/Solicitation (Updated)] BBVC Lakefront Trail and Outhouse Replacement |

With GovernmentContracts, you can: