| Location: | North Carolina |
|---|---|
| Posted: | Oct 15, 2026 |
| Due: | Nov 12, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY27-ITBCON-31 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.

With GovernmentContracts, you can:
...the Eastside and Westside Wastewater Treatment Plants during the time period of February ...
City of High Point
Bid Due: 4/01/2029
.... The existing water and wastewater infrastructure is in very poor condition and ...
State Government of North Carolina
Bid Due: 12/16/2026
...Project is the addition of a lift station to the current City wastewater ...
State Government of North Carolina
Bid Due: 12/18/2026
..., October 27, 2026, at 11:00 AM at the Westside Wastewater Treatment Plant ...
City of High Point
Bid Due: 11/18/2026