| Location: | Florida |
|---|---|
| Posted: | Mar 19, 2025 |
| Due: | Mar 25, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z085Q11947 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
STATEMENT OF WORK (SOW)
FOR
USCGC HICKORY Thruster Prop Inspection
CGC HICKORY is experiencing an unusual noise coming from their stern thruster prop and recently had a dive inspection that noted an abnormality in their stern thruster tube.
1.0 GENERAL
The 225’ WLB asset, USCGC HICKORY, is experiencing voltage and amperage fluctuations on their bow and stern thruster around 60-70% load. During their most recent testing, they identified an unusual noise coming from their stern thruster tunnel which runs transverse to the ship. There is concern that there is mechanical damage to the prop, the thruster tube where it is housed, or potential imbalance due to marine growth or improper installation. During a previous cleaning within the last three weeks the video footage identified a potential left-over weld from an industrial availability seen in the picture below. The CTR will provide an inspection of bow the bow and stern thruster while on site, but particular attention will be on the stern thruster due to the findings below.
Figure 1: Abnormal Condition in Thruster Figure 2: Size of prop and Tunnel
The scope of this contract is defined by the efforts and tools required to support USCGC HICKORY (WLB 212). The Contractor shall provide all labor, materials, and tools necessary to inspect, record, photograph and document the condition of the thruster unit and its surroundings.
The goal is to determine if there is any damage, marine growth, or unusual observations for both the bow and stern thruster props, gear boxes, and housings. Additionally, this requirement is to determine the clearance of the blades, if the deformation in Figure 1 is contacting those blades when the prop is rotated, and to grind down the deformation to be flush with the rest of the tunnel
The following documents provide specifications, standards, or guidelines that must be complied with to meet the requirements of this contract:
Technical Publication Hull, Mechanical, & Electrical 3556
BOW AND STERN THRUSTERS
Unless otherwise stated, this contract applies to on-site support for USCGC HICKORY (WLB 212) at the USNA Mole pier, in Key West Florida
2.1 DIVE INSPECTION REQUIREMENTS
The Contractor shall comply with all local, state, and federal regulations and safety requirements. The contractor will coordinate with the engineer officer in charge on board to ensure the Safety/Dive Master Walk the ship and understand what equipment is tagged out for the different zones of the ship. The Safety shall have direct communication via Radio with engineer officer on board or there representative throughout the entirety of the evolution
2.2 Documentation
The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office and be sent to the ship and Surface Forces logistics center via email. All photos and videos with relevant info shall be shared as well. If too large to support email transfer, they will be transferred via DoD Safe website to the USCG.
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
4.1 PERIOD of Performance
Primary Day: 28MAR25
Secondary Day 31MAR25
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at CGC HICKORY Unless otherwise stated, this contract applies to on-site support for USCGC HICKORY (WLB 212) at the USNA Mole pier, in Key West Florida.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Officer (EO) as scheduling is subject to ship’s operations.
4.5 General Report Requirements
The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).
5.0 GOVERNMENT FURNISHED RESOURCES
NA
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
The EO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report IAW 2.1 & 2.2 of this SOW.
The Contractor photo and video documentation IAW 2.1 & 2.2 of this SOW.
RDD/POP: Primary Date Friday 28MAR25 Secondary Date 31MAR25
Place of Performance

With GovernmentContracts, you can: