Project ID: PW#2024-017
Title: 4th Ave S Over ARGO Bridge Repair
Addenda: 0
Release Date: 7/1/2026
Due Date: 8/5/2026
Project Description: This project rehabilitates the existing 4th Ave S over ARGO Bridge pier corbels using a 77 day full closure of the bridge. Work involves crack injection, concrete spall repair, Carbon Fiber Reinforced Polymer strengthening, partial demolition of select corbels, increasing the depth of the concrete overhangs using new reinforced concrete connected to the existing concrete using dowels, additional of external post-tensioning, and replacement of expansion joints. Temporary traffic control and channelization will be required. For the purpose of the Bidder/Subcontractor List, this project includes Rebar Installation and Structural Steel Installation.
Engineer's Estimate: $6,700,000 to $7,000,000
Project Location: Industrial District along 4th Avenue South over the ARGO Yard; north of S Dawson St and south of S Industrial Way.

With GovernmentContracts, you can:
...class 4 - asphalt concrete paving. Public Works Publication Date September 04, 2026 ...
State Government of Washington
Bid Due: 10/07/2026
...diameter concrete manholes, and two 60-inch diameter concrete manholes and other work, all ...
City of Vancouver
Bid Due: 9/22/2026
...ADA Sidewalk Assessment Tool The City of Poulsbo Public Works Engineering Division is ...
City of Poulsbo
Bid Due: 10/06/2026
...12:34 AM Public Works Project ID: PW#2026-016 Release Date: Wednesday, August 12, 2026 ...
City of Seattle
Bid Due: 9/30/2026