| Location: | South Carolina |
|---|---|
| Posted: | Oct 27, 2026 |
| Due: | Oct 29, 2026 |
| Agency: | City of Lexington |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 27-03 |
| Publication URL: | To access bid details, please log in. |
| Bid Number: |
27-03
|
| Bid Title: |
Addendum 2 Cherry Ridge Drainage Improvements
|
| Category: | Streets and Transportation |
| Status: | Open |
|
ADDENDUM NO. TWO ISSUE DATE: October 27, 2026
SOLICITATION DATED: October 14, 2026
PROJECT: Cherry Ridge Drainage Improvements #27-03
CLARIFICATIONS AND QUESTIONS
CLARIFICATIONS:
1. NONE
QUESTIONS:
1. C100: Keynote #2 on Demo page states to remove existing storm drain structures. Where do we put the
demolition costs for items not shown on the unit price bid form? Same question for demolition items
#5 and #6?
Answer: Existing drainage structures shall be removed and disposed of in accordance with the
SCDOT specifications and Bid Form Item No 2031000 for Unclassified Excavation.
2. Just checking if the new bid sheet is correct. The second page looks like it has some duplicate items.
Answer: Clarification No. 2 on Addendum No 1. states that a REVISED BID FORM is provided to
include an ADD ALTERNATE section. This may include some duplicate bid items.
3. Is the 42" Class IV the only RCP. Please verify the remaining pipe will be HDPE;
Answer: Pipe not specifically called out as Class IV RCP shall be either RCP or HP Storm.
DEADLINE FOR QUESTIONS: EXPIRED
BID OPENING DATE: October 29, 2026, at 3:00 PM
END ADDENDUM 2
1

With GovernmentContracts, you can:
...Project Name: Stormwater Drainage Study Agency/Owner: Pee Dee Regional Council of Governments Ad... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/01/2026
...Project Name: Rebid Jones Road Drainage Improvement Project Agency/Owner: Horry County Ad Publish... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/29/2026
...Project Name: North Dale Drive Drainage System Improvements Agency/Owner: City of Easley Ad.../advertisement-request-for-bids-north-dale-drainage-system-improvements ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 1/28/2027
...Project Name: ADDENDUM 2 CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT Agency/Owner: Town of Lexington...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/29/2027