| Location: | Connecticut |
|---|---|
| Posted: | Aug 19, 2025 |
| Due: | Sep 2, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 31957 |
| Publication URL: | To access bid details, please log in. |
The project consists of the turn-key replacement of fifteen (15) HVAC units, nine (9) at Edgewood School and six (6) at Lincoln Bassett School. Most are Roof Top Units (RTUs), some are Remote Condenser Units (RCUs) with section coils in nearby Air Handler Units (AHUs). The project will be design-build with "like-for-like" replacements. If like-for-like replacements are not available, a compatible solution must be proposed. Drawings and submittals must satisfy permitting and Connecticut Administrative Services requirements. The scope includes, but not limited to - removal and disposal, furnish and install, permitting, rigging, controls integration, and engineered drawings as applicable. Since work will occur when buildings are occupied, careful coordination will be required - including after school dismissal arrangements. All work must be completed and invoiced by December 19, 2025.
Shawn Garris 200 Orange Street New Haven CT, 06510 United States Tel: 203-946-8202 Fax: sgarris@newhavenct.gov

With GovernmentContracts, you can:
...Invitation to Bid for Construction Services Old New-Gate: Viets Rehabilitation 106 New Gate ...
State Government of Connecticut
Bid Due: 10/14/2026
...Energy Resilience Construction Grants This RFP solicits proposals from eligible entities to design...
State Government of Connecticut
Bid Due: 12/01/2026
...Sidewalk Construction and Repair Services TOWN OF PLAINFIELD R.F.P. for Sidewalk Construction... AND ...
Town of Plainfield
Bid Due: 10/20/2026
...Location 209160 b1537b05-966a-40d0-beb8-ba1dbd658c77 2027.0077 City Bid - Construction of Food..., Construction Manager, (203)-977-4179 ...
City of Stamford
Bid Due: 10/01/2026