August 21, 2026
INFORMAL WRITTEN QUOTE
IWQ 082126
Gwinnett County is soliciting competitive quotes from qualified contractors for the Gwinnett County Central
Services Canopy Addition Project for the Department of Support Services.
Quotes should be typed or submitted in ink and returned to the Attention of Jake Scarpone, Purchasing Associate
III. Quotes should be received by 3:00 P.M. on September 4, 2026 by email to Jake.Scarpone@GwinnettCounty.com
or sent to the Gwinnett County Financial Services - Purchasing Division – 2nd Floor – Financial Services, 75 Langley
Drive, Lawrenceville, Georgia 30046.
A pre-quote conference is scheduled for August 27, 2026 at 10:00 A.M. at Gwinnett County Central Services
located at 455 Grayson Highway, #200, Lawrenceville, GA 30046. The pre-quote conference will be held at the
rear of the building at the loading dock. All interested contractors are urged to attend. Questions regarding quotes
should be directed to Jake Scarpone, Purchasing Associate III at Jake.Scarpone@GwinnettCounty.com or by calling
770-822-8722 no later than 3:00 P.M. on August 28, 2026. Quotes are legal and binding upon the bidder when
submitted. The written Quote documents supersede any verbal or written prior communications between the
parties.
Successful awarded vendor will be required to meet insurance requirements. Insurance Company must be
authorized to do business in Georgia by The Georgia Insurance Department, listed in the Department of Treasury's
Publication of Companies holding Certificates of Authority as Acceptable Surety on Federal Bonds and as
acceptable reinsuring companies, and must have an A.M. Best rating of A-7 or higher.
Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs or
activities. Any requests for reasonable accommodations required by individuals to fully participate in any open
meeting, program or activity of Gwinnett County Government should be directed to the ADA Coordinator, Gwinnett
County Justice and Administration Center, 770-822-8165.
Award will be made to the contractor submitting the lowest responsive and responsible quote. Gwinnett County
reserves the right to reject any or all quotes, to waive technicalities, and to make an award deemed in its best
interest. Quotes may be split or awarded in entirety. Gwinnett County reserves the option to negotiate terms,
conditions and pricing with the lowest responsive, responsible bidder(s) at its discretion.
We look forward to your quote and appreciate your interest in Gwinnett County.
Jake Scarpone, CPPB
Purchasing Associate III
The following pages should be returned with your quote:
Quote Schedule, Page 9
References, Page 10
Subcontractor List, Page 11
E-Verify, Page 12
IWQ 082126
PAGE 2
SPECIFICATIONS
GWINNETT COUNTY CENTRAL SERVICES CANOPY ADDITION PROJECT
I. GENERAL INFORMATION
The Gwinnett County Department of Support Services is soliciting quotes from qualified contractors for a
canopy installation at Gwinnett County Central Services, located at 455 Grayson Highway, #200,
Lawrenceville, GA 30046.
The awarded contractor is expected to substantially complete the work within 180 calendar days of issuance
of a purchase order.
II. SPECIFICATIONS & SCOPE OF WORK
1. All specifications are listed in the attached construction documents, titled GWINNETT CENTRAL
SERVICE – CANOPY ADDITION, which include:
• 10 7316.13 – METAL CANOPIES
• A-201 – EXTERIOR ELEVATIONS
2. The SCOPE OF WORK includes:
Gwinnett County is seeking to procure two additional metal canopies on the Central Services site to both
cover an existing roll-up door and entry point for elections, as well as provide a cover for an exterior dock
lift. This new extruded aluminum walkways should match the existing canopy in design size, aesthetics,
and color. Both canopy designs are shown on included sheet A-201.
Canopy #1 includes cover from an existing roll up door to an exterior entry, which will allow for deliveries
along the existing concrete ramp in inclement weather. It’s proposed at approximately 56’-0” long by 8’-
0” wide and 9’-0” clear to the bottom. These dimensions need to be verified by the contractor to work
around existing conditions.
Canopy #2 for the Dock Lift is proposed to be approximately 12’-3” wide by 10’-0” long with four (4)
columns, which will need to be verified in the field by the awarded contractor. The height of the canopy
is proposed to be large enough for a tractor trailer truck to fit under, which is approximately 13’-6” tall.
Both canopies should include all concrete structural footing design and installations for a complete
system to be turned over to the Owner upon completion.
3. Implementation
The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the
work as described in the Scope of Work, Specifications, and General Requirements. Work will be
considered completed when the County Representative has determined that all requirements of the
project scope have been met. The contractor should attend a scheduled pre-bid meeting to inspect
existing conditions. The contractor shall be responsible for verification of conditions necessary to
properly execute the work. The contractor shall comply with all manufacturer recommendations and
specifications. The contractor shall haul away all trash, debris, and sediment collected in the scope of
work. The contractor will be required to work under the supervision of and comply with directions of
the County representative. This facility is always operational and must remain accessible to and
personnel. All emergency egress points must remain clear and unblocked. Other work may take place
at the facility concurrently.
All work must comply with the intent of the Construction Documents. The contractor will continuously
monitor the quality of both work and materials and address all concerns and correct issues
IWQ 082126
PAGE 3
communicated by the County Representative for each phase of work before moving on to the next
phase. The contractor must have a final proposed plan ready for the preconstruction meeting which
must be approved by the County Representative.
4. Scheduling of Work
The Contractor will email a proposed schedule to the County Representative and will provide notice of
delays as early as possible. Delays in scheduling may be approved due to inclement weather. It is
anticipated that all work will be completed during normal daytime working hours on consecutive days,
with some downtime possibly required to move vehicles from side of the parking lot to the other between
phases. The Contractor is expected to substantially complete the work within 180 calendar days of
issuance of a purchase order.
5. Protection, Cleaning and Restoration of Project Site
The Contractor shall take all necessary precautions and implement measures as applicable to protect
building fixtures and finishes in the immediate project area or affected by the project work. The
contractor also shall protect surfaces exterior to the building such as walkways, lawns, shrubs, and
trees. The contractor shall be responsible for placing all barriers, protective screening and/or signage
needed to caution or protect non-contractor personnel in the work area and adjacent spaces.
The contractor shall not dispose of volatile waste such as paints, cleaners, or solvents in storm or
sanitary drains, on pavement, or in gutters on the project site. The contractor shall not handle or dispose
of waste materials, cleaning compounds, paints, solvents, or other chemicals in a manner that will
adversely affect building occupants or that will contaminate soil or be harmful to plant life on the project
site.
The contractor shall keep the worksite clean and free of debris. Trash shall be removed from the site
daily. The contractor shall always maintain a level of cleanliness and neatness needed for proper
execution of the work. Tools and other equipment must be properly stored and secured. The contractor
will secure all facility entrances at the end of each workday as indicated during the preconstruction
meeting. The contractor shall keep finished work clean and shall protect it from damage.
When the work is complete, the contractor shall clean the project site in all areas disturbed by
construction, of rubbish, waste material and litter; remove all tools, construction equipment and surplus
materials from the project site; and remove temporary protection and facilities installed during
construction. Except as otherwise provided herein, all surfaces and/or finishes damaged by
construction shall be patched, repaired, or restored to match the surrounding areas.
6. Safety Precautions and Requirements
The contractor shall take precautions to prevent fires and to facilitate fire-fighting operations. The
contractor shall store flammable materials in non-combustible containers and away from fire sources,
shall remove flammable waste promptly and regularly, and shall carefully supervise operation of
potential fire sources, such as cutting and welding.
The contractor shall take precautions to prevent accidents due to physical hazards and shall provide
barricades and signs to protect the contractor’s personnel and the public from hazards and to inform
them thereof. Barricades and signage shall comply with all safety regulations.
The contractor shall provide and require use of safety equipment, clothing, and accessories as required
by construction activity and applicable safety regulations.
7. Insurance
The contractor shall obtain, maintain, and furnish the County with certificates of insurance covering the
duration of the project period. The insurance must include the terms and coverage provided for the
Vendor Insurance Requirements of these quote documents.