| Location: | Utah |
|---|---|
| Posted: | Dec 17, 2024 |
| Due: | Dec 20, 2024 |
| Agency: | Springville city |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Notice is hereby given that Springville City Incorporated (Owner) will accept bids for the construction of the 400 S Sewer Concrete Removal Project according to the Drawings and Specifications and in accordance with the Springville City Standard Specifications and Drawings Manual, and described in general as:
400 S
Remove concrete that is partially blocking an existing 12″ RCP sewer main located in 400 S at a bridge crossing Hobble Creek near the intersection with S Glenwood Dr. The existing sewer main is approximately 50′ and will need to be accessed via one of two SSMH located in 400 S. Between 5″ to 8″ of concrete is currently restricting the flow in the 12″ pipe, it is unknown if the entire length of pipe is restricted but it potentially may be.

With GovernmentContracts, you can:
...Project: 13800 South Mountain View Corridor Sewer Project Ref. #: JBID971 Department: SPECIAL... ...
State Government of Utah
Bid Due: 10/13/2026
...Project: 13200 South Mountain View Corridor Sewer Project Ref. #: JBID973 Department: SPECIAL... ...
State Government of Utah
Bid Due: 10/13/2026
...is comprised of approximately 1,100 miles of sanitary sewer lines. The District owns ...
State Government of Utah
Bid Due: 10/08/2026
...campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock...
AGRICULTURE, DEPARTMENT OF
Bid Due: 10/08/2026