| Location: | Texas |
|---|---|
| Posted: | Aug 4, 2026 |
| Due: | Nov 3, 2026 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-1392 |
| Publication URL: | To access bid details, please log in. |
26-1392
Posted
Bryan Gray
(254) 761-3123
allison.sheeler@brazos.org
allison.sheeler@brazos.org
11/3/2026
10:00 AM
K4600
21+ Days for Solicitation Notice
CTCD
8/3/2026
8/3/2026 6:58 pm
15500-Buildings And Structures: Fabricated And Prefabricated;
90900-Building Construction Services, New (Incl. Maintenance And Repair Services);
91148-C.I.P., Preconstruction Services;
91177-Facilities and Other Improvements;
91200-Construction Services, General (Incl. Maintenance And Repair Services);
91238-Construction Services, Hazardous Waste (Incl. Site Management);
91300-Construction Services, Heavy (Incl. Maintenance And Repair Services);
91359-Construction And Upgrades, Wastewater Treatment Plant;
91360-Construction, Water System/Plants, Main And Service Line;
91391-Maintenance And Repair, Wastewater Treatment Plant;
91400-Construction Services, Trade (New Construction);
95108-Facilities and Other Improvements, Fences;
95109-Facilities and Other Improvements;
95115-Infrastructure and Infrastructure Improvements;
District 1,
District 2,
District 3,
District 4,
District 5,
District 6,
District 7,
District 8,
District 9,
District 10,
District 11,
District 12,
District 13,
District 14,
District 15,
District 16,
District 17,
District 18,
District 19,
District 20,
District 21,
District 22,
District 23,
District 24,
District 25
The BRA is soliciting sealed proposals for the EWCRWS Infrastructure and Expansion
The “1B1D PROJECT” represents two critical expansion improvements to the Brazos River Authority’s (BRA) East Williamson County’s Regional Water System Water Treatment Plant (EWCWTP); Phase 1B and Phase 1D.
The Phase 1B Trinity Well Infrastructure Improvements will use cooling towers to treat up to 4 MGD of groundwater from the existing Trinity Well #1 for blending with treated surface water from Granger Lake. Trinity Well #1 is located on the campus of the EWCWTP. Additionally, Phase 1B work located at the EWCWTP includes significant chemical monitoring and distribution systems, stormwater system, upgrades to electrical and automation, and access road improvements that provide future buildout resilience.
Phase 1B has schedule priority
.
The Phase 1D Short-term Expansion continues improvements at the EWCWTP to treat up to 13 MGD of additional surface water from Granger Lake by expanding raw water pumping capacity, upgrading storage reservoir inlets, outlets, and pumping capacity, upgrades to existing chemical systems, upgrades to electrical and automation systems, new rapid mix system, two new clarifiers, modify piping at four existing filters, four new additional filter systems, new backwash basin demolition of existing components and structures being replaced or removed, an additional 4.25 MG of finished water storage capacity for storage of blended treated groundwater (from Phase 1B) with treated surface water (from Phase 1D), and access road improvements. Phase 1D also includes a new medium service pump station for transmission of the finished water to the BRA’s existing and potential new customers, while providing future buildout resilience for longer term expansion.

With GovernmentContracts, you can:
...- MAINTENANCE OF DREDGING FACILITIES NAICS Code: 237990 - Other Heavy and Civil ...
DEPT OF DEFENSE
Bid Due: 11/09/2026
...- Other Heavy and Civil Engineering Construction Place of Performance: El Paso , ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 11/12/2026
...; 91227-Construction, Irrigation System; 91300-Construction Services, Heavy (Incl. Maintenance And...., Construction Contingency; 91115-C.I.P., ...
State Government of Texas
Bid Due: 12/03/2026
...Code: 237990 - Other Heavy and Civil Engineering Construction Place of Performance: TX ...
DEPT OF DEFENSE
Bid Due: 11/19/2026