| Location: | Vermont |
|---|---|
| Posted: | Jul 10, 2026 |
| Due: | Aug 18, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Chittenden Keywords: Building Materials and Supplies, Construction (Building), Electrical Equipment and Supplies, HVAC, Painting Contractor, Well Drilling, Wire and Cable, Windows and Window Decor, Electrical Contractor, Construction (Non Building), Insulation Contractor, Masonry, Building Rehabilitation, Concrete, General Contractor, Heating Equipment, Heating Installation and Services, Paving Contractor, Pedestrian Walkways, Road Construction, Roofing Contractor Bid Description: This project consists of but is not limited to three separate interrelated but independent construction projects to make improvements to the Biathlon Complex at the Ethan Allen Firing Range in Jericho, Vermont. DOCUMENTS: Bona fide Bidders may obtain drawings and specifications from John Medenwald john.medenwald@partner.vermont.gov or Keith Schnell keith.schnell@partner.vermont.gov
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...or individuals to provide engineering services for design and construction management concerning Town's...) ...
State Government of Vermont
Bid Due: 9/24/2026
...-of-way (ROW) services; utility relocation services; developing construction schedules; independent... cost estimating; advertisement ...
State Government of Vermont
Bid Due: 10/28/2026
...), Engineering , Construction (Non Building), General Contractor, Paving Contractor, Planning and Design... ...
State Government of Vermont
Bid Due: 9/18/2026
...wastewater system improvement project. Construction is anticipated to begin in September 2026 and ...
State Government of Vermont
Bid Due: 10/05/2026