| Location: | Georgia |
|---|---|
| Posted: | Oct 20, 2026 |
| Due: | Oct 22, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Thursday, October 22, 2026
Bid Time: 2:30 p.m.
Contact: Stephanie Jones, (706) 863-8800
Addendum: Addendum Nos. One and Two have been issued.
Installation of approximately 6.49 miles of water main along Inner Perimeter Road and South Patterson Street including 24,693 linear feet of PVC water line ranging from 12” to 20” by excavation and 7,400 linear feet of Fusible PVC water line of similar size by directional bore, 2,162 of push-on or restrained joint ductile iron water line ranging from 12” to 20”, and 1,436 linear feet of steel casing ranging from 24” to 36” by jack and bore, 28 fire hydrants complete, 22 resilient seated gate valves and valve boxes ranging from 8” to 20”, pavement removal and replacement.

With GovernmentContracts, you can:
...BID #27021 Irrigation Valve Replacement at Holland Youth Sports Complex RE-BID Athens-Clarke County... ...
State Government of Georgia
Bid Due: 11/18/2026
...27012-3802, Richland Creek WTP Pressure Reducing Valve & Flow Meter Vault Paulding County... ...
State Government of Georgia
Bid Due: 11/13/2026
...ten conventional filters. Each filter has six individual valves; left influent, right influent..., ...
State Government of Georgia
Bid Due: 12/03/2026
...complete with Pressure reducing valve, meter, and double detector check valve assembly located ...
State Government of Georgia
Bid Due: 11/13/2026