| Location: | Texas |
|---|---|
| Posted: | Sep 1, 2026 |
| Due: | Sep 17, 2026 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF26B000014 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE
PROJECT NUMBER: TX FW LGA 10(5)
PROJECT NAME: STEVE THOMPSON WILDLIFE DRIVE
PROJECT DESCRIPTION:
The proposed project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps.
The project includes three alternate bid items for Aggregate Surface Course (TON) with one being awarded.
Alternate 1: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area.
Alternate 2: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive.
Alternate 3: 3-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area.
PRINCIPAL WORK ITEMS: The project includes the following work items:
Full Depth Reclamation (MILE) – 13 MILE
Aggregate Surface Course (TON) – 11,000 TON
ANTICIPATED SCHEDULE: The anticipated advertisement date is September 2026 with construction beginning in January 2027, and project completion in August 2027.
ORDER OF MAGNITUDE: The proposed project cost ranges between $2,000,000 and $5,000,000.

With GovernmentContracts, you can:
...: Construction/Public Works Project Description: The major work will consist of the (approximate... ...
City of Fort Worth
Bid Due: 10/01/2026
...Project: PW 2027 Concrete Restoration Contract 1 City Project No. 106802 Ref. #: ...
City of Fort Worth
Bid Due: 9/24/2026
...Procurement Type: Construction/Public Works Project Description: The major work will consist... Treated Flexiblebase, ...
City of Fort Worth
Bid Due: 9/24/2026
...Project: PW 2027 Concrete Restoration Contract 4, City Project No. 106795 Ref. #: ...
City of Fort Worth
Bid Due: 9/24/2026