| Location: | Nevada |
|---|---|
| Posted: | Sep 1, 2026 |
| Due: | Sep 10, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | F4FANG6133A001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site. Also, the relocation of the four existing structures and demolition of the 5th sunshade. Four current sunshades will be turned perpendicular and align with the new sunshades. The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron: 1) Four CCA shade structures that include four aircraft parking bays each. The new shade structures will be located on south ramp west of the current shade structures. 2) Column concrete footings, per footing, as needed. 3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light. 4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure.
***This solicitation has been amended on 10 August 2026 to include attachment 4: EOU Sunshade RFI.***
***This solicitation has been amended on 1 September 2026 to extend the quote due date to 10 September 2026.***
Attachment 1: Combo
Attachment 2: SOW
Attachment 3: Sunshade Map
Attachment 4: EOU Sunshade RFI
| Jun 23, 2026 | [Combined Synopsis/Solicitation (Original)] EOU Sunshades Creech AFB |
| Jun 25, 2026 | [Combined Synopsis/Solicitation (Updated)] EOU Sunshades Creech AFB |
| Jul 24, 2026 | [Combined Synopsis/Solicitation (Updated)] EOU Sunshades Creech AFB |
| Aug 4, 2026 | [Combined Synopsis/Solicitation (Updated)] EOU Sunshades Creech AFB |
| Aug 10, 2026 | [Combined Synopsis/Solicitation (Updated)] EOU Sunshades Creech AFB |
| Aug 18, 2026 | [Combined Synopsis/Solicitation (Updated)] EOU Sunshades Creech AFB |
| Aug 26, 2026 | [Combined Synopsis/Solicitation (Updated)] EOU Sunshades Creech AFB |
| Sep 2, 2026 | [Combined Synopsis/Solicitation (Updated)] CANCELLATION NOTICE: EOU Sunshades Creech AFB |

With GovernmentContracts, you can:
...Description: The project will include asbestos abatement and the demolition and removal of ...
City of Sparks
Bid Due: 9/23/2026
...of demolition of non-bearing partial height walls, new ceiling, new flooring, and new ...
State Government of Nevada.
Bid Due: 9/24/2026
...of demolition of non-bearing partial height walls, new ceiling, new flooring, and new ...
State Government of Nevada.
Bid Due: 9/24/2026
...of demolition of non-bearing partial height walls, new ceiling, new flooring, and new ...
State Government of Nevada.
Bid Due: 9/16/2026