RE: TMUA PROJECT NO. WPC 26-4, FY'26 SOUTHSLOPE CAPITAL EQUIPMENT REPLACEMENTS
SUBJECT: ADDENDUM 1 - 4/1/2026
Dear Ms. Cantero:
This Addendum 1 consisting of nine (9) items is, hereby, made a part of the Contract Documents to the
same extent as though it were originally included, therein, and shall supersede anything contained in
the Plans and Specifications with which it might conflict. Receipt of this Addendum 1 shall be denoted
in Bidder's Proposal. Failure to do so will result in the bid being deemed non-responsive.
1. Pre-Bid Conference Bidder Question #1
a. Question: "Will you please clarify the Basis of Award?"
b. Response: Refer to the Proposal, page P-2, paragraph titled "Basis of Award."
2. Pre-Bid Conference Bidder Question #2
a. Question: "Are bidders required to submit two printed copies of their Proposal?"
b. Response: No, submit one (1) printed hardcopy of your bid proposal forms.
3. Pre-Bid Conference Bidder Question #3
a. Question: "Are bidders required to submit an electronic flash drive with their Proposal?"
b. Response: No, do not submit an electronic flash drive.
4. Pre-Bid Conference Bidder Question #4
a. Question: "What is to be done with the existing electrical conduit and box located at the scum pit?"
b. Response: Remove and replace junction box and a portion of conduit run as shown in Addendum 1,
revised Sheet 4 and revised Sheet 5.
5. Pre-Bid Conference Bidder Question #5
a. Question: "Will the existing damper on the Odor Control Piping at the scum pit need to be reinstalled?
If so, this will require an additional pipe spool in order to get the attachment flange at the right
elevation."
b. Response: Yes, the existing damper shall be reinstalled. Add a PVC spool pipe as shown in Addendum
1, revised Sheet 5.
6. Pre-Bid Conference Bidder Question #6
a. Question: "The existing pressure gauges [on STP01 discharge and on STP02 discharge] are installed
on isolation rings. Are the new gauges to be installed on isolation rings as well? Do you have P&ID
drawings available of this area [of Digester 3&4]?
5300 S Elwood Ave, Tulsa OK 74107 | (918) 591-4482 | (918) 405-4907
Page 1
b. Response: Yes, install pressure gauges and switches on isolation rings to match the existing
configuration. And, yes, Owner will provide available information regarding existing equipment
during construction.
7. Refer to SHEET 4 - ADD. ALT. #1 SCUM PIT HATCH REPLACEMENT
a. Replace entire drawing with the attached drawing.
b. Revise C - DEMOLITION PLAN as shown on the revised drawing.
c. Add D - I/O CABLE PRESERVATION NOTES as shown on the revised drawing.
8. Refer to SHEET 5 - ADD. ALT. #1 SCUM PIT HATCH REPLACEMENT
a. Replace entire drawing with the attached drawing.
b. Revise B - SCUM PIT HATCH PLAN as shown on the revised drawing.
9. Refer to SHEET 7 - CC MAKE-UP AIR UNIT REPLACEMENT
a. Replace entire drawing with the attached drawing.
b. Revise B - EXISTING ROOF PLAN as shown on the revised drawing.
Sincerely,
Samuel H. Ray, P.E., S.E.
3/31/2026
5300 S Elwood Ave, Tulsa OK 74107 | (918) 591-4482 | (918) 405-4907
Page 2
VIEW LOOKING NORTHEAST
A PHOTO OF EXISTING SCUM PIT
REMOVE ELECTRICAL JUNCTION BOX.
SEE I/O CABLE PRESERVATION NOTES.
REMOVE AND PRESERVE ALL
HANDRAILS. DELIVER
HANDRAILS TO CITY OF TULSA
FOR STORAGE. CUT OFF
ANCHORS FLUSH WITH
CONCRETE.
REMOVE AND DISPOSE OF
ALL METAL COVER PLATES.
REMOVE HANDWHEEL, AND CUT
OFF EXTENSION ROD BELOW
HATCH.
REMOVE FRP ODOR CONTROL
GOOSENECK, AND DELIVER IT TO
CITY OF TULSA FOR STORAGE.
REMOVE CONDUIT
AS SHOWN AND
BACK TO WEST TO
VERTICAL BEND.
REFER TO I/O CABLE
PRESERVATION
NOTES.
C DEMOLITION PLAN
5 5/8"±
6"±
10'-1"±
9'-1"±
8'-1 3/4"±
5 5/8"±
6"±
INSIDE FACE
OF CURB
INSIDE FACE
OF PIT WALL
OUTSIDE FACE
OF CURB
1
PHOAT/O4
B EXISTING SCUM PIT PLAN
1
REMOVE FRP ODOR CONTROL DAMPER AND
1. THE EXISTING CONDUIT AND ELECTRICAL
180 PIPE BEND, AND PRESERVE THESE
JUNCTION BOX CONTAIN AN I/O CABLE
COMPONENTS FOR REINSTALLATION.
THAT IS IN SERVICE AND SHALL BE
PRESERVED.
2. COORDINATE THE SCHEDULING OF THIS
REMOVE AND DISPOSE OF ALL
HATCHES, PANELS AND FRAMES.
WORK WITH PLANT STAFF.
3. DISCONNECT CABLE FROM ITS TERMINAL
END IN CABINET RIO10 IN WEST PUMP
HOUSE.
4. WITHDRAW CABLE FROM CONDUIT AND
JUNCTION BOX TO FACILITATE DEMOLITION
OF CONDUIT AND BOX.
5. MAXIMUM TIME CABLE MAY REMAIN
DISCONNECTED IS TWELVE (12) HOURS IN
ONE DAY FROM 7:00AM TO 7:00PM.
6. SEE B/5 FOR CONDUIT AND JUNCTION
BOX REPLACEMENT.
REMOVE AND DISPOSE OF ALL
D SUPPORT FRAMING CONNECTED TO PIT
WALLS.
I/O CABLE PRESERVATION
NOTES
ALL WORK ON THIS SHEET IS
IN ADDITIVE ALTERNATE #1.
1 ADDENDUM 1 - ISSUED 4/1/2026
SHEET TITLE:
ADD. ALT. #1
SCUM PIT HATCH REPLACEMENT
PROJECT:
WPC 26-4 CAPITAL
EQUIPMENT REPLACEMENTS
OWNER:
CITY OF TULSA, OKLAHOMA
TULSA METROPOLITAN UTILITY AUTHORITY
ENGINEER:
SAMUEL H. RAY, P.E.
APPROVAL:
____________________________________
WPC SECTION MANAGER
ISSUE DATE:
FEBRUARY 12, 2026
SHEET NUMBER:
4 OF 11 SHEETS
BEAM CENTERLINE
6061 T6 ALUMINUM WIDE FLANGE
BEAM, DEPTH=6", WIDTH=6",
THICKNESS=0.240", WITH (2)-1/2" DIA.
STAINLESS STEEL HILTI HIT-HY 200
ADHESIVE ANCHORS AT EACH END
WITH 4 1/2" EMBEDMENT.
DETAIL
C/5
INSIDE FACE
OF CURB
INSIDE FACE
OF PIT WALL
BELOW
A SCUM PIT FRAMING PLAN
OUTSIDE FACE
OF CURB
TOP OF BEAM ELEVATION
SHALL MATCH TOP OF EXISTING
CONCRETE CURB ELEVATION.
HATCHES AND SAFETY
GRATE SYSTEM
ALUMINUM WIDE FLANGE BEAM
1/4"x5"x0'-10" REINFORCED
NEOPRENE BEARING PAD
EACH END OF BEAM
TOP OF CURB
OUTSIDE FACE OF CURB
EXISTING CONCRETE
PAVING
C SCUM PIT DETAIL
12"x12" WEATHERPROOF 316
STAINLESS STEEL JUNCTION BOX.
CONNECT TO EXISTING BURIED
VERTICAL CONDUIT AND TO NEW
HORIZONTAL CONDUIT.
ADD 8" SCH. 80 PVC SPOOL
PIPE TO RAISE 180 PIPE BEND
1
AND DAMPER UP TO FIT ON
NEW HATCH.
(4) HATCHES AS SHOWN WITH
INTEGRAL FALL PROTECTION
SAFETY GRATE BELOW EACH
HATCH, SPEC. 214.01
3'-9"
3'-9"
8" DIA. HOLE THROUGH HATCH
WITH 3/4" No. 9 STAINLESS STEEL
EXPANDED METAL MESH MOUNTED
TO UNDERSIDE OF HATCH.
1 1/2" I.D. ALUMINUM CONDUIT RUN FROM
NEW JUNCTION BOX TO WEST TO VERTICAL
BEND. MOUNT CONDUIT AT GROUND LEVEL
AND WITHIN 2" OF CONCRETE CURB. PULL
EXISTING I/O CABLE BACK THROUGH NEW
JUNCTION BOX AND NEW CONDUIT, AND
RECONNECT TO TERMINAL BLOCK IN
CABINET RIO10 IN WEST PUMP HOUSE.
1'-0"
INSIDE FACE
OF CURB
INSIDE FACE
OF PIT WALL
BELOW
B SCUM PIT HATCH PLAN
REINSTALL AND RECONNECT
FRP ODOR CONTROL DAMPER
AND 180 PIPE BEND.
(1) SOLID FIXED PANEL WITH
8" DIA. HOLE AT FRP ODOR
CONTROL FLANGE.
OUTSIDE FACE OF CURB
ALUMINUM FRAME SET ON
TOP OF EXISTING CONCRETE
CURB AND FASTENED WITH
(8)-1/2" DIA. STAINLESS STEEL
HILTI HIT-HY 200 ADHESIVE
ANCHORS WITH 4 1/2"
EMBEDMENT.
SHEET TITLE:
ADD. ALT. #1
SCUM PIT HATCH REPLACEMENT
PROJECT:
WPC 26-4 CAPITAL
EQUIPMENT REPLACEMENTS
OWNER:
CITY OF TULSA, OKLAHOMA
TULSA METROPOLITAN UTILITY AUTHORITY
ENGINEER:
SAMUEL H. RAY, P.E.
(1) SOLID FIXED PANEL
ALL WORK ON THIS SHEET IS
IN ADDITIVE ALTERNATE #1.
1 ADDENDUM 1 - ISSUED 4/1/2026
APPROVAL:
____________________________________
WPC SECTION MANAGER
ISSUE DATE:
FEBRUARY 12, 2026
SHEET NUMBER:
5 OF 11 SHEETS
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.