| Location: | Colorado |
|---|---|
| Posted: | Feb 27, 2025 |
| Due: | Mar 7, 2025 |
| Agency: | State Government of Colorado |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NCS1-PKAA-2025000245-1 |
| Publication URL: | To access bid details, please log in. |
Description: PKAA, ,Marshall Coal Fire Mitigation Project
Department: DNR - Division of Reclamation Mining & Safety
Buyer: Teresa Ryan
Solicitation Number: NCS1-PKAA-2025000245-1
Type: Notice of Contractor Settlement (NCS1)
Category: Construction
Closing Date and Time: 03/07/2025 11:45 AM MST
| Line Number | Commodity Description | Details | Requested | |
|
1
|
The project work will involve mitigating the subsurface coal fire by excavating the burning/smoldering coal and thoroughly blending the hot material with cold overburden until the temperature of the blended material is below eighty degrees Fahrenheit (80°F). The cooled and blended material will then be used to backfill the excavation. The excavation, blending and backfilling operations will occur in a rolling manner so that only a portion of the mitigation area is open at any one time. A portion of the mitigation area is planned to be re-developed for use as the Marshall Mesa Trailhead. In the areas planned for the trailhead re-development, compacted backfill will be required. All areas within the trailhead re-development will be rough graded to elevations provided in the Site Plans. Outside of the trailhead re-development area the mitigated areas will be graded to resemble the surrounding natural topography, seeded and hydro-mulched. It is estimated that 182,000 cubic yards of material will be excavated and blended during the mitigation process.
|
Specifications
Commodity Code
96273
|
Service From
09/30/2024
Service To
02/28/2025
|
View Purchase History
Additional Information
|

With GovernmentContracts, you can:
...Construction of the Deer Creek Road, Base Camp Road, Microscope Way Project Solicitation ...
El Paso County
Bid Due: 6/24/2026
...Improvements - Package 2 Construction 06/30/26 02:00 PM 06/30/26 02:01 PM Accepting Proposals...
City of Longmont
Bid Due: 6/30/2026
...Follow Notice of Intent to Award to Corsentino Construction, Inc. for fire suppression ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 6/24/2026
...Quote (DQ1) Category: Construction Closing Date and Time: 06/23/2026 04:00 PM MDT Buyer ...
State Government of Colorado
Bid Due: 6/23/2026