| Location: | Virginia |
|---|---|
| Posted: | Feb 26, 2025 |
| Due: | Mar 18, 2025 |
| Agency: | Chesapeake Public School |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: HVAC Replacement Project - Greenbrier Intermediate School
Addenda: 0
Release Date: 2/26/2025
Due Date: 3/18/2025
The work primarily consists of, but is not limited to, the removal of water source heat pumps; removal of all condenser water and hot water piping, and insulation. Removal of existing hot water and condenser water generating equipment, pumping and piping systems. Installation of new hot water and condenser water generating and pumping systems, including piping network to support new heating pumps. Construction of new equipment closets in perimeter classrooms for installation of the new heat pumps. Installation of new heat pumps in place of existing (removed) units. Installation of new DDC System. Partial renovation to selected air distribution systems. TAB work required for the renovated systems. Partial replacement of ceilings, repair of floor and wall surfaces impacted by the construction of the new equipment closets. Project includes phasing construction over two summers. Refer to Plans.

With GovernmentContracts, you can:
...needed to maintain correct temperature. To Furnish Fujitsu (or equal to) 4T Mini-Split ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026
..., air devices, refrigerant piping and condenser units. Hard ceiling and lighting in ...
DEPT OF DEFENSE
Bid Due: 6/25/2026
..., Naval Air Station Oceana, including FCUs, ductwork, air devices, refrigerant piping and ...
DEPT OF DEFENSE
Bid Due: 6/25/2026