| Location: | California |
|---|---|
| Posted: | Jul 1, 2025 |
| Due: | Aug 13, 2025 |
| Agency: | East Bay Municipal Utility District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
[Sign In] Current Construction Bid Opportunities |
| Title: | Summit Pressure Zone South Pipeline Replacement Phase 2A |
| Specification Number: | 2193 |
| Bid Walk: |
Monday, July 21, 2025, 11:00 AM
The District will conduct a pre-bid jobsite inspection tour to familiarize prospective bidders with the project site and conditions. The inspection will be conducted on July 21, 2025 at 11:00 a.m. Bidders/bid walk attendees (Attendees) shall comply with applicable Alameda County health orders. Attendees shall assemble at Firestorm Memorial Garden (near 1 Hiller Drive, Oakland 94618). All Attendees are required to have a photo ID and sign a confidentiality agreement not to share, sell, or publish photos. The Prime Contractor and its subcontractors are strongly encouraged to attend the jobsite inspection where a "sign-in" sheet will be provided. For pre-bid jobsite inspection questions only, call Ben Townley at (510) 287-2147. |
| Project Engineer: | J. Mittal |
| Bid Opening Date: | Wednesday, August 13, 2025, 1:30 PM |
| Estimated Cost: | $3,000,000 to $3,500,000 |
| Description: |
Work includes:
• Furnish and install approximately 1,935 horizontal linear feet (LF) of 24-inch, 30 LF of 16-inch and 55 LF of 12-inch mortar lined and coated steel (ML&CS) pipe, all connection piping, appurtenances, and fittings. • Remove three trees within Caltrans right-of-way as approved by the Engineer. • Provide required traffic control measures. • Remove and dispose of abandoned pipelines for installation of new pipelines. • Provide final restoration of pavement and restore Firestorm Memorial Garden landscaping. • Perform related required work as shown on the Drawings and as specified. |

With GovernmentContracts, you can:
Project ID: 2026-RFP-0415 Title: Mobile Substation Project Addenda: 0 Release Date: 9/2/2026 Due
City of Pasadena
Bid Due: 10/14/2026
Follow F110 VALVE ASSEMBLY, NSN: 2995-01-390-3690PR, PN: 1584M19P02 Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 10/05/2026
Project ID: 94867 Title: On Call Financial Consulting Services for Development Impact Fee
Sacramento County
Bid Due: 10/08/2026
Request for Qualifications - On-Call Environmental Planning Services The Sacramento County Department of
Sacramento County Department of Airports
Bid Due: 10/13/2026